MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Structural drawings and calculations in Manor — a steel beam schedule and load-path detail signed by an engineer
Manor · Structural Engineer's Drawings & Calculations

Structural drawings and calculations in Manor

Engineer's calculations for a Manor project — steel beams sized, padstones and load paths worked out and a signed calculations package your builder and Adur District Council's building control can build from, delivered in days and revised free until it is approved.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Manor householder planning by the numbers

Adur District Council granted 96% of the householder planning decisions it made in its latest published year — 9 points above the 87% England-wide householder average. Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.

Under Class B, a rear dormer stays permitted development up to 40m³ of added roof volume on a terrace or 50m³ on a semi-detached or detached house, while Class A allows a single-storey rear extension of 3m beyond the original rear wall on a terrace and 4m on a detached house before a full application is needed. Manor carries at least one Article 4 direction, and conservation areas including North Lancing remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Manor is determined against an 8-week statutory target.

North Lancing (conservation area designated in 1975), Coombes (civil parish within Manor) and Lancing (civil parish within Manor) — these are the Manor pockets our drawings cover most. Heritage designations here include North Lancing. Adur District Council weighs each proposal against the adopted Adur local plan and Adur District Council's design guidance for householder work, where the 1,770 homes here are 41% 1930-1939, 21% 1955-1964, 14% 1945-1954, which is what sets the realistic roof and rear-projection options. On roofs the borough is hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building, over 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%).

What actually constrains a project in Manor

Manor's designated heritage is specific, and it is the first thing we check against your address: North Lancing (conservation area designated in 1975). Inside those boundaries permitted development is curtailed and Adur District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Manor takes in Coombes and Lancing. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor.

On stock, Manor is 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%) — which is why hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building govern what a loft or rear projection can realistically be. Adur District Council decided 210 householder applications in the latest published year and granted 96%, with 60% issued inside the eight-week target. Those are the numbers our drawings are prepared against.

The full build-period split for Manor runs pre-1900 3% (60 homes), 1900-1918 1% (10 homes), 1919-1929 3% (50 homes), 1930-1939 41% (730 homes), 1945-1954 14% (240 homes), 1955-1964 21% (380 homes), 1965-1972 6% (110 homes), 1973-1982 3% (60 homes), 1983-1992 2% (40 homes) and 2000-2008 2% (30 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Adur District Council also decides for St Mary's and Southwick Green, so a decision in Manor sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

The Article 4 directions recorded for this council include 1 Southdown Road, Southwick, Church Street, Shoreham-by-Sea, Kingston Buci Conservation Area and Land adjoining Steyning Road, Shoreham-by-Sea. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.

Manor in numbers — housing stock and planning decisions

Published figures for Manor and Adur District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureManor
Dwellings recorded1,770
Built pre-190060 (3%)
Built 1900-191810 (1%)
Built 1919-192950 (3%)
Built 1930-1939730 (41%)
Built 1945-1954240 (14%)
Built 1955-1964380 (21%)
Built 1965-1972110 (6%)
Built 1973-198260 (3%)
Built 1983-199240 (2%)
Built 2000-200830 (2%)
Built before 19194%
Built 1919–193944%
Built 1945–200849%
Conservation areas in Manor1 (North Lancing)
Conservation areas district-wide7
Article 4 directions recorded9
Householder applications decided210
Householder applications granted96%
Decided within 8 weeks60%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Adur District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What a structural package covers on a Manor project

The moment a wall comes out or a new floor goes in, something has to carry the load that wall or floor was holding — and building control will not accept "it looks strong enough". The engineer traces the load path: the weight of the roof, floors and walls above is gathered into a beam, the beam is sized in steel or timber to carry it within safe deflection, and that load is passed through padstones into the masonry and down to the ground. On Manor's 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%), the spans and loads differ house to house, so every calculation is specific to the property.

The deliverable is two things that work together: the calculations, which show the maths an approved inspector can check, and the structural drawings, which turn that maths into something a builder can order and fit — a beam schedule with sizes and lengths, bearing and padstone details, and connection notes. Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal, and the calculations are drawn to sit alongside the architectural set rather than contradict it. Everything is signed by a chartered or incorporated engineer carrying professional indemnity insurance.

Older Manor stock — the kind found across North Lancing — often hides the real structural question: shallow Victorian foundations, timber that has been notched by past work, or a wall that turns out to be load-bearing when the drawings assumed otherwise. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor. A survey-based calculation catches this before the wall is opened, not after.

Structural calculations package for a Manor building project

When do I need structural calculations in Manor?

Building control needs an engineer's calculations whenever you change how the building carries load. On a typical Manor project that means any of these:

  • Removing or forming an opening in a load-bearing wall of a Manor home — a knock-through, a wide opening or a chimney breast
  • Converting a loft on the borough's 1930s semi-detached and detached houses (41% of 1,770 homes), where the existing ceiling joists cannot carry a floor and new steels are needed
  • Any Manor extension, where the new opening into the house and the extension's own roof and floor need beams
  • Inserting a steel beam, lintel or column, or replacing rotten or overloaded structure in an older Manor property
  • Underpinning, a basement, or any change to a Manor property's foundations
  • Where Adur District Council's building control, your builder or a party wall surveyor specifically asks for a signed calculation

Manor building activity — live from council data

Below is Adur District Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Adur District Council granted 96% of its householder applications in the year to 31 March 2026, and North Lancing shapes what is approved here. Structural calculations sit behind building control rather than planning, but the same wave of loft, extension and knock-through work that drives these decisions is exactly what needs an engineer's package.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

96%householder applications approved in Adur
87%national average — Adur is 9 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

How structural calculations get approved in Manor

Building control approves structural work by checking the numbers, not by looking at the finished steel. Adur District Council's inspector, or an approved inspector acting for you, reads the calculations to confirm the beam is deep enough for its span, that deflection stays within limits so ceilings do not crack, that the bearing length and padstones spread the point load into masonry that can take it, and that the load has somewhere to go all the way to the ground. Across North Lancing, Coombes and Lancing, the recurring issue is a beam sized off a rule of thumb that the actual span will not support.

The 1,770 homes here are 41% 1930-1939, 21% 1955-1964, 14% 1945-1954, which is what sets the realistic roof and rear-projection options. We issue calculations detailed enough to be signed off without a query, coordinate them with the architect's drawings so nothing conflicts on site, and stay available to revise if the builder finds the Manor property is not quite as the survey assumed — free, until the work is approved.

Beam schedule and load calculations for a Manor project

Structural work across Manor

We calculate beams, openings and floors on the period and modern stock across the borough. A few of the Manor neighbourhoods where structural packages come up most often:

North Lancing

Structural calculations for North Lancing's conservation area designated in 1975 — beams sized, load paths traced and signed for Adur District Council's building control.

Coombes

Structural calculations for Coombes's civil parish within Manor — beams sized, load paths traced and signed for Adur District Council's building control.

Lancing

Structural calculations for Lancing's civil parish within Manor — beams sized, load paths traced and signed for Adur District Council's building control.

What structure does each Manor project need?

Different jobs load the building differently, so each needs its own calculation. This is what the common Manor projects typically require.

ProjectTypical structureWhat the calculation provesSigned off by
Wall knock-throughSteel beam on padstonesSpan, deflection and bearingBuilding control
Loft conversionNew floor beams and ridge/purlin steelsFloor loading and roof supportBuilding control
Rear or side extensionOpening beam plus extension roof and floorCombined loads and foundationsBuilding control
Basement or underpinningRetaining and foundation designGround and adjacent-building loadsBuilding control & party wall

On older Manor stock around North Lancing, shallow foundations and altered structure often mean the calculation drives the design rather than following it.

Four steps to a signed Manor structural package

A fixed process built around building control rather than planning — most calculation packages are ready within five days of the architectural drawings.

  1. 1

    Free feasibility check

    Send us your Manor postcode and the architect's drawings or a sketch. We confirm what structure the project needs, flag any load-bearing wall or foundation question, and tell you exactly what the calculation package will cover.

  2. 2

    Structural survey

    Where the loads are not obvious — an unknown wall, an old alteration, a deep span — we survey the property so the beam is sized on what is really there, not an assumption.

  3. 3

    Calculations & structural drawings

    A chartered or incorporated engineer sizes the steel, works the padstones and load path, and issues the signed calculations and a beam schedule coordinated with your Manor architectural set.

  4. 4

    Approval & site support

    We submit the calculations to Adur District Council's building control or your approved inspector, answer queries, and revise free if the build uncovers something the survey could not see.

Frequently asked questions

When do I need structural calculations in Manor?

Whenever you change how the building carries weight — removing or opening a load-bearing wall, converting a loft, building an extension, or inserting a beam or column. Adur District Council's building control needs an engineer's calculation to approve any of these before the steel goes in. A Manor project that only redecorates or moves a non-structural partition does not, but almost anything that opens the structure does.

Are structural calculations part of planning permission in Manor?

No — they are a separate, later step. Planning permission decides whether Adur District Council will allow the change; structural calculations prove the change is safe to build and are submitted to building control, not to the planners. Many Manor projects that need no planning permission at all — an internal knock-through, a permitted-development loft — still need a full engineer's calculation before work can lawfully start.

Who signs the structural calculations for a Manor project?

A chartered or incorporated structural engineer, carrying professional indemnity insurance, who takes responsibility for the numbers. Adur District Council's building control, or an approved inspector acting on your behalf, then checks and signs them off. Your builder cannot self-certify a steel beam, and an unsigned calculation will not be accepted — the engineer's signature and insurance are what make the package one building control will approve. This applies to your Manor address specifically.

Can you size the steel beam for a knock-through in Manor?

Yes — a beam over a removed wall is the most common calculation we do. We work out the load the wall was carrying, size a steel or timber beam to span the opening within safe deflection, and detail the padstones that spread its weight into the masonry each side. The result is a beam schedule your Manor builder can order and Adur District Council's inspector can approve, with the load traced all the way to the foundations.

Do I need a structural survey before the calculations in Manor?

Sometimes. Where the loads are clear from the drawings we can calculate directly, but Manor's older stock often hides surprises — a wall that turns out to be load-bearing, notched or altered joists, or shallow foundations near North Lancing. In those cases a short structural survey means the beam is sized on what is really there, which avoids a redesign once the builder opens the wall. Adur District Council is the decision-maker.

How much do structural drawings and calculations in Manor cost?

We price each Manor package on the number of beams and the complexity — a single knock-through is straightforward, a whole-house loft-and-extension scheme has several elements — and send a fixed, no-obligation quote within one working day. It covers the calculations, the beam schedule and free revisions until Adur District Council's building control approves. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Structural drawings & calculations across Adur

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Manor