Planning permission vs building regulations is one of the most common points of confusion for London homeowners. They are two separate legal regimes, decided by different people on different tests. A project may need one, the other or both, and approval under one says nothing about the other. This guide sets out what each regime asks, how the routes work, where the exemptions sit and what happens when work goes ahead without either.
The Planning Portal puts it simply: planning rules determine whether you are allowed to go ahead with a building project, and building regulations set standards for its design and construction, to ensure the safety and health of people in and around the building. The first is about land use and appearance. The second is about structure, fire, insulation, drainage and similar technical matters.
Each has its own statute. Section 57 of the 1990 Act says planning permission is required for the carrying out of any development of land. Regulation 4 of the Building Regulations 2010 says building work must comply with the applicable requirements in Schedule 1, and that in complying with one there must be no failure to comply with another. Building work is defined in regulation 3 and includes the erection or extension of a building and the material alteration of one.
Planning practice guidance spells out the link. It says that even if a planning application is not needed, other consents may be required, and that permitted development rights do not override the requirement to comply with other permission, regulation or consent regimes. Our guide to permitted development rights covers the planning side of that.
The two regimes differ on the question asked, the body that decides, the approval route, the proof you hold afterwards and the time limits that follow work done without them.
| Point | Planning permission | Building regulations |
|---|---|---|
| Question answered | Is the development acceptable in principle: use, size, appearance, neighbours | Does the work meet Schedule 1: structure, fire, drainage, energy, ventilation and so on |
| Who decides | The local planning authority, usually the council | A building control body: the local authority, or a private registered building control approver |
| Householder timescale | The Planning Portal says a decision should be made within 8 weeks of a valid application | A full plans decision within five weeks of receipt, or a longer period agreed in writing (Building Regulations 2010, reg 14A(6)) |
| Proof that work is lawful | A decision notice, or a lawful development certificate under section 192 | A completion certificate under regulation 17, which is evidence but not conclusive evidence |
| Starting the work | Development generally must begin within three years of the grant in England unless the notice says otherwise | Notice to the body before work starts, and at stages through the job |
| If ignored | Enforcement notice under section 172 of the 1990 Act | Offence under section 35, compliance notice, or a notice under section 36 of the Building Act 1984 |
Sources: Planning Portal, difference between building regulations and planning permission, full plans and full planning consent pages; Town and Country Planning Act 1990 ss.57, 91, 172 and 192; Building Regulations 2010 regs 3, 4 and 17; Building Act 1984 ss.35 to 36, legislation.gov.uk. Read 13 October 2026. Planning Portal pages carry no date.
Most projects fall into one of three groups, and the Planning Portal says that for many types of building work separate permission under both regimes will be required.
| Project | Planning permission | Building regulations |
|---|---|---|
| Internal alterations | Maybe not | Probably needed, says the Planning Portal |
| Extension within permitted development limits | No application needed | Most extensions require approval |
| Loft conversion within Class B limits | No application needed | Required to make the loft liveable, says the Planning Portal |
| Larger extension that needs an application | Needed | Usually needed, as most extensions require approval |
| Detached outbuilding under 15 square metres with no sleeping accommodation | Check the permitted development limits, which are separate | Will not normally apply, says the Planning Portal |
| Detached outbuilding of 15 to 30 square metres with no sleeping accommodation | Check the permitted development limits, which are separate | Not normally needed if at least one metre from any boundary or substantially non-combustible |
Sources: Planning Portal, difference between building regulations and planning permission; extensions: planning permission and building regulations; loft conversion building regulations; is building regulations approval needed for an outbuilding. Read 13 October 2026. Exemption from one regime is not exemption from the other.
There are two. A full plans application is checked and, if it complies, you receive a notice stating that the plans are approved. Regulation 14A(6) of the Building Regulations 2010 requires a decision within five weeks of receipt, or within a longer period you agree in writing; the Planning Portal still describes the older five-weeks-or-two-months rule. A building notice is best suited to small work, and the Portal warns that you do not have the protection of an approval of full plans, so you need to be confident the work complies.
Regulation 12 sets out when you cannot use a building notice. Work that includes the erection of a building fronting a private street needs full plans. So does work where paragraph H4 of Schedule 1 imposes a requirement, which covers building over or close to sewers and drains, a common issue on London extensions. Electrical work under Part P has its own notice or competent-person rules.
The building control body can be the local authority or a private registered building control approver. GOV.UK says private businesses doing building control work in England must be registered with the Building Safety Regulator. The older title of approved inspector has been replaced in England by registered building control approver. Our page on building regulations drawings explains the pack either route needs.

Schedule 2 to the 2010 Regulations lists classes of work that are exempt. A detached single-storey building with no sleeping accommodation and a floor area of up to 30 square metres is exempt if no point is less than one metre from the boundary or it is substantially non-combustible. A detached building of up to 15 square metres with no sleeping accommodation is exempt. A ground-level conservatory, porch, covered yard or carport open on at least two sides is exempt up to 30 square metres, with glazing requirements. An exemption from building regulations is not an exemption from planning, which is a separate regime. A garden room can be exempt from one and still need the other.
More often than people expect. Regulation 4(1B) allows an optional requirement to apply when the planning permission under which the building work is carried out specifies it by reference to the Regulations and makes it a condition. In plain terms, a planning decision can write a building standard into your project.
In the other direction, a lawful development certificate under section 192 records that proposed operations would be lawful as a matter of planning. It says nothing about building regulations. The Planning Portal's guide to the two applications says the same of the permissions themselves: building regulations approval is different from planning permission although a project may need both. Our guide to lawful development certificates explains what that certificate does and does not cover.
Party wall matters sit in a third, separate regime under the Party Wall etc. Act 1996, as our party wall surveying page explains. Planning permission and building regulations approval cover neither.
Planning enforcement limits are mostly ten years for breaches on or after 25 April 2024, and the building regulations powers run on different periods, so the date and type of breach decide the answer.
| Regime and power | Time limit | What the source says |
|---|---|---|
| Planning: operations, or change of use to a single dwelling, in England | 10 years | Section 171B(1) and (2) as amended by section 115 of the Levelling-up and Regeneration Act 2023, in force 25 April 2024 |
| Planning: operations substantially completed, or change of use to a single dwelling, before 25 April 2024 | Four years (the earlier rule) | Regulation 5 of SI 2024/452 says the amendments do not apply where the operations were substantially completed, or the breach occurred, before that date |
| Planning: any other breach | 10 years | Section 171B(3); this period existed before the 2023 Act |
| Building regulations: compliance notice, section 35B | 12 months from the contravention | Section 35B(6) of the Building Act 1984 |
| Building regulations: removal or alteration notice, section 36 | 10 years from completion | Section 36(4) as amended by the Building Safety Act 2022 from 1 October 2023 in England (previously 12 months); for work completed before October 2023, take advice |
| Building regulations: prosecution under section 35 | No limit stated | The Planning Portal says there are no time limits on bringing a prosecution |
Sources: Town and Country Planning Act 1990 s.171B; Levelling-up and Regeneration Act 2023 s.115; The Levelling-up and Regeneration Act 2023 (Commencement No. 4 and Transitional Provisions) Regulations 2024 (SI 2024/452), regs 3 and 5; Building Act 1984 ss.35, 35B and 36, as amended by the Building Safety Act 2022; Planning Portal, failure to comply with the building regulations. Wales has different limits. Read 13 October 2026.
For planning you hold a decision notice, or a lawful development certificate if you went that way. The usual condition is that development must begin within three years of the grant in England, unless the decision notice sets another period. Check the notice, because a longer or shorter period can be specified.
For building regulations you hold a completion certificate. Regulation 17 says the authority must give one where it is satisfied, after taking reasonable steps, that the relevant provisions have been complied with. Regulation 17(4) says it is evidence, but not conclusive evidence, of compliance. The Planning Portal adds that inspections are carried out only at certain stages and that if non-compliant work is not fixed, no completion certificate will be issued, which is likely to show up in a local land search when you sell.
The Approved Documents on GOV.UK run from Part A to Part T, with no Part I or Part N, and several have changed recently, so always check the current edition.
| Document | Subject | Date shown on GOV.UK |
|---|---|---|
| Part A | Structure | 1 September 2013 |
| Part B | Fire safety | Updated 16 September 2026 |
| Part F | Ventilation | 15 June 2022 |
| Part L | Conservation of fuel and power | 2021 edition incorporating 2023 amendments, now with a 2026 section |
| Part O | Overheating | 15 June 2022 |
| Part T | Toilet accommodation | 3 November 2025 |
Source: GOV.UK, Approved Documents collection and individual document pages, read 13 October 2026. The Approved Documents are guidance on how to meet the requirements in Schedule 1; they are not the requirement itself. The collection page's own last-updated date conflicts with some items, so the document pages are the better guide.
Running the two processes in parallel saves time, as long as the planning answer is settled before the construction details are fixed.
Decide whether the project is permitted development, needs a lawful development certificate or needs a householder application, and check conservation areas and Article 4 directions first.
A measured survey serves both regimes. Planning drawings show appearance and size; construction drawings show how it is built.
Full plans for anything structural, or where Part H4 applies. A building notice only for small work you are confident complies.
Read the planning decision notice for conditions, including any that call up optional building standards under regulation 4(1B).
Notify the building control body in good time, and again at the stages it asks for, before work is covered up.
File the planning decision, any certificate of lawfulness and the completion certificate together. A buyer's solicitor will ask for them.
Permitted development is a grant of planning permission only. Building regulations approval is usually still needed for an extension or loft.
A planning decision says nothing about the beams, fire escape or drainage. A project can be fully consented and still fail building control.
A building notice has no plan check, so problems appear on site. Regulation 12 requires full plans in some cases, such as building near drains.
A garden building can be exempt from building regulations under Schedule 2 and still need planning permission, or the reverse.
Planning limits changed on 25 April 2024 and the building regulations powers changed with the Building Safety Act 2022. Use the date of the work.
Ask the two questions separately. Does the project need planning permission, and does the work need to meet the Building Regulations? In most London extension and loft projects the answers are no application for the first, if permitted development applies, and yes for the second. If you are unsure, send us the address and a short description. We check the constraints for free and tell you which approvals the project is likely to need.
Our planning application drawings service covers the planning side, and our building regulations drawings pack covers the construction side.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Planning permission decides whether a development may go ahead, looking at use, size, appearance and neighbours. Building regulations set standards for how the work is carried out, covering structure, fire safety, insulation and drainage. They are separate regimes with separate decision-makers, and the Planning Portal says building regulations approval is different to planning permission, although a project may need both.
Usually yes for building work. Planning permission does not cover the construction standards. Regulation 4 of the Building Regulations 2010 requires building work to comply with Schedule 1, and the Planning Portal says most extensions require approval. Some small buildings are exempt under Schedule 2, such as certain detached outbuildings up to 30 square metres with no sleeping accommodation.
Possibly. Building regulations approval does not decide whether the development is acceptable in planning terms. Section 57 of the 1990 Act requires planning permission for development unless a permitted development right or other exemption applies. Planning practice guidance says permitted development rights do not override other consent regimes, and the reverse also holds: building regulations approval, or a building notice, grants no planning right.
Not normally. The Planning Portal says that an extension considered permitted development does not need a planning application, but most extensions require approval under the Building Regulations. Doors and windows, drainage, electrics, external walls and roofs normally have to satisfy the requirements. Some small conservatories and porches of up to 30 square metres are exempt under Schedule 2 if glazing conditions are met.
Either the local authority's building control service or a private registered building control approver. GOV.UK says private businesses wanting to do building control work in England must register with the Building Safety Regulator. The standard is the same whichever you pick. The older term approved inspector has been replaced in England by registered building control approver.
For a full plans application, regulation 14A(6) of the Building Regulations 2010 requires the decision within five weeks of receipt, or within a longer period agreed in writing (in England since 1 October 2023). The Planning Portal still gives the older five-weeks-or-two-months wording. A building notice has no plan check, so the timing depends on inspections. A householder planning application should be decided within 8 weeks of being valid, though agreed extensions are common.
The council can take action under the Building Act 1984. Section 35 makes contravening the regulations an offence, section 35B allows a compliance notice for a contravention within the last 12 months, and section 36 allows a notice requiring removal or alteration within 10 years of completion (the limit in England since 1 October 2023; it was 12 months before). Without a completion certificate, a sale can be held up.
The council can issue an enforcement notice under section 172 of the 1990 Act where there is a breach and it is expedient to do so. For operations substantially completed, or a change of use to a single dwelling, on or after 25 April 2024 the limit in England is ten years. Where those operations were substantially completed, or that change of use occurred, before 25 April 2024, the old four-year limit still applies under regulation 5 of SI 2024/452. Other breaches have a ten-year limit either way.
It is evidence, not conclusive evidence. Regulation 17(4) of the 2010 Regulations says so, and the Planning Portal says certificates are not a guarantee and that inspections happen only at certain stages. In practice it is the document a buyer's solicitor will look for. A lawful development certificate is a different thing, recording planning lawfulness only.
It depends on size, position and use, and the two regimes give separate answers. Under Schedule 2, a detached single-storey building of up to 15 square metres with no sleeping accommodation is exempt from building regulations. A building of 15 to 30 square metres can be exempt if no sleeping accommodation is included and it is at least a metre from the boundary or substantially non-combustible. Planning limits are separate.