Planning Guide · Planning Permission vs Building Regulations

Planning permission vs building regulations: which approval does your project need?

Planning permission vs building regulations is one of the most common points of confusion for London homeowners. They are two separate legal regimes, decided by different people on different tests. A project may need one, the other or both, and approval under one says nothing about the other. This guide sets out what each regime asks, how the routes work, where the exemptions sit and what happens when work goes ahead without either.

Fixed fees, published on our pricing pageAll 33 London boroughs

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day
Share

What is the difference between planning permission and building regulations?

The Planning Portal puts it simply: planning rules determine whether you are allowed to go ahead with a building project, and building regulations set standards for its design and construction, to ensure the safety and health of people in and around the building. The first is about land use and appearance. The second is about structure, fire, insulation, drainage and similar technical matters.

Each has its own statute. Section 57 of the 1990 Act says planning permission is required for the carrying out of any development of land. Regulation 4 of the Building Regulations 2010 says building work must comply with the applicable requirements in Schedule 1, and that in complying with one there must be no failure to comply with another. Building work is defined in regulation 3 and includes the erection or extension of a building and the material alteration of one.

Planning practice guidance spells out the link. It says that even if a planning application is not needed, other consents may be required, and that permitted development rights do not override the requirement to comply with other permission, regulation or consent regimes. Our guide to permitted development rights covers the planning side of that.

How do planning permission and building regulations compare?

The two regimes differ on the question asked, the body that decides, the approval route, the proof you hold afterwards and the time limits that follow work done without them.

PointPlanning permissionBuilding regulations
Question answeredIs the development acceptable in principle: use, size, appearance, neighboursDoes the work meet Schedule 1: structure, fire, drainage, energy, ventilation and so on
Who decidesThe local planning authority, usually the councilA building control body: the local authority, or a private registered building control approver
Householder timescaleThe Planning Portal says a decision should be made within 8 weeks of a valid applicationA full plans decision within five weeks of receipt, or a longer period agreed in writing (Building Regulations 2010, reg 14A(6))
Proof that work is lawfulA decision notice, or a lawful development certificate under section 192A completion certificate under regulation 17, which is evidence but not conclusive evidence
Starting the workDevelopment generally must begin within three years of the grant in England unless the notice says otherwiseNotice to the body before work starts, and at stages through the job
If ignoredEnforcement notice under section 172 of the 1990 ActOffence under section 35, compliance notice, or a notice under section 36 of the Building Act 1984

Sources: Planning Portal, difference between building regulations and planning permission, full plans and full planning consent pages; Town and Country Planning Act 1990 ss.57, 91, 172 and 192; Building Regulations 2010 regs 3, 4 and 17; Building Act 1984 ss.35 to 36, legislation.gov.uk. Read 13 October 2026. Planning Portal pages carry no date.

Does my project need planning permission, building regulations or both?

Most projects fall into one of three groups, and the Planning Portal says that for many types of building work separate permission under both regimes will be required.

ProjectPlanning permissionBuilding regulations
Internal alterationsMaybe notProbably needed, says the Planning Portal
Extension within permitted development limitsNo application neededMost extensions require approval
Loft conversion within Class B limitsNo application neededRequired to make the loft liveable, says the Planning Portal
Larger extension that needs an applicationNeededUsually needed, as most extensions require approval
Detached outbuilding under 15 square metres with no sleeping accommodationCheck the permitted development limits, which are separateWill not normally apply, says the Planning Portal
Detached outbuilding of 15 to 30 square metres with no sleeping accommodationCheck the permitted development limits, which are separateNot normally needed if at least one metre from any boundary or substantially non-combustible

Sources: Planning Portal, difference between building regulations and planning permission; extensions: planning permission and building regulations; loft conversion building regulations; is building regulations approval needed for an outbuilding. Read 13 October 2026. Exemption from one regime is not exemption from the other.

Which building regulations routes can you use?

There are two. A full plans application is checked and, if it complies, you receive a notice stating that the plans are approved. Regulation 14A(6) of the Building Regulations 2010 requires a decision within five weeks of receipt, or within a longer period you agree in writing; the Planning Portal still describes the older five-weeks-or-two-months rule. A building notice is best suited to small work, and the Portal warns that you do not have the protection of an approval of full plans, so you need to be confident the work complies.

Regulation 12 sets out when you cannot use a building notice. Work that includes the erection of a building fronting a private street needs full plans. So does work where paragraph H4 of Schedule 1 imposes a requirement, which covers building over or close to sewers and drains, a common issue on London extensions. Electrical work under Part P has its own notice or competent-person rules.

The building control body can be the local authority or a private registered building control approver. GOV.UK says private businesses doing building control work in England must be registered with the Building Safety Regulator. The older title of approved inspector has been replaced in England by registered building control approver. Our page on building regulations drawings explains the pack either route needs.

Construction site where building regulations inspections follow a full plans or building notice route in London

Where do the two regimes meet?

More often than people expect. Regulation 4(1B) allows an optional requirement to apply when the planning permission under which the building work is carried out specifies it by reference to the Regulations and makes it a condition. In plain terms, a planning decision can write a building standard into your project.

In the other direction, a lawful development certificate under section 192 records that proposed operations would be lawful as a matter of planning. It says nothing about building regulations. The Planning Portal's guide to the two applications says the same of the permissions themselves: building regulations approval is different from planning permission although a project may need both. Our guide to lawful development certificates explains what that certificate does and does not cover.

Party wall matters sit in a third, separate regime under the Party Wall etc. Act 1996, as our party wall surveying page explains. Planning permission and building regulations approval cover neither.

What are the time limits if work is done without approval?

Planning enforcement limits are mostly ten years for breaches on or after 25 April 2024, and the building regulations powers run on different periods, so the date and type of breach decide the answer.

Regime and powerTime limitWhat the source says
Planning: operations, or change of use to a single dwelling, in England10 yearsSection 171B(1) and (2) as amended by section 115 of the Levelling-up and Regeneration Act 2023, in force 25 April 2024
Planning: operations substantially completed, or change of use to a single dwelling, before 25 April 2024Four years (the earlier rule)Regulation 5 of SI 2024/452 says the amendments do not apply where the operations were substantially completed, or the breach occurred, before that date
Planning: any other breach10 yearsSection 171B(3); this period existed before the 2023 Act
Building regulations: compliance notice, section 35B12 months from the contraventionSection 35B(6) of the Building Act 1984
Building regulations: removal or alteration notice, section 3610 years from completionSection 36(4) as amended by the Building Safety Act 2022 from 1 October 2023 in England (previously 12 months); for work completed before October 2023, take advice
Building regulations: prosecution under section 35No limit statedThe Planning Portal says there are no time limits on bringing a prosecution

Sources: Town and Country Planning Act 1990 s.171B; Levelling-up and Regeneration Act 2023 s.115; The Levelling-up and Regeneration Act 2023 (Commencement No. 4 and Transitional Provisions) Regulations 2024 (SI 2024/452), regs 3 and 5; Building Act 1984 ss.35, 35B and 36, as amended by the Building Safety Act 2022; Planning Portal, failure to comply with the building regulations. Wales has different limits. Read 13 October 2026.

What proof do you hold at the end of each process?

For planning you hold a decision notice, or a lawful development certificate if you went that way. The usual condition is that development must begin within three years of the grant in England, unless the decision notice sets another period. Check the notice, because a longer or shorter period can be specified.

For building regulations you hold a completion certificate. Regulation 17 says the authority must give one where it is satisfied, after taking reasonable steps, that the relevant provisions have been complied with. Regulation 17(4) says it is evidence, but not conclusive evidence, of compliance. The Planning Portal adds that inspections are carried out only at certain stages and that if non-compliant work is not fixed, no completion certificate will be issued, which is likely to show up in a local land search when you sell.

Which Approved Documents sit behind the building regulations?

The Approved Documents on GOV.UK run from Part A to Part T, with no Part I or Part N, and several have changed recently, so always check the current edition.

DocumentSubjectDate shown on GOV.UK
Part AStructure1 September 2013
Part BFire safetyUpdated 16 September 2026
Part FVentilation15 June 2022
Part LConservation of fuel and power2021 edition incorporating 2023 amendments, now with a 2026 section
Part OOverheating15 June 2022
Part TToilet accommodation3 November 2025

Source: GOV.UK, Approved Documents collection and individual document pages, read 13 October 2026. The Approved Documents are guidance on how to meet the requirements in Schedule 1; they are not the requirement itself. The collection page's own last-updated date conflicts with some items, so the document pages are the better guide.

In what order should you tackle the two approvals?

Running the two processes in parallel saves time, as long as the planning answer is settled before the construction details are fixed.

  1. 1

    Settle the planning route

    Decide whether the project is permitted development, needs a lawful development certificate or needs a householder application, and check conservation areas and Article 4 directions first.

  2. 2

    Measure and draw

    A measured survey serves both regimes. Planning drawings show appearance and size; construction drawings show how it is built.

  3. 3

    Choose the building control route

    Full plans for anything structural, or where Part H4 applies. A building notice only for small work you are confident complies.

  4. 4

    Check conditions

    Read the planning decision notice for conditions, including any that call up optional building standards under regulation 4(1B).

  5. 5

    Give notice before you start

    Notify the building control body in good time, and again at the stages it asks for, before work is covered up.

  6. 6

    Keep both records

    File the planning decision, any certificate of lawfulness and the completion certificate together. A buyer's solicitor will ask for them.

What mistakes do homeowners make with planning permission vs building regulations?

Assuming permitted development means no approvals

Permitted development is a grant of planning permission only. Building regulations approval is usually still needed for an extension or loft.

Treating a planning grant as building approval

A planning decision says nothing about the beams, fire escape or drainage. A project can be fully consented and still fail building control.

Using a building notice for complex work

A building notice has no plan check, so problems appear on site. Regulation 12 requires full plans in some cases, such as building near drains.

Relying on an exemption from one regime

A garden building can be exempt from building regulations under Schedule 2 and still need planning permission, or the reverse.

Quoting an old enforcement time limit

Planning limits changed on 25 April 2024 and the building regulations powers changed with the Building Safety Act 2022. Use the date of the work.

What is the simplest way to settle planning permission vs building regulations?

Ask the two questions separately. Does the project need planning permission, and does the work need to meet the Building Regulations? In most London extension and loft projects the answers are no application for the first, if permitted development applies, and yes for the second. If you are unsure, send us the address and a short description. We check the constraints for free and tell you which approvals the project is likely to need.

Our planning application drawings service covers the planning side, and our building regulations drawings pack covers the construction side.

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Frequently asked questions

What is the main difference between planning permission and building regulations?

Planning permission decides whether a development may go ahead, looking at use, size, appearance and neighbours. Building regulations set standards for how the work is carried out, covering structure, fire safety, insulation and drainage. They are separate regimes with separate decision-makers, and the Planning Portal says building regulations approval is different to planning permission, although a project may need both.

Do I need building regulations approval if I have planning permission?

Usually yes for building work. Planning permission does not cover the construction standards. Regulation 4 of the Building Regulations 2010 requires building work to comply with Schedule 1, and the Planning Portal says most extensions require approval. Some small buildings are exempt under Schedule 2, such as certain detached outbuildings up to 30 square metres with no sleeping accommodation.

Do I need planning permission if I have building regulations approval?

Possibly. Building regulations approval does not decide whether the development is acceptable in planning terms. Section 57 of the 1990 Act requires planning permission for development unless a permitted development right or other exemption applies. Planning practice guidance says permitted development rights do not override other consent regimes, and the reverse also holds: building regulations approval, or a building notice, grants no planning right.

Can I build a permitted development extension without building regulations?

Not normally. The Planning Portal says that an extension considered permitted development does not need a planning application, but most extensions require approval under the Building Regulations. Doors and windows, drainage, electrics, external walls and roofs normally have to satisfy the requirements. Some small conservatories and porches of up to 30 square metres are exempt under Schedule 2 if glazing conditions are met.

Who approves building regulations in London?

Either the local authority's building control service or a private registered building control approver. GOV.UK says private businesses wanting to do building control work in England must register with the Building Safety Regulator. The standard is the same whichever you pick. The older term approved inspector has been replaced in England by registered building control approver.

How long does building regulations approval take?

For a full plans application, regulation 14A(6) of the Building Regulations 2010 requires the decision within five weeks of receipt, or within a longer period agreed in writing (in England since 1 October 2023). The Planning Portal still gives the older five-weeks-or-two-months wording. A building notice has no plan check, so the timing depends on inspections. A householder planning application should be decided within 8 weeks of being valid, though agreed extensions are common.

What happens if I build without building regulations approval?

The council can take action under the Building Act 1984. Section 35 makes contravening the regulations an offence, section 35B allows a compliance notice for a contravention within the last 12 months, and section 36 allows a notice requiring removal or alteration within 10 years of completion (the limit in England since 1 October 2023; it was 12 months before). Without a completion certificate, a sale can be held up.

What happens if I build without planning permission?

The council can issue an enforcement notice under section 172 of the 1990 Act where there is a breach and it is expedient to do so. For operations substantially completed, or a change of use to a single dwelling, on or after 25 April 2024 the limit in England is ten years. Where those operations were substantially completed, or that change of use occurred, before 25 April 2024, the old four-year limit still applies under regulation 5 of SI 2024/452. Other breaches have a ten-year limit either way.

Does a completion certificate prove my work is compliant?

It is evidence, not conclusive evidence. Regulation 17(4) of the 2010 Regulations says so, and the Planning Portal says certificates are not a guarantee and that inspections happen only at certain stages. In practice it is the document a buyer's solicitor will look for. A lawful development certificate is a different thing, recording planning lawfulness only.

Does a garden room need planning permission and building regulations?

It depends on size, position and use, and the two regimes give separate answers. Under Schedule 2, a detached single-storey building of up to 15 square metres with no sleeping accommodation is exempt from building regulations. A building of 15 to 30 square metres can be exempt if no sleeping accommodation is included and it is at least a metre from the boundary or substantially non-combustible. Planning limits are separate.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Keep reading

More plain-English planning guides from our team.