London councils decided 24,758 householder applications in 2025-26 and approved 85.6% of them. The drawings are a large part of whether an application is valid, and a valid application starts the council's eight-week clock. This page explains what each sheet is for, how a council tests validity, and links each borough's own checklist.
(Β£625 if you supply measured drawings)
Planning application drawings (householder), most homes sit between the starting price and a higher band for larger schemes
Fixed in writing after a free assessment of your property. Council planning fees are separate.
Every price is the total you pay. Checked 24 October 2026.
Each sheet answers one question for the case officer. The table gives the Planning Portal's scale and content for each sheet and describes, in our words, what the officer reads from it. If you want a plain list by project type instead, see our page on what drawings you need for planning permission.
| Sheet | Scale (Planning Portal) | What it shows | What the officer reads from it |
|---|---|---|---|
| Location plan | 1:1250 or 1:2500, on an up-to-date map, to fit A4 | Site edged red, with all land needed to carry out the work and access; other land you own nearby edged blue; enough roads and buildings around it | Which land the application covers and who else's land it touches |
| Block (site) plan | 1:200 or 1:500, with a north arrow | The size and position of the building and any extension against the boundary; other buildings; adjacent streets | How much of the plot is built on, distances to boundaries, parking and access |
| Existing and proposed floor plans | 1:50 or 1:100 | Each floor affected, labelled, with room use, windows, doors, walls and the area of an extension | The layout, the use of each room and the size of the change |
| Existing and proposed elevations | 1:50 or 1:100 | Every side affected, with openings, dimensions, wall and roof materials and finishes, and boundaries | How the building looks before and after, materials, window positions and overlooking |
| Roof plan | 1:50 or 1:100 | Roof form with rooflights, valleys, chimneys, materials and colours, for a change to the roof's shape, position or appearance | The bulk of a roof change and what is visible from the street and gardens |
| Section | 1:50 or 1:100 through a building; 1:200 or 1:500 through land | A cut through the key new parts such as stairs, floor levels, and how the work relates to neighbouring buildings; needed where ground levels change | Heights, levels and the relationship to a neighbour's windows |
| Street scene or context plan | 1:100 or 1:200 | Where the work is visible from the road, close to another building or much larger than its surroundings: level differences against neighbouring boundaries | Fit with the street and the neighbouring heights |
| Site levels plan | 1:200 or 1:500 | Proposed levels against neighbouring plots, floor levels and a fixed reference point, with a section where ground level changes | How the scheme sits on a sloping site |
| Detail drawings | 1:5, 1:10 or 1:20; some councils ask for 1:1 or 1:2 | Intricate work or replacing traditional features such as joinery, with materials specified | Whether a heritage feature is repaired or replaced like for like |
Sources: Planning Portal, plans and drawings (scales and contents); DMPO 2015, article 7(1)(c), read 14 and 15 October 2026. The last column is our description of how officers use each sheet, not a statutory test. The Planning Portal says drawings must meet quality standards to be deemed valid and that the drawings needed vary with the work.
Article 34 of the Development Management Procedure Order defines a valid application. It must meet the national requirements for the form, plans and drawings (article 7) and the other national items such as the ownership certificate and fee, and it must include any particulars or evidence the council requires under section 62(3) of the 1990 Act. A valid application is taken to have been received when everything required has been lodged and the fee paid, and the eight weeks for a non-major application run from the day after that receipt (article 34(2)(b)).
The council cannot ask for just anything. Article 34(6) says its requirements count only if the council has published the list on its website before the application is made, the item falls within that list, it is reasonable having regard to the nature and scale of the development, it concerns a matter that is reasonably thought to be a material consideration, and the list was published or republished in the two years before the application date.
If you think a requirement is not reasonable for the scale of the work, or is not about a material consideration (article 34(6)(c)), article 12 gives you a validation dispute route. You send the council a notice that names the item, gives your reasons and asks it to waive the requirement, and the council must answer by the end of the determination period, or within seven working days of your notice if it arrives in the last seven working days or later.

These boroughs' own checklist pages or documents loaded when we read them on 15 October 2026. The date column is the date the document or page states for itself, and the table lists only boroughs whose checklist we could fetch.
| Borough (council checklist) | Date shown by the council | Location plan and block or site plan scales | One local requirement it lists |
|---|---|---|---|
| Barking and Dagenham | Last updated 27 July 2026 | Location 1:1250 or 1:2500; site or block plan 1:100 or 1:200 | Parking and access details where development affects them (Local Information Requirements) |
| Barnet | None shown on the page | Location 1:1250; block plan 1:200 or 1:500 | Tree survey and arboricultural statement where trees stand within 15 m of the development |
| Bexley | Reviewed and updated 17 October 2018 | Location 1:1250 or 1:2500; block plan 1:500 or 1:200 (main section), 1:100 or 1:200 (householder checklist) | Flood risk: household extensions in flood zones 2 and 3 refer to the Environment Agency's standing advice |
| Brent | None shown on the PDF (the linked page says last updated 1 September 2026) | Block plan normally 1:100 or 1:200; location plan scale not stated | Heritage statement for householder applications affecting listed buildings, conservation areas, Article 4 works or locally listed buildings |
| Bromley | Council page says the current list was agreed on 12 December 2024; the householder forms page still links a checklist dated 27 June 2018 | Location 1:1250 or 1:2500; block or site plan 1:100, 1:200 or 1:500 | Flood risk declaration for householder and other minor extensions in flood zone 2 or 3 (Part 2 of the guidance) |
| Camden | PDF last published 20 November 2025, per the council's page | Floor plans, elevations, sections and roof plans at least 1:50 (1:100 outside conservation areas and listed buildings); location and block plan scales not stated | Rear extensions must show boundary walls and neighbours' relative levels (section 1b) |
| City of London | February 2016 on the PDF cover | Floor and roof plans, elevations and sections e.g. 1:50, 1:100 or 1:200; location and site plan scales not stated | Flood risk assessment and sequential test evidence in the Flood Risk Area |
| Croydon | May 2026 | Location usually 1:1250; block plans 1:200 or 1:500 | Flood risk: householder extensions may require a brief statement with a flood map search |
| Enfield | 28 September 2026 | Location typically 1:1250 or 1:2500 (larger sites); block plan 1:100, 1:200 or 1:500 | Hardstanding: a front garden plan at not less than 1:100 showing levels and drainage |
| Greenwich | June 2025 on the cover | Location normally 1:1250; block plan at least 1:200 or 1:500 | Landscaping strategy where a front garden in a conservation area, or a listed building's garden, is altered |
| Hackney | None shown on the checklist | Floor plans, elevations, sections and roof plans 1:50 or 1:100; the checklist lists no location or block plan scale | Local requirements table asks for roof plans and site sections at 1:50 or 1:100 |
| Haringey | August 2024 | Location 1:1250 or 1:2500; site 1:500 or 1:200 | Existing and proposed plans on the same drawing, each with a scale bar and one dimension |
| Harrow | 1 February 2024 | Location 1:1250 or 1:2500; block 1:200 or 1:500 | Local requirements in Appendix 1 are listed as potential requests for further information; roof plans at 1:100 or 1:200 are in the national section |
| Havering | None shown on Checklist 001 | Location 1:1250 or 1:2500; site 1:100, 1:200 or 1:500 | Structural survey by a chartered engineer where a basement is proposed |
| Hillingdon | February 2024 on the cover (file name says June 2020) | Location 1:1250 or 1:2500; block 1:500 | Vehicular parking and access details; basement impact assessment where a basement is proposed |
| Hounslow | None shown (refers to a 2019 consultation) | Location 1:1250 or 1:2500; block 1:500 | Environment Agency flood risk matrix for a basement or ground floor extension in flood zone 2 or 3 |
| Islington | 12 April 2024 (PDF cover) | Location 1:1250 (PDF) | Structural method statement for basement development (section 2.2) |
| Kensington and Chelsea | 10 March 2023 | Location 1:1250 or 1:2500; site plan 1:200 or 1:500 | Online submissions must print at A3 or smaller; larger drawings go by post |
| Kingston upon Thames | February 2024 in the footer (file uploaded in 2025) | Location 1:1250 or 1:2500; block 1:500; site plans 1:200 or 1:500 | Basement impact assessment signed by a chartered civil or structural engineer (section 2) |
| Lambeth | 2024 (issued December 2024) | Location 1:1250 or 1:2500; site layout 1:100, 1:200 or 1:500 | Basement impact assessment where floorspace is added below ground (item 14) |
| Lewisham | July 2022 | Location 1:1250 or 1:2500; block 1:500 | Desk-based archaeological assessment for new or extended basements in Archaeological Priority Areas |
| Merton | December 2024, updated June 2026 | Location 1:1250 or 1:2500; block 1:100 (requirement 5) | Planning Fire Safety Strategy or Reasonable Exception Statement for householder and non-major schemes (requirement 22) |
| Newham | December 2024 | Location 1:1250 or 1:2500; site 1:100, 1:200 or 1:500 | Heritage, character and place-making asset statement in or next to a conservation area |
| Redbridge | August 2026 | Location 1:1250 or 1:2500; block 1:200 or 1:500 | Basement impact assessment or construction method statement for basements (Local Plan LP31) |
| Richmond upon Thames | In effect from 20 February 2026 | Location 1:1250 or 1:2500; block 1:100, 1:200 or 1:500 | Flood zone 2 or 3 declaration form for householder extensions (item 34) |
| Southwark | Page last updated 30 September 2026 | Location 1:1250 or 1:2500; site plan 1:100 or 1:50 unless another scale is required | Basement impact assessment for new or altered basements |
| Sutton | Adopted 24 August 2026 | Location 1:1250; block 1:500 (householder table) | Window sections for replacement windows in a conservation area or on a listed or locally listed building |
| Tower Hamlets | September 2020 | Location 1:1250 or 1:2500; site plan to a stated metric scale | Heritage impact statement where works affect a listed building, a conservation area or its setting |
| Waltham Forest | '2025' on the cover (page last updated 1 October 2026) | Location 1:1250 or 1:2500; block 1:200 or 1:500 | Basement impact assessment for any basement construction, extension or deepening |
| Wandsworth | July 2026 | Location 1:1250 or 1:2500; site plan 'as appropriate' from 1:100, 1:200 or 1:500 | Fire safety strategy, with exemption statements accepted for smaller schemes (Local Plan LP27) |
| Westminster | Page last updated 5 August 2026 | Location 1:1250 or 1:2500; other scales not stated | Sustainable design statement where works create new floorspace |
Sources: each borough's own planning pages and documents, linked in the first column, read 15 October 2026. Dates are those the documents state for themselves. Scales are as the document states them, and a council may accept other scales if agreed. One requirement per borough is shown as an example: the list itself is longer and may change, so read the current version before you submit.
Several councils' own documents give different answers on the same point, so read the version the council links from its current application page and ask the council which applies.
| Council | What differs | Documents compared |
|---|---|---|
| Bexley | Block plan scale is 1:500 or 1:200 in the block plan section and 1:100 or 1:200 in the householder checklist | Requirements PDF, two sections |
| Bromley | The council page says the current list was agreed on 12 December 2024, but the householder forms page still links a checklist PDF dated 27 June 2018 | Validation page and householder checklist |
| Barking and Dagenham | The checklist says last updated 27 July 2026, but its policy references are the 2016 London Plan, the 2019 draft London Plan and a 2011 DPD | Checklist PDF |
| City of London | The PDF is dated February 2016, while the listing page says updated 9 June 2025 | Checklist PDF and listing page |
| Greenwich | Block plan scale is 1:200 or 1:500 in the national section and 1:100 or 1:200 in the listed building consent row | Local Validation Requirements List 2025 |
| Hackney | The householder checklist PDF is footed October 2009, and the current checklist document is undated and differs on the file size limit and the location plan scale | Householder PDF and current checklist |
| Hillingdon | The cover says February 2024, while the file name says June 2020 | Checklist PDF cover and file name |
| Islington | The web page gives the location plan as 1:1250 or 1:2500, while the April 2024 PDF gives 1:1250 | Requirements page and PDF |
| Kensington and Chelsea | Site plan is 1:200 or 1:500 in the Section One table, and 1:200 for householder or 1:500 for other applications in Section Three | Submission requirements PDF, two sections |
| Kingston upon Thames | The householder file was uploaded in 2025 but its footer reads February 2024, and a separate checklist is dated February 2024 with May 2024 amendments | Householder local list and Section 3 checklist |
| Lewisham | The July 2022 householder PDF is still the linked checklist, and a draft dated September 2026 sits on the consultation page, which closed on 29 September 2026. We found no notice of adoption | Householder PDF and consultation page |
| Merton | Block plan is 1:100 in requirement 5 and 1:200 or 1:500 in the permission in principle section of the same checklist | Validation checklist 2025 (updated June 2026) |
| Newham | Roof plans are 1:50 or 1:100 in the 2018 householder SPD appendix and 1:100 in the December 2024 document | SPD appendix and requirements document |
| Sutton | The householder table gives location 1:1250 and block 1:500, while the guide section gives 1:1250 or 1:2500 and 1:200 or 1:500 | Local Validation List 2026, two sections |
| Waltham Forest | Headings give elevations and floor plans at 1:50, 1:100 or 1:200, while the text says 1:50 or 1:100, usually for elevations | Householder checklist |
| Westminster | The householder page was updated on 5 August 2026, and the checklists page links a July 2026 local list, while a combined lists PDF of a consultation draft dated August 2021 is still online | Householder page and PDF |
Source: the council pages and documents linked in the borough table, read 15 October 2026. We report the differences and do not choose between them.
Of the 31 boroughs in the table, eleven print a date on the checklist that is more than two years before 15 October 2026: Bexley (2018), Bromley (a householder checklist dated 27 June 2018), the City of London (2016), Haringey (August 2024), Harrow (February 2024), Hillingdon (February 2024), Islington (April 2024), Kensington and Chelsea (March 2023), Kingston upon Thames (February 2024), Lewisham (July 2022) and Tower Hamlets (September 2020). Five show no date on the checklist itself: Barnet, Brent, Hackney, Havering and Hounslow.
Article 34(6)(d) asks for publication or republication within the two years before the application date, and a council can republish a list without changing the date printed on it, so a document dated more than two years ago is not proof that a requirement is invalid. It is a reason to check the council's current page and to raise a validation dispute under article 12 if a requirement looks unreasonable.
Householder approval rates ran from 68.0% to 98.6% across London boroughs in 2025-26, and each borough decides its own mix of applications.
| Borough | Householder approval rate | Householder decisions |
|---|---|---|
| Hammersmith and Fulham | 98.6% | 560 |
| Bexley | 95.3% | 939 |
| Kensington and Chelsea | 94.3% | 574 |
| London (32 boroughs and the City) | 85.6% | 24,758 |
| Bromley | 79.0% | 1,538 |
| Greenwich | 77.6% | 647 |
| Barking and Dagenham | 68.0% | 406 |
MHCLG district planning application statistics (PS1/PS2), financial year 2025-26 (2025 Q2 to 2026 Q1), (other) householder developments of every kind; England 90.3% across 310 local planning authorities. All 32 boroughs with a published rate are on our house extension plans page. A later MHCLG release (24 September 2026) exists and was not re-pulled.
Many London projects do not, because permitted development rights let you build without applying when the property is a house and the work stays inside the limits. You need an application where:
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too β for free.
The sequence is built around validation: the fastest route to a decision is a pack the council can accept when it arrives.
We look up conservation area, Article 4 and listed status for your address, and say whether an application is needed at all or whether permitted development with an optional certificate is the route.
We measure the building as it stands. Permitted development allowances run from the original house, so previous extensions have to be on the existing plans.
We draw the sheets in the table above at the scales your council's current list asks for, with materials annotated and the neighbouring relationship shown.
We submit through the Planning Portal, deal with validation queries and the case officer, and revise the drawings free until the council decides.
The price panel on this page shows the starting price for householder planning application drawings, what it covers and that it is the total you pay, survey included. Council planning fees are separate and paid to the council, and the pricing page lists the other drawing types.
Planning permission and party wall notices are separate statutory regimes, and having one grants nothing under the other. The council decides planning under the Town and Country Planning Act. Party wall matters are between you and your neighbour under the Party Wall etc. Act 1996, with no council involvement. If your extension builds a wall on the boundary, cuts into a shared wall, or excavates within 3 metres of a neighbouring building deeper than its foundations, or within 6 metres where the excavation meets the 45 degree plane drawn from them, notices may be needed whether or not you need planning permission. The section 6 excavation notice is part of that Act. Our party wall surveying page covers that side.
A plan that identifies the land, normally a location plan at 1:1250 or 1:2500 with the site edged red, plus the other plans and drawings necessary to describe the development (article 7 of the 2015 procedure order). For a householder application that normally means a block plan and existing and proposed floor plans and elevations, with roof plans and sections where they apply. Your council's list may add more.
Location plans are typically 1:1250 or 1:2500 and block or site plans 1:200 or 1:500, with the detailed sheets at 1:50 or 1:100. Councils state their own scales, and the borough table on this page shows that they differ, so check your council's list before drawing.
The council has eight weeks from receipt of a valid application to decide a non-major application, unless you agree a longer period in writing (article 34(2) of the 2015 procedure order). An application that is missing something the council's list properly requires is not valid, so the period does not start until it is. A certificate of lawful development also has an eight-week period.
It is a list a council publishes of what it requires with an application: the national items plus any local requirements. Under article 34(6) the council can rely on a local item only if it was published on its website before you applied, within the previous two years, and the item is reasonable and relates to a material consideration. The borough table on this page links each council's checklist.
Article 12 of the 2015 procedure order lets you send the council a notice naming the item, giving your reasons and asking it to waive the requirement, if you think it fails the article 34(6)(c) tests. The council must then tell you whether it still requires the item. Take advice before relying on this route, because a decision to invalidate is the council's.
There is no legal requirement to use a professional. In practice the drawings must meet the council's list and the Planning Portal's quality standards, with a stated metric scale, and be consistent between plan, elevation and section. The usual risk is the baseline: permitted development allowances run from the original house, so a wrong measurement can change which route applies.
Planning drawings show size, appearance and position, so the council can judge whether the development is acceptable. Building regulations drawings show how it is built: structure, insulation, ventilation, fire safety and drainage. They are separate consents decided by separate bodies, and most projects need both. See our building regulations drawings page for the construction set.
Not necessarily. On a house, a single storey rear extension within 3 m (4 m detached) and 4 m high can be permitted development, and up to 6 m (8 m detached) it goes through prior approval. Flats have no such rights, and conservation areas and Article 4 directions remove or limit them. Our house extension plans page sets out each route.
It is the council's written confirmation under section 192 of the 1990 Act that a proposed use or development would be lawful, which for a house usually means that it is permitted development. It is optional and is decided on the legal tests, not design merit. The council has eight weeks from a valid application to decide it.
The price panel on this page shows the starting price for householder planning application drawings, what it covers and that it is the total you pay, survey included, with free revisions until the council decides. The council's planning fee is separate and is paid to the council. Larger or more complex schemes are priced individually.
Local drawings tuned to each council's design guidance, with live borough approval rates. Pick your area:

Planning application drawings in Ealing β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Ealing β
Planning application drawings in Wandsworth β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Wandsworth β
Planning application drawings in Bromley β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Bromley β
Planning application drawings in Barnet β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Barnet β
Planning application drawings in Harrow β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Harrow β
Planning application drawings in Sutton β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Sutton β
Planning application drawings in Richmond upon Thames β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Richmond upon Thames β
Planning application drawings in Kingston upon Thames β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Kingston upon Thames β
Planning application drawings in Camden β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Camden β
Planning application drawings in Islington β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Islington β
Planning application drawings in Haringey β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Haringey β
Planning application drawings in Enfield β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Enfield β
Planning application drawings in Waltham Forest β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Waltham Forest β
Planning application drawings in Hillingdon β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Hillingdon β
Planning application drawings in Hounslow β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Hounslow β
Planning application drawings in Brent β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Brent β
Planning application drawings in Hammersmith and Fulham β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Hammersmith and Fulham β
Planning application drawings in Kensington and Chelsea β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Kensington and Chelsea β
Planning application drawings in Westminster β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Westminster β
Planning application drawings in Merton β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Merton β
Planning application drawings in Lambeth β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Lambeth β
Planning application drawings in Croydon β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Croydon β
Planning application drawings in Hackney β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Hackney β
Planning application drawings in Tower Hamlets β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Tower Hamlets β
Planning application drawings in Newham β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Newham β
Planning application drawings in Redbridge β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Redbridge β
Planning application drawings in Barking and Dagenham β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Barking and Dagenham β
Planning application drawings in Havering β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Havering β
Planning application drawings in Greenwich β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Greenwich β
Planning application drawings in Lewisham β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Lewisham β
Planning application drawings in Bexley β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Bexley β
Planning application drawings in Southwark β location and block plans plus existing and proposed plans and elevations, drawn to pass validation.
View Southwark βAnswer five quick questions and get a free planning score for your exact address β instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.