MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
PricingProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Terraced house in Lewisham with a new loft dormer, a typical project whose insulation and glazing must satisfy Part L
Energy compliance for new homes, conversions and extensions

SAP calculations for Part L in London

Building control asks for a SAP calculation to prove that your new home, conversion or large extension meets Part L. A partner energy assessor produces it, and we coordinate it with your drawings and specification.

Fixed fees, published on our pricing pageAll 33 London boroughs

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day

Photo: Bill Boaden, BY-SA 2.0

Share
Fee

From £245

SAP calculations (Part L)

Fixed in writing after a free assessment of your property. Council planning fees are separate.

What's included

  • Assessment by a partner energy assessor
  • Drawings and specification coordinated

Every price is the total you pay. Checked 24 October 2026.

Why the energy model has to be done early

SAP stands for the Standard Assessment Procedure, the government's method for rating the energy performance of a dwelling. For a new home, a flat conversion or a change of use to a dwelling, the building control surveyor needs a calculation that shows the design meets the current Part L limits. It also underpins the Energy Performance Certificate issued at the end.

The calculation is only as good as its inputs. It needs the wall, roof and floor build-ups, window and door specifications, the heating system, the ventilation strategy, the air-tightness target and the lighting. If those change after the model is run, the result can fail. So the assessor needs the building regulations drawings and the specification, and the drawings need to carry the assessor's findings back.

That is why we coordinate the two. We send the assessor the drawing set and the insulation schedule, and where the first run shows a shortfall, we agree with you whether to thicken the insulation, change the glazing or alter the heating, before the drawings are issued. Fixing it on paper costs far less than on site.

Extensions to existing houses are usually assessed by simpler routes in Part L. We tell you at the start whether your job needs a full SAP or a simpler check.

Edwardian houses in Sutton with bay windows, typical of homes being converted into flats where Part L evidence is needed

From drawings to compliance

Four steps, with the calculation run on your final specification.

SAP calculation process1InputsDrawings, build-ups, glazing and heating system sentto the assessor2First calculationResult tested against Part L limits3AdjustInsulation, glazing or heating changed if the resultfalls short4SubmitDesign-stage calculation to building control;as-built check later
Guidance source: Approved Document L, volume 1, GOV.UK.

Which jobs need a SAP

Not every building project needs a full SAP, and the table shows the usual cases.

ProjectFull SAP usually needed?Comment
New dwellingYesDesign stage and as-built stage
Conversion of a house into flatsYes, for each new dwellingExisting-building rules apply to retained fabric
Change of use to a homeYesTreated as a new dwelling for energy
Rear or side extensionNot normallyFabric limits shown on the drawings
Loft conversionNot normallyInsulation upgrade specified

Source: Approved Document L. Your building control body has the last word.

The rules and numbers behind this page

Each figure links to the government source it comes from.

  1. Approved Document L volume 1 (dwellings), 2021 edition with 2023 amendments, is the guidance on conservation of fuel and power for homes.

    Source: GOV.UK, Conservation of fuel and power: Approved Document L
  2. The Part L amendments and Approved Documents L volumes 1 and 2 came into force on 15 June 2022.

    Source: GOV.UK, Conservation of fuel and power: Approved Document L
  3. The 2022 changes did not apply where a building notice, initial notice or full plans were submitted before 15 June 2022 and work started before 15 June 2023.

    Source: GOV.UK, Conservation of fuel and power: Approved Document L
  4. A building control body must decide a full plans application within 5 weeks, or a longer period agreed in writing.

    Source: legislation.gov.uk, Building Regulations 2010, regulation 14A(6)
  5. Approval of building regulations plans lapses if work has not started within 3 years of the application.

    Source: legislation.gov.uk, Building Act 1984, section 32
  6. A council can require non-compliant building work to be altered or removed for up to 10 years after completion.

    Source: legislation.gov.uk, Building Act 1984, section 36(4)

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Frequently asked questions

Do you carry out the SAP yourselves?

A partner energy assessor produces the calculation. We coordinate: we send the assessor your drawings and specification, read the result against the design, and agree any changes with you. You have one point of contact.

What is the difference between SAP and an EPC?

A SAP calculation is the model used for compliance and design. An Energy Performance Certificate is the rating certificate produced for the finished building, and for a new dwelling it is derived from the as-built SAP. Each home needs an EPC when it is sold or let.

Does my extension need a SAP?

Usually not. A house extension normally meets Part L by fabric limits and glazing proportions shown on the building regulations drawings. If your extension is large or is a new dwelling, tell us and we say.

What if the result fails?

It is a design problem, not a dead end. The assessor shows where the shortfall is, and the usual fixes are better insulation, higher-performing windows or a different heating source. We update the drawings so the site matches the calculation.

Is there a second calculation at the end?

For a new dwelling, yes: an as-built assessment confirms that what was built matches the design, and it produces the EPC. Tell the assessor early of any changes made on site.

What does the price cover?

The £245 is the starting figure for the design-stage calculation and coordination of one dwelling. Several units, or complex schemes, are quoted after we see the drawings.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.