MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Building regulations drawings for a Manor project — technical construction details on site
Manor · Building Control & Construction Drawings

Building regulations drawings in Manor

Full-plans building regulations drawings for Manor — the technical construction set covering structure, fire safety, insulation and Part L, drawn to satisfy building control so your builder can price and build with certainty, delivered in days and revised free until sign-off, with a free project check first.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Manor householder planning by the numbers

Adur District Council granted 96% of the householder planning decisions it made in its latest published year — 9 points above the 87% England-wide householder average. Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.

Under Class B, a rear dormer stays permitted development up to 40m³ of added roof volume on a terrace or 50m³ on a semi-detached or detached house, while Class A allows a single-storey rear extension of 3m beyond the original rear wall on a terrace and 4m on a detached house before a full application is needed. Manor carries at least one Article 4 direction, and conservation areas including North Lancing remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Manor is determined against an 8-week statutory target.

North Lancing (conservation area designated in 1975), Coombes (civil parish within Manor) and Lancing (civil parish within Manor) — these are the Manor pockets our drawings cover most. Heritage designations here include North Lancing. Adur District Council weighs each proposal against the adopted Adur local plan and Adur District Council's design guidance for householder work, where the 1,770 homes here are 41% 1930-1939, 21% 1955-1964, 14% 1945-1954, which is what sets the realistic roof and rear-projection options. On roofs the borough is hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building, over 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%).

What actually constrains a project in Manor

Manor's designated heritage is specific, and it is the first thing we check against your address: North Lancing (conservation area designated in 1975). Inside those boundaries permitted development is curtailed and Adur District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Manor takes in Coombes and Lancing. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor.

On stock, Manor is 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%) — which is why hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building govern what a loft or rear projection can realistically be. Adur District Council decided 210 householder applications in the latest published year and granted 96%, with 60% issued inside the eight-week target. Those are the numbers our drawings are prepared against.

The full build-period split for Manor runs pre-1900 3% (60 homes), 1900-1918 1% (10 homes), 1919-1929 3% (50 homes), 1930-1939 41% (730 homes), 1945-1954 14% (240 homes), 1955-1964 21% (380 homes), 1965-1972 6% (110 homes), 1973-1982 3% (60 homes), 1983-1992 2% (40 homes) and 2000-2008 2% (30 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Adur District Council also decides for St Mary's and Southwick Green, so a decision in Manor sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

The Article 4 directions recorded for this council include 1 Southdown Road, Southwick, Church Street, Shoreham-by-Sea, Kingston Buci Conservation Area and Land adjoining Steyning Road, Shoreham-by-Sea. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.

Manor in numbers — housing stock and planning decisions

Published figures for Manor and Adur District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureManor
Dwellings recorded1,770
Built pre-190060 (3%)
Built 1900-191810 (1%)
Built 1919-192950 (3%)
Built 1930-1939730 (41%)
Built 1945-1954240 (14%)
Built 1955-1964380 (21%)
Built 1965-1972110 (6%)
Built 1973-198260 (3%)
Built 1983-199240 (2%)
Built 2000-200830 (2%)
Built before 19194%
Built 1919–193944%
Built 1945–200849%
Conservation areas in Manor1 (North Lancing)
Conservation areas district-wide7
Article 4 directions recorded9
Householder applications decided210
Householder applications granted96%
Decided within 8 weeks60%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Adur District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What building regulations drawings cover in Manor

Planning permission decides whether you can build; the Building Regulations decide that what you build is safe, warm and sound. They are two separate approvals, run by different bodies, and a Manor project usually needs both. The building regulations set is the technical layer beneath the planning drawings — construction sections, structural details, insulation build-ups and fire-safety provisions that a builder works from and a building control surveyor checks against the approved documents.

In practice that means Part A structure — beam and foundation details with the structural calculations behind them; Part B fire — escape, protected routes and, in a loft, a fire door and mains-linked alarms; Part L conservation of fuel and power — U-values, insulation and airtightness; plus drainage, ventilation and stairs. On Manor's stock, which runs to 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%), the recurring challenge is meeting Part L in solid-walled period houses without ruining the room, and we detail the insulation to hit the numbers with the least intrusion.

Building control applies everywhere in Manor regardless of planning designation, but in conservation areas such as North Lancing the two processes interact — insulation and window details often have to satisfy Part L and a planning condition at once. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor. We draw the construction details to reconcile both.

Technical building regulations drawing set for a Manor project

What do building regulations drawings need to show in Manor?

A full-plans set for Manor building control is checked against the Approved Documents. A typical extension or loft set covers each of these:

  • Part A structure — foundation, beam and floor details with the structural calculations behind them, sized for the spans found in Manor's 1930s semi-detached and detached houses (41% of 1,770 homes)
  • Part B fire safety — escape windows, protected stairs and, in a loft, fire doors and mains-linked smoke alarms
  • Part L conservation of fuel and power — U-values, insulation build-ups and airtightness for every new thermal element, the hardest test to meet cleanly on Manor's older stock
  • Drainage, ventilation and Part K stairs, with construction sections showing how each junction is built
  • The build-up of walls, floors and roof, so a Adur District Council or approved-inspector surveyor can check the work against the approved drawings on site

Manor planning decisions — live from council data

Building control is a separate approval, but most Manor projects clear planning first, so Adur District Council's live decision record below sets the context. Adur District Council granted 96% of its householder applications in the year to 31 March 2026, and North Lancing shapes what is approved here. We handle both stages, so the construction drawings follow through seamlessly once permission is granted.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

96%householder applications approved in Adur
87%national average — Adur is 9 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Full plans or a building notice in Manor?

There are two ways to get building control approval, and for anything structural in Manor we recommend the full-plans route — particularly on the borough's 1930s semi-detached and detached houses (41% of 1,770 homes) and late-1950s and early-1960s houses (21%), where opening up an old structure tends to reveal surprises. A building notice lets work start with no approved drawings — cheaper up front, but the surveyor rules on compliance as the build proceeds, so a wrong detail is discovered mid-work and rebuilt at your cost. Full plans get the whole set checked and approved before a brick moves, which is what banks, warranty providers and future buyers want to see.

Full plans also protect the project commercially. With approved construction drawings your builder prices exact quantities rather than guessing, and there is a completion certificate at the end — the document a solicitor asks for when you sell across North Lancing, Coombes and Lancing and the rest of Manor. Where a project sits in a controlled setting — Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal — the construction details also have to respect what planning has conditioned, and we draw the full set and manage the building control submission to reconcile both.

Structural construction detailing for a Manor building regulations set

Building control work across Manor

Every structural project needs building regulations drawings whatever the planning position. A few of the Manor neighbourhoods and property types where we prepare them most often:

North Lancing

Building regulations drawings for North Lancing's conservation area designated in 1975 — structure, fire and Part L detailed for building control sign-off.

Coombes

Building regulations drawings for Coombes's civil parish within Manor — structure, fire and Part L detailed for building control sign-off.

Lancing

Building regulations drawings for Lancing's civil parish within Manor — structure, fire and Part L detailed for building control sign-off.

Planning permission or building regulations — which does my Manor project need?

They are different approvals and most projects need both. This is how they split in Manor.

Planning permissionBuilding regulations
Question it answersShould this be built here?Is it built safely and efficiently?
Decided byAdur District Council planningBuilding control body or approved inspector
Main drawingsLocation, block, proposed plans & elevationsStructural, fire, thermal & construction details
Needed for permitted development?No — a certificate is optionalYes — always, before work starts

In conservation areas such as North Lancing, a planning condition can dictate materials that the building regulations details must then also satisfy.

Four steps to building control sign-off in Manor

A fixed process built around how Manor projects are approved and inspected — most construction sets are ready within seven days of survey.

  1. 1

    Free project check

    Send us your Manor postcode and scheme. We confirm whether you also need planning, which parts of the regulations apply, and whether Adur District Council building control or an approved inspector suits the job.

  2. 2

    Measured survey

    We measure the existing structure so the construction details, spans and junctions are drawn to the real building rather than an assumption — the base sound structural calculations depend on.

  3. 3

    Construction drawings & calculations

    Chartered designers and engineers produce the full-plans set — structure, fire, Part L thermal, drainage and details — with the structural calculations that support every beam and foundation.

  4. 4

    Submission & inspections

    We submit the full-plans application to your building control body, resolve any queries before work starts, and revise the drawings free until the set is approved and the work signed off.

Frequently asked questions

What is the difference between planning permission and building regulations in Manor?

They are two separate approvals. Planning permission, decided by Adur District Council, answers whether a scheme should be built at all — its size, look and impact on neighbours. Building regulations, checked by a building control body, answer whether it is built safely and efficiently — structure, fire, insulation and drainage. A Manor project usually needs both, and even permitted-development work that skips planning still needs building control sign-off.

Do I need building regulations drawings if I have planning permission in Manor?

Yes — planning permission is not building control approval. The planning drawings show what the building looks like; building regulations drawings show how it is constructed, and no structural work in Manor can lawfully complete without a building control sign-off. The two sets are drawn together but approved by different bodies, so having one never removes the need for the other. Adur District Council is the decision-maker.

Should I use full plans or a building notice in Manor?

For anything structural in Manor — a loft, an extension or removing a wall — we recommend full plans. The whole construction set is checked and approved before work starts, so a non-compliant detail is caught on paper rather than rebuilt on site. On the borough's 1930s semi-detached and detached houses (41% of 1,770 homes) that certainty matters, and a building notice — which lets a surveyor judge compliance as work proceeds — risks costly rework. Banks and warranty providers also prefer the approved full-plans set that Adur District Council or an approved inspector signs off.

Can I use a private building control surveyor instead of Adur District Council?

Yes. You can use Adur District Council's building control team or an independent approved inspector — both enforce the same regulations, so it comes down to price, availability and continuity. We draw the full-plans set to the same standard either way and submit it to whichever body you choose, then manage the queries and inspections through to the completion certificate. This applies to your Manor address specifically.

How do you meet Part L insulation rules on older Manor houses?

Solid-walled period houses — common across Manor, including conservation areas such as North Lancing — are the hardest to bring up to Part L without losing room or altering the fabric. We detail the insulation to hit the required U-values with the least intrusion, using internal or roof-level build-ups and, where a planning condition protects the exterior, methods that satisfy both the energy standard and the heritage requirement at once. Adur District Council is the decision-maker.

How much do building regulations drawings in Manor cost?

We price each Manor job individually, because the structural content and the size of the construction set vary from a single beam to a whole-house refurbishment, and send a fixed, no-obligation quote within one working day. It covers the full-plans drawings and structural calculations with free revisions until sign-off. The building control body's own fee is separate. Call 020 7864 7245 to start. Adur District Council is the decision-maker.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Building regulations drawings across Adur

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Manor