MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
PricingProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Terraced house in Lewisham with a loft dormer already built, an example of one design option tested in a feasibility study
Before you commit to drawings · desktop massing options

Feasibility studies and design options for London homes

You have a house, a budget and three ideas. We test them on paper against the planning rules, show the volumes side by side, and tell you which are likely to work before you pay for a survey or a full set of drawings.

Fixed fees, published on our pricing pageAll 33 London boroughs

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day

Photo: Bill Boaden, BY-SA 2.0

Share
Fee

From £515

Feasibility and design options

Fixed in writing after a free assessment of your property. Council planning fees are separate.

What's included

  • Desktop massing options
  • Planning policy notes
  • Survey added only if you go ahead

Every price is the total you pay. Checked 24 October 2026.

Why test the ideas before you draw them

Most homeowners arrive with a favourite idea and a hunch about the cost. The hunch is often right about cost and wrong about what the council will allow. A full drawing set is a poor way to find out, because by then the money is spent.

A feasibility study works the other way. We take the plot from public mapping and the planning history, build simple three-dimensional massing models of your options, and set each against the permitted development limits and the council's policies. You see the volumes beside each other, with a note of the likely route for each.

Typical London comparisons are a rear dormer against a hip-to-gable, a side-return infill against a wraparound, or a rear extension kept inside permitted development against a deeper one that needs permission. The result is a clear ranking by planning risk, with the pros and cons of each in plain words.

If none of your options is likely to work, the study says so and suggests what might. That is a cheap outcome compared with an application that fails.

Edwardian semi-detached houses in Sutton with gables and bays, whose large roofs often suit several loft and extension options

How a feasibility study runs

A desktop study, so there is no site visit in the price.

Feasibility study process1BriefYour ideas, budget and what the house must do2Desk researchPlanning history, designations and the council'spolicies3Massing optionsSimple 3D volumes tested against the rules4ReportOptions ranked by planning route and risk5DecisionChoose one, then survey and draw
Rules tested: Schedule 2, Part 1 of the GPDO 2015 and local policy.

Common options compared

The same house can be extended several ways, and the planning route differs for each.

OptionLikely routeMain risk
Rear dormer in the roofPermitted development, with a certificateVolume limit and distance from eaves
Deeper rear extension, 4 m to 6 mPrior approval for attached housesNeighbour objection
Two-storey rear extensionPlanning permissionEffect on neighbours' light
Side infill on a terracePlanning permission in most boroughsRear-wing character
Garden room at the backPermitted development if within limitsUsed as a bedroom

Sources: GPDO 2015, Schedule 2, Part 1. Local policy varies by borough.

The rules and numbers behind this page

Each figure links to the law or government source it comes from.

  1. A single-storey rear extension is limited under Class A to 3 metres on an attached house and 4 metres on a detached house, and 4 metres in height.

    Source: legislation.gov.uk, GPDO 2015, Schedule 2, Part 1, Class A.1(f)
  2. A roof extension under Class B may add up to 40 cubic metres to a terraced house and 50 cubic metres to other houses.

    Source: legislation.gov.uk, GPDO 2015, Schedule 2, Part 1, Class B
  3. A council has 8 weeks to decide most applications from the day after a valid application is received, unless a longer period is agreed in writing.

    Source: legislation.gov.uk, Development Management Procedure Order 2015, article 34
  4. The fee for a lawful development certificate for proposed work is 50% of the fee for a planning application for the same work.

    Source: GOV.UK, Fees for planning applications, paragraph 024
  5. Planning fees rise every 1 April in line with the Consumer Prices Index of the previous September, capped at 10%.

    Source: GOV.UK, Fees for planning applications
  6. London councils decided 24,758 householder applications in the year to March 2026.

    Source: GOV.UK, Planning applications statistics (PS2)

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Frequently asked questions

How many options will I see?

Normally three, chosen with you from your ideas and from what the rules suggest. More can be added by agreement. Each option has a massing image and a short note on the likely planning route.

Is the study based on a survey?

No. It uses public mapping, the planning register and your own measurements or old plans. That is why it is quick and affordable. If you go ahead, we add a measured survey, and any difference found would be flagged.

Can the fee be set against drawings?

Yes, as a rule for the same property. Tell us when you instruct us, and we confirm the credit in writing before you pay for the next stage.

Do you give a build cost?

No. Cost depends on contractors, finishes and the state of the house. We can show the floor area gained so that your builder or quantity surveyor can price it, and we can prepare a tender pack once the design is settled.

Does the study tell me whether I will get permission?

It gives a reasoned view of the likely route and risk. It does not promise a result, because every application is decided on its merits by the council.

Will you say if my idea is a bad one?

Yes, politely. If your favourite option looks unlikely to work, the study says why, and what to try instead. Saving you a failed application is part of the value.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.