MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
PricingProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Victorian terraced and semi-detached houses on a Woolwich street, where loft conversions need an escape route plan
Escape routes · detection · fire doors · Approved Document B

Fire strategy plans for London homes

Building control, an HMO licence officer or a lender asks how people get out if a fire starts. We draw the escape routes, detection and fire doors on your plans, to the standard of Approved Document B.

Fixed fees, published on our pricing pageAll 33 London boroughs

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day

Photo: Kleon3, BY-SA 4.0

Share
Fee

From £465

Fire strategy plans, complex buildings are referred to a fire engineer

Fixed in writing after a free assessment of your property. Council planning fees are separate.

What's included

  • Escape routes, detection and fire doors shown to Approved Document B

Every price is the total you pay. Checked 24 October 2026.

Where fire drawings catch London owners out

A loft conversion turns a two-storey house into a three-storey one, and the rules change with it. The new room is an extra storey above a first floor, so the stair becomes the only escape route for the people sleeping at the top. Fire-resisting doors, a protected stair enclosure and detection linked through the house follow, and each must appear on the drawings.

HMOs, flat conversions and houses converted into several units are the other common cases. A licence officer or building control surveyor expects to see where the detection sits, which doors are fire doors, where the escape routes run and how far a person must travel to reach a safe place.

A strategy plan is a drawing, not a calculation. It overlays your floor plans with symbols and notes, so a surveyor can check the layout in minutes instead of writing a query. Most delays in building regulations approval at this stage come from a missing door or an escape window the surveyor cannot find on the drawing.

Where the building is large, has several flats sharing a stair, or needs a performance-based solution, a fire engineer is the right person, and we refer you rather than guess.

Terraced house in Lewisham with a loft dormer, where a new top floor needs a protected escape route down the stairs

What the plan shows

One marked-up set of plans, readable by a building control surveyor at a glance.

Fire strategy plan contentsEscape routesFrom every habitable room to a place of safetyFire doorsWhich doors need a fire rating and which self-closeDetection and alarmsPositions of smoke and heat alarms, linked whereneededEscape windowsWhere a window is the secondary escape routeNotesReferences to Approved Document B and the surveyor'schecks
Guidance source: Approved Document B volume 1, GOV.UK.

Common London cases and what the drawings must show

The fire items change with the building type, and the table shows what we mark in each case.

BuildingTypical fire itemsWho asks
Loft conversion, 3 storeysProtected stair, fire doors, linked alarms, escape windowBuilding control
Licensed HMODetection in every room, fire doors, escape routesCouncil housing team
House split into flatsCompartmentation, shared stair, alarmsBuilding control and lender
Basement conversionEscape route, window or door to outsideBuilding control

Source: Approved Document B. Your surveyor makes the final decision on a given building.

The rules and numbers behind this page

Each figure links to the government source it comes from.

  1. Approved Document B volume 1 (dwellings) is the government guidance on fire safety for houses, published as a 200-page PDF.

    Source: GOV.UK, Fire safety: Approved Document B
  2. The Approved Document B page records an update dated 16 September 2026 introducing guidance on second stairs and evacuation lifts in taller residential buildings.

    Source: GOV.UK, Fire safety: Approved Document B
  3. A building control body must decide a full plans application within 5 weeks, or a longer period agreed in writing.

    Source: legislation.gov.uk, Building Regulations 2010, regulation 14A(6)
  4. An HMO needs a mandatory licence when occupied by 5 or more people in 2 or more households.

    Source: legislation.gov.uk, Licensing of HMOs (Prescribed Description) (England) Order 2018, article 4
  5. A council can require non-compliant building work to be altered or removed for up to 10 years after completion.

    Source: legislation.gov.uk, Building Act 1984, section 36(4)
  6. Under Class B, a roof extension may add up to 40 cubic metres to a terraced house and 50 cubic metres to other houses.

    Source: legislation.gov.uk, GPDO 2015, Schedule 2, Part 1, Class B

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Frequently asked questions

Is this the same as a fire risk assessment?

No. A fire risk assessment is a written assessment of an existing building's hazards, often needed for rented properties and shared buildings. Our plan is a drawing for building regulations or licensing. We can tell you which one your situation needs.

Do you act as a fire engineer?

No. We draw to the prescriptive guidance in Approved Document B for ordinary houses. For complex buildings, such as several flats sharing a stair or a design that departs from the guidance, we refer you to a fire engineer and coordinate with them.

Is a fire door the same as an internal door?

No. A fire door is a certified door set, with its frame, seals and closer, which resists fire for a stated time. A flat-pack internal door is not one. Specification on our drawing tells the builder what to buy.

Can you add it to my loft conversion drawings?

Yes. If we are producing your building regulations pack, the fire items are included on the plans. The fire strategy plan is for jobs where you need a standalone set, or where the drawings are by someone else.

What is the price for?

The £465 covers marked-up escape routes, detection and fire doors on your plans. It does not include a site survey. If you do not hold measured plans, a survey can be added.

Will the council accept it?

Building control and licence officers judge each building. A clear, complete drawing is what they expect, and it removes the most common reason for a query. We cannot promise their decision.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.