MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245

Planning permission, explained properly

No jargon, no scare tactics — just what the rules actually say, written by the people who draw plans councils approve every week.

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day
Single-storey rear extension built without planning permission under permitted development rights in London

Rear extension PD

Do I need planning permission for a rear extension? Most single-storey rear extensions don't — PD allows 3m/4m, or 6m/8m with prior approval. Full rules explained.

Read guide →
Loft conversion bedroom with skylights built without planning permission under Class B permitted development

Loft conversion PD

Do I need planning permission for a loft conversion? Most don't — Class B PD allows 40m³ terraced, 50m³ semi/detached. Dormer and conservation-area rules explained.

Read guide →
Illustrated drawing package explaining permitted development rights under GPDO Classes A to E for houses

PD rights explained

Permitted development rights explained: what GPDO Classes A–E let you build without planning permission, and what Article 4 and conservation areas take away.

Read guide →
Aerial view of London boroughs where councils decide how long planning permission takes for householder applications

Planning timescales

How long does planning permission take? Householder applications have an 8-week statutory target from validation. Timeline: consultation, extensions and appeals.

Read guide →
Architect revising drawings after planning permission refused, preparing a resubmission to the council

Refused — what next

Planning permission refused? You can usually resubmit a revised scheme free within 12 months, or appeal within 12 weeks. Here's how to choose the right route.

Read guide →
Architect vs architectural technician comparison — professional preparing planning permission drawings at a drawing board

Architect vs technician

Architect vs architectural technician — what's the difference? ARB architects vs CIAT technologists, who councils accept, and who you need for planning drawings.

Read guide →
Planning consultant vs architect — planning application drawing package and policy documents compared side by side

Consultant vs architect

Planning consultant vs architect — who do you need? Consultants argue policy and appeals; architects produce the drawings. Most home projects need drawings first.

Read guide →
Aerial view of London boroughs whose councils charge the statutory planning permission fee for householder applications

Planning permission cost

How much does planning permission cost? The householder fee is £548 from 1 April 2026. Full schedule of council fees, the CIL trap, and what the fee does not cover.

Read guide →
Single-storey rear extension opening to the garden on a London terrace, the project type this house extension cost guide prices per square metre

House extension cost

How much does a house extension cost in London in 2026? Around £3,000–£3,625/m² for a good single-storey rear extension — national rates plus the London premium.

Read guide →
Velux rooflight loft conversion bedroom compared with dormer and mansard loft options in a London home

Dormer vs mansard vs Velux

Dormer vs mansard vs Velux loft conversion compared — roof shape, permitted development, headroom and space gained, and which type suits your house.

Read guide →
Finished attic bedroom loft conversion built to current UK Building Regulations standards

Building regs for lofts

Building Regulations for loft conversions: the Approved Documents that apply — structure, fire, stairs, insulation, electrics — and how building control works.

Read guide →
Painted stucco terraces in a Notting Hill conservation area where permitted development rights are heavily restricted

Conservation areas & Article 4

Conservation areas and Article 4 directions in London withdraw permitted development rights street by street. What needs consent, which boroughs, and how to comply.

Read guide →
Architect preparing scaled drawings for a lawful development certificate application to a London council

Lawful development certificates

A Lawful Development Certificate proves a project is legal without planning permission. What s.191 and s.192 certificates prove, and the evidence each one needs.

Read guide →
Completed London kitchen extension delivered by a full sequence of renovation trades working from one approved drawing set

Renovation trades

Which trades a London renovation needs, the order they work in, which ones are legally gated, and why the drawings have to be finished before anyone quotes.

Read guide →

Done reading? Get it drawn.

When you're ready to move, we'll turn your project into council-ready drawings — fixed quote back within one working day.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day
Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.