
The fast route to a deep single-storey rear extension in Manor — up to 6 metres on an attached house or 8 on a detached one — via Adur District Council's prior approval scheme rather than a full planning application.
Adur District Council granted 96% of the householder planning decisions it made in its latest published year — 9 points above the 87% England-wide householder average. Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.
Under Class B, a rear dormer stays permitted development up to 40m³ of added roof volume on a terrace or 50m³ on a semi-detached or detached house, while Class A allows a single-storey rear extension of 3m beyond the original rear wall on a terrace and 4m on a detached house before a full application is needed. Manor carries at least one Article 4 direction, and conservation areas including North Lancing remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Manor is determined against an 8-week statutory target.
North Lancing (conservation area designated in 1975), Coombes (civil parish within Manor) and Lancing (civil parish within Manor) — these are the Manor pockets our drawings cover most. Heritage designations here include North Lancing. Adur District Council weighs each proposal against the adopted Adur local plan and Adur District Council's design guidance for householder work, where the 1,770 homes here are 41% 1930-1939, 21% 1955-1964, 14% 1945-1954, which is what sets the realistic roof and rear-projection options. On roofs the borough is hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building, over 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%).
Manor's designated heritage is specific, and it is the first thing we check against your address: North Lancing (conservation area designated in 1975). Inside those boundaries permitted development is curtailed and Adur District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.
Beyond the designated areas, Manor takes in Coombes and Lancing. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor.
On stock, Manor is 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%) — which is why hipped roofs with shallow pitches typical of 1930s building and shallow gabled roofs typical of that period's building govern what a loft or rear projection can realistically be. Adur District Council decided 210 householder applications in the latest published year and granted 96%, with 60% issued inside the eight-week target. Those are the numbers our drawings are prepared against.
The full build-period split for Manor runs pre-1900 3% (60 homes), 1900-1918 1% (10 homes), 1919-1929 3% (50 homes), 1930-1939 41% (730 homes), 1945-1954 14% (240 homes), 1955-1964 21% (380 homes), 1965-1972 6% (110 homes), 1973-1982 3% (60 homes), 1983-1992 2% (40 homes) and 2000-2008 2% (30 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.
Adur District Council also decides for St Mary's and Southwick Green, so a decision in Manor sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.
The Article 4 directions recorded for this council include 1 Southdown Road, Southwick, Church Street, Shoreham-by-Sea, Kingston Buci Conservation Area and Land adjoining Steyning Road, Shoreham-by-Sea. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.
Published figures for Manor and Adur District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.
| Measure | Manor |
|---|---|
| Dwellings recorded | 1,770 |
| Built pre-1900 | 60 (3%) |
| Built 1900-1918 | 10 (1%) |
| Built 1919-1929 | 50 (3%) |
| Built 1930-1939 | 730 (41%) |
| Built 1945-1954 | 240 (14%) |
| Built 1955-1964 | 380 (21%) |
| Built 1965-1972 | 110 (6%) |
| Built 1973-1982 | 60 (3%) |
| Built 1983-1992 | 40 (2%) |
| Built 2000-2008 | 30 (2%) |
| Built before 1919 | 4% |
| Built 1919–1939 | 44% |
| Built 1945–2008 | 49% |
| Conservation areas in Manor | 1 (North Lancing) |
| Conservation areas district-wide | 7 |
| Article 4 directions recorded | 9 |
| Householder applications decided | 210 |
| Householder applications granted | 96% |
| Decided within 8 weeks | 60% |
Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Adur District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.
The ordinary Class A limits stop a single-storey rear extension at 3 metres on an attached house and 4 on a detached one. The larger home extension scheme doubles both, on condition that the council is told first. That notification is not an application for permission — the council cannot refuse on design, materials or policy grounds. It can only consider the effect on the amenity of adjoining premises, and only if a neighbour actually objects during the 21-day consultation.
The other conditions still apply and are strict: single storey only, no higher than 4 metres, eaves no higher than the existing eaves, and no more than half the land around the original house covered. It is not available on designated land, so a house in a conservation area such as North Lancing cannot use it at all. Materials must be similar to the existing house, and the extension must not include a veranda, balcony or raised platform.
Manor is largely 1930s semi-detached and detached houses (41% of 1,770 homes), late-1950s and early-1960s houses (21%) and early postwar houses (14%). Manor contains the North Lancing conservation area (North Lancing designated 1975), so materials, fenestration and roof form are assessed against the appraisal, which matters here because an objecting neighbour puts amenity squarely in front of a case officer. Adur District Council has 9 recorded Article 4 directions, removing permitted development for rear and side extensions and other roof alterations, including rooflights — check the address before assuming PD applies in Manor.

The scheme is available where all of these hold. Fail any one and it is a full application to Adur District Council instead:
We prepare the notification pack Adur District Council needs — plans, elevations, a site plan with the adjoining owners identified — and manage the 21-day neighbour consultation so the 42-day clock is not restarted by an incomplete submission.
Below is Adur District Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Adur District Council granted 96% of its householder applications in the year to 31 March 2026, and North Lancing shapes what is approved here. Prior approval turns on neighbour amenity alone, so the drawings that matter are the ones showing the relationship to the boundary.
Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Across North Lancing, Coombes and Lancing, the notifications that clear without objection are the ones that treat the neighbour as the audience. We show the extension in section against the boundary, demonstrate the 45-degree daylight relationship to the nearest habitable window, and where the plot is tight we taper the depth away from the boundary rather than running the full 6 metres to the fence.
The 1,770 homes here are 41% 1930-1939, 21% 1955-1964, 14% 1945-1954, which is what sets the realistic roof and rear-projection options. Where an objection does arrive, the council's assessment is narrow: loss of light, outlook and overbearing effect on the adjoining property, nothing else. A pack that has already answered those three points on the drawings usually survives an objection, whereas one that leaves them to the officer's imagination usually does not.

We prepare prior-approval notifications across Manor. A few of the areas where deep rear extensions come up most often:
Prior approval drawings for North Lancing — conservation area designated in 1975 — dimensioned to the 6m and 8m limits and prepared for Adur District Council's neighbour consultation.
Prior approval drawings for Coombes — civil parish within Manor — dimensioned to the 6m and 8m limits and prepared for Adur District Council's neighbour consultation.
Prior approval drawings for Lancing — civil parish within Manor — dimensioned to the 6m and 8m limits and prepared for Adur District Council's neighbour consultation.
Same extension, two routes, very different tests.
| Route | Depth allowed | What the council may consider | Timescale |
|---|---|---|---|
| Ordinary Class A permitted development | 3m attached / 4m detached | Nothing — no application needed | Immediate |
| Larger home extension prior approval | 6m attached / 8m detached | Amenity of adjoining premises, only if a neighbour objects | 21-day consultation, 42-day determination |
| Full householder application | No fixed limit | Design, materials, policy, amenity, everything | 8-week target |
| Any of these on designated land | 3m / 4m only | Prior approval scheme unavailable | Full application beyond the limits |
Limits and procedure from the GPDO 2015, Schedule 2, Part 1, Class A and paragraph A.4, made permanent by amendment in 2019.
A process built around the 21-day consultation, which is where these schemes are won or lost.
Send us your Manor postcode and house type. We confirm whether the property is on designated land, whether the scheme is available, and what depth you can realistically take.
We measure the original rear wall, eaves height, boundary distances and the neighbouring windows that the amenity assessment will turn on.
We draw the extension to the 6m or 8m limit with the boundary relationship shown in section, and prepare the written description and adjoining-owner details Adur District Council needs to start the consultation.
We submit, track the 21-day consultation and the 42-day determination, respond to any objection on amenity grounds, and revise free until the decision.
Three metres on a terraced or semi-detached house and four on a detached one under ordinary permitted development. Under the larger home extension prior approval scheme those double to six and eight metres, provided you notify Adur District Council before starting and the conditions on height, materials and land coverage are met. The scheme is not available on designated land. This applies to your Manor address specifically.
It is a notification, not an application for permission. You tell Adur District Council what you intend to build, it writes to the adjoining owners, and they have 21 days to object. If nobody objects, you may build. If someone does, the council assesses the effect on the amenity of adjoining premises and must decide within 42 days. Design and policy are not in scope. This applies to your Manor address specifically.
The council then considers the impact on the amenity of the adjoining property — loss of light, loss of outlook, and overbearing effect — and nothing else. It cannot refuse because it dislikes the design or the materials. We prepare the drawings so those three questions are already answered in section and on the site plan, which is what usually carries an objected scheme through. This applies to your Manor address specifically. Adur District Council is the decision-maker.
No. The larger home extension scheme is unavailable on designated land, which includes conservation areas such as North Lancing, national landscapes, national parks and world heritage sites. On those properties the ordinary 3-metre and 4-metre limits apply, and anything deeper needs a full householder application to Adur District Council. This applies to your Manor address specifically.
Twenty-one days for the neighbour consultation, and a maximum of 42 days from a valid submission for the council to determine it. If the council does not respond within 42 days you may proceed as notified. That deadline is the scheme's real advantage over a full application, and it is why validation completeness matters so much. This applies to your Manor address specifically. Adur District Council is the decision-maker.
Yes — always. Prior approval deals only with the planning position. A 6-metre rear extension still needs building control approval for foundations, structure, drainage, thermal performance and fire safety, and the beam over the opening into the existing house needs designing and calculating. We prepare both sets so the notified scheme is the buildable one. This applies to your Manor address specifically. Adur District Council is the decision-maker.
We quote each Manor scheme individually, because plot shape and the boundary relationship drive the work, and send a fixed, no-obligation quote within one working day. It covers the notification pack and free revisions until Adur District Council determines it. Call 020 7864 7245 to start.
Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.
Same fixed quotes, same fast drawings — wherever your project is.