MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Orangery and conservatory plans in Fort Pitt — a glazed garden room added to the rear of a house
Fort Pitt · Orangery & Conservatory Drawings

Orangery and conservatory plans in Fort Pitt

Orangery and conservatory drawings for Fort Pitt homes — checked against the Class A rear limits and the 30m² building-regulations exemption, drawn to Medway Council's guidance and revised free until your decision.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Fort Pitt planning decisions and design rules

Medway Council granted 96% of the householder planning decisions it made in its latest published year — 9 points above the 87% England-wide householder average. Fort Pitt contains Maidstone Road, Chatham, New Road, Chatham, New Road, Rochester conservation areas (Maidstone Road, Chatham designated 2005), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901), Edwardian (1901–1910) and interwar (1918–1939) housing stock sets the design brief on most streets.

Before permission is required, Class B allows 40m³ of added loft volume on a terrace and 50m³ on a semi or detached house, and Class A allows a 3m single-storey rear extension on a terrace or 4m on a detached house. Fort Pitt carries at least one Article 4 direction, and conservation areas including Maidstone Road, Chatham, New Road, Chatham and New Road, Rochester remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Fort Pitt is determined against an 8-week statutory target.

Maidstone Road, Chatham (conservation area designated in 2005), New Road, Chatham (conservation area designated in 1972), New Road, Rochester (conservation area designated in 1995) and Star Hill to Sun Pier (conservation area designated in 1994) — these are the Fort Pitt pockets our drawings cover most. Heritage designations here include Maidstone Road, Chatham, New Road, Chatham, New Road, Rochester and Star Hill to Sun Pier. Medway Council weighs each proposal against Medway Council's development plan and the design policies it applies to householder applications, where the 5,140 homes here are 28% 1930-1939, 21% pre-1900, 9% 1900-1918, which is what sets the realistic roof and rear-projection options. On roofs the borough is hipped roofs with shallow pitches typical of 1930s building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building, over 1930s semi-detached and detached houses (28% of 5,140 homes), Victorian and earlier houses (21%) and Edwardian houses (9%).

Why a Fort Pitt scheme is judged on Fort Pitt terms

What is permitted in Fort Pitt turns on designation first, so that is where we start: Maidstone Road, Chatham (conservation area designated in 2005), New Road, Chatham (conservation area designated in 1972), New Road, Rochester (conservation area designated in 1995) and Star Hill to Sun Pier (conservation area designated in 1994). Inside those boundaries permitted development is curtailed and Medway Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Medway Council has 47 recorded Article 4 directions — check the address before assuming PD applies in Fort Pitt.

On stock, Fort Pitt is 1930s semi-detached and detached houses (28% of 5,140 homes), Victorian and earlier houses (21%) and Edwardian houses (9%) — which is why hipped roofs with shallow pitches typical of 1930s building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building govern what a loft or rear projection can realistically be. Medway Council decided 540 householder applications in the latest published year and granted 96%, with 94% issued inside the eight-week target. We draw to that record rather than to a national average.

The full build-period split for Fort Pitt runs pre-1900 21% (1,080 homes), 1900-1918 9% (460 homes), 1919-1929 5% (250 homes), 1930-1939 28% (1,440 homes), 1945-1954 1% (50 homes), 1955-1964 8% (410 homes), 1965-1972 1% (70 homes), 1973-1982 3% (160 homes), 1983-1992 4% (190 homes), 1993-1999 5% (250 homes) and 2000-2008 5% (240 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Medway Council also decides for All Saints, Rainham North, Rainham South East and Strood Rural, so a decision in Fort Pitt sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

The Article 4 directions recorded for this council include Brompton Lines(1), Brompton Lines(2), Chatham Central & Brompton and Fort Pitt. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.

Fort Pitt by the published data

Published figures for Fort Pitt and Medway Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureFort Pitt
Dwellings recorded5,140
Built pre-19001,080 (21%)
Built 1900-1918460 (9%)
Built 1919-1929250 (5%)
Built 1930-19391,440 (28%)
Built 1945-195450 (1%)
Built 1955-1964410 (8%)
Built 1965-197270 (1%)
Built 1973-1982160 (3%)
Built 1983-1992190 (4%)
Built 1993-1999250 (5%)
Built 2000-2008240 (5%)
Built before 191930%
Built 1919–193933%
Built 1945–200827%
Conservation areas in Fort Pitt4 (Maidstone Road, Chatham, New Road, Chatham…)
Conservation areas district-wide24
Article 4 directions recorded47
Householder applications decided540
Householder applications granted96%
Decided within 8 weeks94%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Medway Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

Orangery or conservatory — what changes in Fort Pitt

The difference is not marketing. A conservatory is predominantly glazed — at least three quarters of the roof and half of the walls — which is what earns it the building-regulations exemption. An orangery has a solid masonry perimeter with a glazed lantern set into a flat roof, so it usually reads as a conventional extension for building control and has to meet Part L thermal standards, Part A structure and Part B fire like any other room.

Both are judged the same way for planning: as rear extensions, against the Class A depth, height and eaves limits, and against Medway Council's development plan and the design policies it applies to householder applications. Fort Pitt is largely 1930s semi-detached and detached houses (28% of 5,140 homes), Victorian and earlier houses (21%) and Edwardian houses (9%), and the design question is usually whether the glazing reads as a lightweight addition to that stock or as a bolted-on conservatory kit. On period houses, an orangery with a properly proportioned lantern almost always sits better than a full-height glazed box.

In conservation areas such as Maidstone Road, Chatham and New Road, Chatham, rear glazing is assessed on visibility from the street and on the effect on the rear elevation's character. Medway Council has 47 recorded Article 4 directions — check the address before assuming PD applies in Fort Pitt.

Isometric orangery drawing for a Fort Pitt house

Does a conservatory need planning permission in Fort Pitt?

Many conservatories are permitted development. You will need an application to Medway Council where any of these apply:

  • The projection exceeds 3 metres on a terraced or semi-detached house, or 4 metres on a detached house
  • The eaves exceed 3 metres where the structure is within 2 metres of a boundary
  • More than half the land around the original house would be covered by buildings
  • The conservatory is to the side and wider than half the original house
  • The house is on designated land such as Maidstone Road, Chatham and New Road, Chatham, where rear-extension rights are restricted
  • An Article 4 direction applies to your street, removing the relevant right
  • The building is listed — listed building consent is required as well

Fort Pitt extension decisions — live from council data

Below is Medway Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Medway Council granted 96% of its householder applications in the year to 31 March 2026, and Maidstone Road, Chatham shapes what is approved here. Glazed rear additions are judged on depth, eaves height and how the glazing meets the existing elevation.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

96%householder applications approved in Medway
87%national average — Medway is 9 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What glazed rear additions get approved in Fort Pitt

Across Maidstone Road, Chatham, New Road, Chatham and New Road, Rochester, the schemes that succeed keep the eaves below the neighbour's ground-floor cill line, set the glazing back from the boundary, and use a solid parapet or brick perimeter to tie the addition into the house. On 1930s semi-detached and detached houses (28% of 5,140 homes), a lantern set in a flat roof usually reads better than a pitched glazed roof, and it avoids the summer overheating that makes full conservatories unusable for months a year.

Fort Pitt contains Maidstone Road, Chatham, New Road, Chatham, New Road, Rochester conservation areas (Maidstone Road, Chatham designated 2005), so materials, fenestration and roof form are assessed against the appraisal. The decision worth making early is whether to keep the separating doors. Keeping them preserves the building-regulations exemption but leaves you with a room that is not part of the house; removing them creates one continuous space but brings the whole addition inside Part L, which changes the glazing specification and usually the heating design too. We set out both versions before you commit.

Orangery extension to the rear of a house in Fort Pitt

Orangeries and conservatories across Fort Pitt

We draw glazed rear additions across Fort Pitt. A few of the areas where they come up most often:

Maidstone Road, Chatham

Orangery and conservatory drawings for Maidstone Road, Chatham — conservation area designated in 2005 — checked against the Class A limits and drawn to Medway Council's guidance.

New Road, Chatham

Orangery and conservatory drawings for New Road, Chatham — conservation area designated in 1972 — checked against the Class A limits and drawn to Medway Council's guidance.

New Road, Rochester

Orangery and conservatory drawings for New Road, Rochester — conservation area designated in 1995 — checked against the Class A limits and drawn to Medway Council's guidance.

Star Hill to Sun Pier

Orangery and conservatory drawings for Star Hill to Sun Pier — conservation area designated in 1994 — checked against the Class A limits and drawn to Medway Council's guidance.

Conservatory or orangery in Fort Pitt — which rules apply?

The planning test is the same for both. The building-regulations test is not.

StructurePlanning routeBuilding regulationsPractical effect
Conservatory under 30m², doors retainedClass A rear extension limitsLargely exemptCheaper build, unheated in winter
Conservatory, doors removedClass A rear extension limitsPart L applies in fullContinuous space, higher spec glazing
Orangery with solid perimeter and lanternClass A rear extension limitsFully regulatedUsable year round, better on period houses
Any of the above beyond the depth limitsFull householder applicationAs above8-week determination
Any of the above on designated landFull householder applicationAs aboveDesign and visibility assessed

Planning limits from the GPDO 2015, Schedule 2, Part 1, Class A; exemption criteria from the Building Regulations 2010, Schedule 2, Class 7.

Four steps to an approved Fort Pitt orangery

A fixed process covering both consents, because they pull in different directions.

  1. 1

    Free approval check

    Send us your Fort Pitt postcode and house type. We confirm the Class A limits that apply, check designation status, and score your odds against live Medway Council decisions.

  2. 2

    Measured survey

    We measure the rear elevation, eaves and ground levels, and the neighbouring boundary — the numbers that decide both the projection limit and the 2-metre eaves rule.

  3. 3

    Design & drawings

    Chartered designers develop the orangery or conservatory to your brief, and we set out clearly whether it stays inside the building-regulations exemption or becomes a fully regulated room.

  4. 4

    Submission & follow-through

    We submit the certificate or application, manage validation and officer queries, and revise free until Medway Council decides.

Frequently asked questions

Do I need planning permission for a conservatory in Fort Pitt?

Often not. A conservatory is treated as a rear extension, so it can be permitted development within the Class A limits — 3 metres of projection on a terrace or semi, 4 metres on a detached house, with eaves under 3 metres where it sits within 2 metres of a boundary. In Fort Pitt you will need an application to Medway Council beyond those limits, and on designated land such as Maidstone Road, Chatham and New Road, Chatham.

Is a conservatory exempt from building regulations in Fort Pitt?

A conservatory is largely exempt if it is under 30 square metres, at ground level, separated from the house by external-quality doors, and has at least 75% of its roof and 50% of its walls glazed. Glazing, electrics and any drainage work still have to comply. Remove the separating doors and the exemption falls away — the space becomes part of the house and Part L thermal standards apply. This applies to your Fort Pitt address specifically. Medway Council is the decision-maker.

What is the difference between an orangery and a conservatory in planning terms?

For planning, none — both are rear extensions assessed against the same Class A limits by Medway Council. The difference is in building control: an orangery's solid perimeter and flat roof with a lantern usually means it fails the glazing test for exemption, so it is fully regulated. That is why an orangery costs more to build but is comfortable in January. This applies to your Fort Pitt address specifically.

Can I have a conservatory in a Fort Pitt conservation area?

Usually yes at the rear, though permitted-development rights are narrower on designated land and an Article 4 direction can remove them entirely. The assessment turns on whether the addition is visible from the street and how it meets the original rear elevation. A restrained orangery in matching brick with a lantern is consistently easier to get through than a proprietary glazed conservatory. This applies to your Fort Pitt address specifically. Medway Council is the decision-maker.

Will a conservatory overheat in summer in Fort Pitt?

A fully glazed roof will, unless it is specified for it. That is the practical reason most of our clients end up building an orangery instead: a solid insulated roof perimeter with a lantern gives daylight without the greenhouse effect, and keeps the space usable across the year. We raise it at design stage because it is much cheaper to solve on paper than after the build. This applies to your Fort Pitt address specifically. Medway Council is the decision-maker.

Do I need a party wall notice for an orangery in Fort Pitt?

If you excavate foundations within 3 metres of a neighbouring structure and deeper than its foundations, or build on the boundary itself, the Party Wall etc. Act 1996 applies and notice must be served. That is separate from Medway Council's planning decision. We flag it at design stage so the notice period does not delay the start on site. This applies to your Fort Pitt address specifically.

How much do orangery plans in Fort Pitt cost?

We quote each Fort Pitt orangery or conservatory individually, because the structure and the roof form change the work considerably, and send a fixed, no-obligation quote within one working day. It covers the full drawing pack with free revisions until Medway Council approves. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Orangery and conservatory plans across Medway

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Fort Pitt