MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
PricingProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
The long red-brick side of a Victorian civic building in East Ham with pale terracotta bands, arched windows and carved pediments, and a black street lamp in front
Planning application drawings

How much does planning permission cost in London?

Planning permission is two bills: the council's fee and the cost of the drawings that go with it. Here is what each one covers and what changes them.

Fixed fee from £825 inc survey

Tell us about your project

Share your address, best contact details, and the current stage you are at. If you already have sketches or existing plans, you can mention that in your message so we can respond with clearer advice and a more accurate quote.

No obligation · No spam · Reply within 1 working day

Photo: Ethan Doyle White, CC BY-SA 4.0

Getting planning permission for a house in London costs £825 inc survey for our drawings and submission, or £625 if you already have measured drawings of the house. On top of that you pay the council's own application fee, which is set nationally and is the same in every borough.

Most people ask the question as if there were one price. There are really three costs: the drawings, the council fee, and the extras some homes need, such as a heritage statement or structural calculations. This guide takes them in turn, says which ones you can predict today, and flags the cases where you may not need to apply at all.

The three costs behind one application

The drawings come first. A council will not register an application without a plan that identifies the land, and every plan must be drawn to an identified scale and show north. In practice that means a location plan, a block plan, and existing and proposed floor plans, elevations and sections. Our £825 inc survey covers all of those, the measured visit that produces them, a design statement, and the submission through the council's system.

Second is the council's fee. The amount depends on the type of development, and national regulations fix it in three bands: householder, other non-major development, and major development. A house extension normally falls in the householder band. You pay it with the application, and you pay it whatever the outcome.

Third are the extras. They are not part of every application, which is why they are easy to forget when budgeting. A listed house needs a heritage statement. A tree close to the extension needs a survey. A new opening in a load-bearing wall needs an engineer’s calculations.

What our drawings cost for three common London projectsPlanning application drawings (householder)£825Single-storey rear extension£765Rear extension with building regulations andstructural calculations£1,685Drawings and submissionMeasured survey
Totals you pay, from our published price list. The grey part of each bar is the measured survey. The council's application fee is extra and is paid to the council.

How the council fee works, and why we do not print it

Council fees move. The regulations now raise every planning fee on 1 April by the rate of inflation, measured by the Consumer Prices Index the previous September, with a cap of 10%. A figure printed in a blog post is therefore out of date within a year. We quote the fee for your scheme from the GOV.UK table on the day you ask.

Two things stay constant. The fee is identical whether your house is in Hackney or Havering, because the regulations are national. And once paid, most planning fees cannot be refunded, so the sensible order is design first, then apply.

When you do not need to pay for planning permission at all

Brick terraced and semi-detached houses on a Woolwich street, where many rear extensions are built under permitted development
A Woolwich street of mixed terraces and semis. Many homes like these extend without a planning application.

Photo: Kleon3, BY-SA 4.0

Plenty of London homes can be extended without planning permission, because Parliament has granted general consent for common projects. The detail sits in Schedule 2, Part 1 of the General Permitted Development Order. A single-storey rear extension on a house that is not detached may project up to 3 metres from the original rear wall, or 4 metres on a detached house, and may be up to 4 metres high.

Those limits do not apply everywhere. Flats and maisonettes have no householder rights. Conservation areas, listed buildings and streets covered by an Article 4 direction lose some or all of them. Houses that were extended before you bought them may have used up the allowance already. If your plans sit inside the limits, a certificate or a prior approval costs less than a full application, and sometimes you need nothing.

We tell you which route applies before you spend anything on drawings. If the answer is that your project needs no application, we say so; that is cheaper for you and it keeps the advice honest.

What makes one application cost more than another

Our starting price suits a single house with one clear project. These are the things that lift it, and the council can ask for most of them as a matter of validation:

  • A larger scheme: two storeys, a loft and a rear extension together, or a wraparound extension, needs more sheets of drawings.
  • A conservation area or listed building, where a heritage or design statement is expected and the drawings must show original features.
  • A site with trees, flood risk or a public sewer nearby, each of which brings its own report.
  • A house we cannot measure easily, such as one with a tenant who limits access or a very deep plot.

Your choice of builder does not change what we charge. It does change the total project budget, which is why we also offer building regulations drawings and structural calculations as separate fixed fees, so you can see the whole sum before committing.

How long you wait, and what happens if the answer is no

The statutory period for most applications is 8 weeks from the day after the council receives a valid one. Councils can ask you to agree a longer period. London boroughs decided 24,758 householder applications in the year to March 2026, so volume is high and a clean, complete set helps yours move.

From first call to a planning decision1Route checkPermitted development, certificate or fullapplication2Measured visitWe survey the house and plot3DrawingsLocation, block, existing and proposed plans4SubmissionWe file it and you pay the council fee5DecisionUsually inside 8 weeks; we handle officer queries

If an application is refused, you can appeal for up to 12 weeks from the date on the decision letter. Our fee includes revisions until the council decides, so a request to amend the drawings during the process does not become a second invoice.

The figures in this article, and where they come from

  1. Plans for an application must be drawn to an identified scale and show the direction of north (article 7(2)).

    Source: legislation.gov.uk, Development Management Procedure Order 2015, article 7
  2. Planning fees rise every 1 April by the Consumer Prices Index of the previous September, capped at 10%.

    Source: GOV.UK, Fees for planning applications
  3. Planning fees are set in 3 categories: householder, non-major development other than householder, and major development.

    Source: GOV.UK, Fees for planning applications
  4. The standard period for deciding a householder application is 8 weeks beginning with the day after the council receives it.

    Source: legislation.gov.uk, Development Management Procedure Order 2015, article 34
  5. A single-storey rear extension may extend up to 3 metres beyond the rear wall of an attached house, or 4 metres for a detached house, and up to 4 metres high, under Class A.

    Source: legislation.gov.uk, GPDO 2015, Schedule 2, Part 1, Class A
  6. After a refusal of a householder application you can appeal for up to 12 weeks from the date on the decision letter.

    Source: GOV.UK, Appeal a householder planning decision
  7. London councils decided 24,758 householder applications in the year to March 2026.

    Source: GOV.UK, Planning applications statistics (PS2)

Questions people ask

Can I pay the council fee and the drawing fee together?

No. The council takes its fee through its own online portal when the application is submitted, and we take ours for the drawings. We submit on your behalf and tell you the council fee before we do.

Is the price the same in every London borough?

Our drawings price does not depend on the borough. The council fee is national, so that does not either. What changes by borough is the local validation list, which sets out extra documents some councils want, such as a sustainability statement. We check the local list before we submit.

Do I need planning permission for a loft conversion?

Often not. Many lofts are permitted development, with limits on volume and position, and are better handled with a certificate than a full application. A loft conversion with rooflights starts at £765 inc survey with us, and we confirm the route first.

What if the council asks for changes?

Officers regularly ask for small amendments, such as a lower ridge or a window moved off a boundary. Revisions are included in our price until the council decides, so you pay for the drawings once.

Do I need building regulations as well?

Yes, for almost any structural work. Planning permission and building regulations are separate approvals. Our building regulations drawings are £825 inc survey.

Planning application drawings: from £825 inc survey

(£625 if you supply measured drawings)

What you get

  • Measured survey
  • Existing and proposed plans and elevations
  • Location and block plans
  • Design statement
  • Council submission
  • Free revisions until the council decides
  • A check of your address for conservation area, listing and Article 4 limits

The total you pay, fixed in writing before you commit. Council fees are separate and paid to the council. Prices checked 24 October 2026.

How our planning application drawings service works

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Keep reading

Get a fixed quote from £825