Full-plans building regulations drawings for Ealing — the technical construction set covering structure, fire safety, insulation and Part L, drawn to satisfy building control so your builder can price and build with certainty, delivered in days and revised free until sign-off, with a free project check first.
Ealing Council granted 85% of the householder planning decisions it made in its latest published year — 2 points below the 87% England-wide householder average. Case officers apply the borough's daylight and outlook tests strictly across tight Victorian plot lines, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901), Edwardian (1901–1910) and interwar (1918–1939) housing stock sets the design brief on most streets.
Class A and Class B set the thresholds — a rear dormer to 40m³ on a terrace or 50m³ on a semi or detached, and a single-storey rear extension to 3m on a terrace or 4m on a detached house — beyond which Ealing Council needs a full application. Ealing carries at least one Article 4 direction, and conservation areas including Bedford Park, Ealing Common and Ealing Green remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Ealing is determined against an 8-week statutory target.
Ealing Broadway (red-brick Victorian and Edwardian terraces around the town centre), Hanwell (Edwardian terraces and the Hanwell Village Green conservation area), Northfields (Edwardian streets around Lammas Park), West Ealing (mixed Victorian terraces and converted flats), Greenford (interwar semi-detached estates) and Perivale (1930s Metroland semis with hipped roofs) — these are the Ealing pockets our drawings cover most. Heritage designations here include Bedford Park, Ealing Common, Ealing Green, Hanwell Village Green and Northfields (Lammas Park). Ealing Council weighs each proposal against Ealing Local Plan and the Residential Extensions and Alterations SPD, where roof bulk on paired 1930s houses is a recurring refusal reason. Converted terraces are common across West Ealing and Hanwell, and flats and maisonettes have no householder permitted-development rights.. On roofs the borough is London butterfly / valley roofs on the terraces and hipped roofs on the 1930s semis, over Victorian and Edwardian terraces, interwar semi-detached houses and converted period flats.
Planning permission decides whether you can build; the Building Regulations decide that what you build is safe, warm and sound. They are two separate approvals, run by different bodies, and a Ealing project usually needs both. The building regulations set is the technical layer beneath the planning drawings — construction sections, structural details, insulation build-ups and fire-safety provisions that a builder works from and a building control surveyor checks against the approved documents.
In practice that means Part A structure — beam and foundation details with the structural calculations behind them; Part B fire — escape, protected routes and, in a loft, a fire door and mains-linked alarms; Part L conservation of fuel and power — U-values, insulation and airtightness; plus drainage, ventilation and stairs. On Ealing's stock, which runs to Victorian and Edwardian terraces, interwar semi-detached houses and converted period flats, the recurring challenge is meeting Part L in solid-walled period houses without ruining the room, and we detail the insulation to hit the numbers with the least intrusion.
Building control applies everywhere in Ealing regardless of planning designation, but in conservation areas such as Bedford Park, Ealing Common, Ealing Green, Hanwell Village Green and Northfields (Lammas Park) the two processes interact — insulation and window details often have to satisfy Part L and a planning condition at once. Bedford Park — shared with Hounslow — carries a long-established Article 4 direction, and several other Ealing conservation areas remove permitted-development rights, so PD can never be assumed on those streets. We draw the construction details to reconcile both.

A full-plans set for Ealing building control is checked against the Approved Documents. A typical extension or loft set covers each of these:
We produce the full-plans construction set — structure, fire, thermal and drainage details with the structural calculations — and submit it to your chosen building control body, whether that is Ealing Council's own team or an approved inspector, so problems are settled on paper before they cost money on site.
Building control is a separate approval, but most Ealing projects clear planning first, so Ealing Council's live decision record below sets the context. Ealing grants around the London average of householder applications, with roof bulk on paired 1930s houses and neighbour daylight across narrow plots the most common sticking points. We handle both stages, so the construction drawings follow through seamlessly once permission is granted.
Source: MHCLG planning application statistics (householder decisions, rolling year). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
There are two ways to get building control approval, and for anything structural in Ealing we recommend the full-plans route — particularly on the borough's victorian and edwardian terraces and interwar semi-detached houses, where opening up an old structure tends to reveal surprises. A building notice lets work start with no approved drawings — cheaper up front, but the surveyor rules on compliance as the build proceeds, so a wrong detail is discovered mid-work and rebuilt at your cost. Full plans get the whole set checked and approved before a brick moves, which is what banks, warranty providers and future buyers want to see.
Full plans also protect the project commercially. With approved construction drawings your builder prices exact quantities rather than guessing, and there is a completion certificate at the end — the document a solicitor asks for when you sell across Ealing Broadway, Hanwell and Northfields and the rest of Ealing. Where a project sits in a controlled setting — case officers apply the borough's daylight and outlook tests strictly across tight Victorian plot lines — the construction details also have to respect what planning has conditioned, and we draw the full set and manage the building control submission to reconcile both.

Every structural project needs building regulations drawings whatever the planning position. A few of the Ealing neighbourhoods and property types where we prepare them most often:
Building regulations drawings for Ealing Broadway's red-brick Victorian and Edwardian terraces around the town centre — structure, fire and Part L detailed for building control sign-off.
Building regulations drawings for Hanwell's Edwardian terraces and the Hanwell Village Green conservation area — structure, fire and Part L detailed for building control sign-off.
Building regulations drawings for Northfields's Edwardian streets around Lammas Park — structure, fire and Part L detailed for building control sign-off.
Building regulations drawings for West Ealing's mixed Victorian terraces and converted flats — structure, fire and Part L detailed for building control sign-off.
Building regulations drawings for Greenford's interwar semi-detached estates — structure, fire and Part L detailed for building control sign-off.
Building regulations drawings for Perivale's 1930s Metroland semis with hipped roofs — structure, fire and Part L detailed for building control sign-off.
They are different approvals and most projects need both. This is how they split in Ealing.
| Planning permission | Building regulations | |
|---|---|---|
| Question it answers | Should this be built here? | Is it built safely and efficiently? |
| Decided by | Ealing Council planning | Building control body or approved inspector |
| Main drawings | Location, block, proposed plans & elevations | Structural, fire, thermal & construction details |
| Needed for permitted development? | No — a certificate is optional | Yes — always, before work starts |
In conservation areas such as Bedford Park and Ealing Common, a planning condition can dictate materials that the building regulations details must then also satisfy.
A fixed process built around how Ealing projects are approved and inspected — most construction sets are ready within seven days of survey.
Send us your Ealing postcode and scheme. We confirm whether you also need planning, which parts of the regulations apply, and whether Ealing Council building control or an approved inspector suits the job.
We measure the existing structure so the construction details, spans and junctions are drawn to the real building rather than an assumption — the base sound structural calculations depend on.
Chartered designers and engineers produce the full-plans set — structure, fire, Part L thermal, drainage and details — with the structural calculations that support every beam and foundation.
We submit the full-plans application to your building control body, resolve any queries before work starts, and revise the drawings free until the set is approved and the work signed off.
They are two separate approvals. Planning permission, decided by Ealing Council, answers whether a scheme should be built at all — its size, look and impact on neighbours. Building regulations, checked by a building control body, answer whether it is built safely and efficiently — structure, fire, insulation and drainage. A Ealing project usually needs both, and even permitted-development work that skips planning still needs building control sign-off.
Yes — planning permission is not building control approval. The planning drawings show what the building looks like; building regulations drawings show how it is constructed, and no structural work in Ealing can lawfully complete without a building control sign-off. The two sets are drawn together but approved by different bodies, so having one never removes the need for the other. Ealing Council is the decision-maker.
For anything structural in Ealing — a loft, an extension or removing a wall — we recommend full plans. The whole construction set is checked and approved before work starts, so a non-compliant detail is caught on paper rather than rebuilt on site. On the borough's victorian and edwardian terraces that certainty matters, and a building notice — which lets a surveyor judge compliance as work proceeds — risks costly rework. Banks and warranty providers also prefer the approved full-plans set that Ealing Council or an approved inspector signs off.
Yes. You can use Ealing Council's building control team or an independent approved inspector — both enforce the same regulations, so it comes down to price, availability and continuity. We draw the full-plans set to the same standard either way and submit it to whichever body you choose, then manage the queries and inspections through to the completion certificate.
Solid-walled period houses — common across Ealing, including conservation areas such as Bedford Park and Ealing Common — are the hardest to bring up to Part L without losing room or altering the fabric. We detail the insulation to hit the required U-values with the least intrusion, using internal or roof-level build-ups and, where a planning condition protects the exterior, methods that satisfy both the energy standard and the heritage requirement at once. Ealing Council is the decision-maker.
We price each Ealing job individually, because the structural content and the size of the construction set vary from a single beam to a whole-house refurbishment, and send a fixed, no-obligation quote within one working day. It covers the full-plans drawings and structural calculations with free revisions until sign-off. The building control body's own fee is separate. Call 020 7864 7245 to start. Ealing Council is the decision-maker.
Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.
Same fixed quotes, same fast drawings — wherever your project is.