MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Larger home extension prior approval in Ferry — a deep single-storey rear extension to a house
Ferry · Prior Approval & Neighbour Consultation

Larger home extension prior approval in Ferry

The fast route to a deep single-storey rear extension in Ferry — up to 6 metres on an attached house or 8 on a detached one — via North Lincolnshire Council's prior approval scheme rather than a full planning application.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

What the data says about planning in Ferry

North Lincolnshire Council granted 91% of the householder planning decisions it made in its latest published year — 4 points above the 87% England-wide householder average. Ferry contains the Barrow upon Humber Conservation area conservation area (Barrow upon Humber Conservation area designated 1974), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901) and postwar (1945–1970) housing stock sets the design brief on most streets.

Class A and Class B set the thresholds — a rear dormer to 40m³ on a terrace or 50m³ on a semi or detached, and a single-storey rear extension to 3m on a terrace or 4m on a detached house — beyond which North Lincolnshire Council needs a full application. Ferry carries at least one Article 4 direction, and conservation areas including Barrow upon Humber Conservation area remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Ferry is determined against an 8-week statutory target.

Barrow upon Humber (conservation area designated in 1974), Barrow upon Humber (civil parish within Ferry), Croxton (civil parish within Ferry), East Halton (civil parish within Ferry), Goxhill (civil parish within Ferry), Kirmington (civil parish within Ferry) and New Holland (civil parish within Ferry) — these are the Ferry pockets our drawings cover most. Heritage designations here include Barrow upon Humber Conservation area. North Lincolnshire Council weighs each proposal against North Lincolnshire Council's adopted local plan and its householder design guidance, where the 5,230 homes here are 21% pre-1900, 12% 1965-1972, 12% 2000-2008, which is what sets the realistic roof and rear-projection options. On roofs the borough is steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and shallow-pitched roofs and integral garages typical of that period's building, over Victorian and earlier houses (21% of 5,230 homes), late-1960s and early-1970s houses (12%) and 2000s houses and apartments (12%).

Designations, stock and decisions in Ferry

Heritage designation is the single biggest variable in Ferry, and it is address-specific: Barrow upon Humber (conservation area designated in 1974). Inside those boundaries permitted development is curtailed and North Lincolnshire Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Ferry takes in Barrow upon Humber, Croxton, East Halton, Goxhill, Kirmington and New Holland. North Lincolnshire Council has 12 recorded Article 4 directions, removing permitted development for rear and side extensions and roof enlargements such as dormers — check the address before assuming PD applies in Ferry.

On stock, Ferry is Victorian and earlier houses (21% of 5,230 homes), late-1960s and early-1970s houses (12%) and 2000s houses and apartments (12%) — which is why steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and shallow-pitched roofs and integral garages typical of that period's building govern what a loft or rear projection can realistically be. North Lincolnshire Council decided 338 householder applications in the latest published year and granted 91%, with 70% issued inside the eight-week target. We work from the council's own published record.

The full build-period split for Ferry runs pre-1900 21% (1,100 homes), 1900-1918 3% (140 homes), 1919-1929 3% (140 homes), 1930-1939 4% (220 homes), 1945-1954 4% (210 homes), 1955-1964 5% (240 homes), 1965-1972 12% (650 homes), 1973-1982 10% (500 homes), 1983-1992 8% (410 homes), 1993-1999 10% (540 homes) and 2000-2008 12% (610 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

North Lincolnshire Council also decides for Axholme Central, Axholme North, Brigg & Wolds, Broughton & Scawby and Ridge, so a decision in Ferry sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

The Article 4 directions recorded for this council include Alkborough & Walcot, Appleby, Barrow upon Humber and Barton upon Humber. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.

The published numbers behind a Ferry application

Published figures for Ferry and North Lincolnshire Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureFerry
Dwellings recorded5,230
Built pre-19001,100 (21%)
Built 1900-1918140 (3%)
Built 1919-1929140 (3%)
Built 1930-1939220 (4%)
Built 1945-1954210 (4%)
Built 1955-1964240 (5%)
Built 1965-1972650 (12%)
Built 1973-1982500 (10%)
Built 1983-1992410 (8%)
Built 1993-1999540 (10%)
Built 2000-2008610 (12%)
Built before 191924%
Built 1919–19397%
Built 1945–200860%
Conservation areas in Ferry1 (Barrow upon Humber Conservation area)
Conservation areas district-wide17
Article 4 directions recorded12
Householder applications decided338
Householder applications granted91%
Decided within 8 weeks70%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are North Lincolnshire Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

How the prior approval route works in Ferry

The ordinary Class A limits stop a single-storey rear extension at 3 metres on an attached house and 4 on a detached one. The larger home extension scheme doubles both, on condition that the council is told first. That notification is not an application for permission — the council cannot refuse on design, materials or policy grounds. It can only consider the effect on the amenity of adjoining premises, and only if a neighbour actually objects during the 21-day consultation.

The other conditions still apply and are strict: single storey only, no higher than 4 metres, eaves no higher than the existing eaves, and no more than half the land around the original house covered. It is not available on designated land, so a house in a conservation area such as Barrow upon Humber Conservation area cannot use it at all. Materials must be similar to the existing house, and the extension must not include a veranda, balcony or raised platform.

Ferry is largely Victorian and earlier houses (21% of 5,230 homes), late-1960s and early-1970s houses (12%) and 2000s houses and apartments (12%). Ferry contains the Barrow upon Humber Conservation area conservation area (Barrow upon Humber Conservation area designated 1974), so materials, fenestration and roof form are assessed against the appraisal, which matters here because an objecting neighbour puts amenity squarely in front of a case officer. North Lincolnshire Council has 12 recorded Article 4 directions, removing permitted development for rear and side extensions and roof enlargements such as dormers — check the address before assuming PD applies in Ferry.

Isometric drawing of a deep rear extension in Ferry

Does your Ferry extension qualify for prior approval?

The scheme is available where all of these hold. Fail any one and it is a full application to North Lincolnshire Council instead:

  • The extension is single storey and rear-facing
  • It projects no more than 6 metres on a terraced or semi-detached house, or 8 metres on a detached house
  • It is no more than 4 metres high, with eaves no higher than the existing eaves
  • The property is a house, not a flat or maisonette
  • The property is not on designated land — the scheme is unavailable in conservation areas such as Barrow upon Humber Conservation area
  • No more than half the land around the original house is covered by buildings
  • The materials are similar in appearance to the existing house
  • You notify the council BEFORE building — retrospective use of the scheme is not possible

Ferry householder decisions — live from council data

Below is North Lincolnshire Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. North Lincolnshire Council granted 91% of its householder applications in the year to 31 March 2026, and Barrow upon Humber Conservation area shapes what is approved here. Prior approval turns on neighbour amenity alone, so the drawings that matter are the ones showing the relationship to the boundary.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

91%householder applications approved in North Lincolnshire
87%national average — North Lincolnshire is 4 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What gets through prior approval in Ferry

Across Barrow upon Humber, Barrow upon Humber and Croxton, the notifications that clear without objection are the ones that treat the neighbour as the audience. We show the extension in section against the boundary, demonstrate the 45-degree daylight relationship to the nearest habitable window, and where the plot is tight we taper the depth away from the boundary rather than running the full 6 metres to the fence.

The 5,230 homes here are 21% pre-1900, 12% 1965-1972, 12% 2000-2008, which is what sets the realistic roof and rear-projection options. Where an objection does arrive, the council's assessment is narrow: loss of light, outlook and overbearing effect on the adjoining property, nothing else. A pack that has already answered those three points on the drawings usually survives an objection, whereas one that leaves them to the officer's imagination usually does not.

Deep single-storey rear extension to a house in Ferry

Larger home extensions across Ferry

We prepare prior-approval notifications across Ferry. A few of the areas where deep rear extensions come up most often:

Barrow upon Humber

Prior approval drawings for Barrow upon Humber — conservation area designated in 1974 — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

Barrow upon Humber

Prior approval drawings for Barrow upon Humber — civil parish within Ferry — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

Croxton

Prior approval drawings for Croxton — civil parish within Ferry — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

East Halton

Prior approval drawings for East Halton — civil parish within Ferry — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

Goxhill

Prior approval drawings for Goxhill — civil parish within Ferry — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

Kirmington

Prior approval drawings for Kirmington — civil parish within Ferry — dimensioned to the 6m and 8m limits and prepared for North Lincolnshire Council's neighbour consultation.

Prior approval or full application in Ferry?

Same extension, two routes, very different tests.

RouteDepth allowedWhat the council may considerTimescale
Ordinary Class A permitted development3m attached / 4m detachedNothing — no application neededImmediate
Larger home extension prior approval6m attached / 8m detachedAmenity of adjoining premises, only if a neighbour objects21-day consultation, 42-day determination
Full householder applicationNo fixed limitDesign, materials, policy, amenity, everything8-week target
Any of these on designated land3m / 4m onlyPrior approval scheme unavailableFull application beyond the limits

Limits and procedure from the GPDO 2015, Schedule 2, Part 1, Class A and paragraph A.4, made permanent by amendment in 2019.

Four steps to prior approval in Ferry

A process built around the 21-day consultation, which is where these schemes are won or lost.

  1. 1

    Free eligibility check

    Send us your Ferry postcode and house type. We confirm whether the property is on designated land, whether the scheme is available, and what depth you can realistically take.

  2. 2

    Measured survey

    We measure the original rear wall, eaves height, boundary distances and the neighbouring windows that the amenity assessment will turn on.

  3. 3

    Notification pack

    We draw the extension to the 6m or 8m limit with the boundary relationship shown in section, and prepare the written description and adjoining-owner details North Lincolnshire Council needs to start the consultation.

  4. 4

    Consultation & follow-through

    We submit, track the 21-day consultation and the 42-day determination, respond to any objection on amenity grounds, and revise free until the decision.

Frequently asked questions

How deep can a rear extension be in Ferry without planning permission?

Three metres on a terraced or semi-detached house and four on a detached one under ordinary permitted development. Under the larger home extension prior approval scheme those double to six and eight metres, provided you notify North Lincolnshire Council before starting and the conditions on height, materials and land coverage are met. The scheme is not available on designated land. This applies to your Ferry address specifically.

What is prior approval for a larger home extension in Ferry?

It is a notification, not an application for permission. You tell North Lincolnshire Council what you intend to build, it writes to the adjoining owners, and they have 21 days to object. If nobody objects, you may build. If someone does, the council assesses the effect on the amenity of adjoining premises and must decide within 42 days. Design and policy are not in scope. This applies to your Ferry address specifically.

What happens if my neighbour objects in Ferry?

The council then considers the impact on the amenity of the adjoining property — loss of light, loss of outlook, and overbearing effect — and nothing else. It cannot refuse because it dislikes the design or the materials. We prepare the drawings so those three questions are already answered in section and on the site plan, which is what usually carries an objected scheme through. This applies to your Ferry address specifically. North Lincolnshire Council is the decision-maker.

Can I use prior approval in a Ferry conservation area?

No. The larger home extension scheme is unavailable on designated land, which includes conservation areas such as Barrow upon Humber Conservation area, national landscapes, national parks and world heritage sites. On those properties the ordinary 3-metre and 4-metre limits apply, and anything deeper needs a full householder application to North Lincolnshire Council. This applies to your Ferry address specifically.

How long does prior approval take in Ferry?

Twenty-one days for the neighbour consultation, and a maximum of 42 days from a valid submission for the council to determine it. If the council does not respond within 42 days you may proceed as notified. That deadline is the scheme's real advantage over a full application, and it is why validation completeness matters so much. This applies to your Ferry address specifically. North Lincolnshire Council is the decision-maker.

Do I still need building regulations approval in Ferry?

Yes — always. Prior approval deals only with the planning position. A 6-metre rear extension still needs building control approval for foundations, structure, drainage, thermal performance and fire safety, and the beam over the opening into the existing house needs designing and calculating. We prepare both sets so the notified scheme is the buildable one. This applies to your Ferry address specifically. North Lincolnshire Council is the decision-maker.

How much do prior approval drawings in Ferry cost?

We quote each Ferry scheme individually, because plot shape and the boundary relationship drive the work, and send a fixed, no-obligation quote within one working day. It covers the notification pack and free revisions until North Lincolnshire Council determines it. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Larger home extension prior approval across North Lincolnshire

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Ferry