Change-of-use drawings for Barnet — commercial to residential under Class MA, or a full application where the use classes do not line up — measured, drawn and evidenced for Barnet Council, with free revisions until your decision.
Barnet Council granted 86% of the householder planning decisions it made in its latest published year — 1 point below the 87% England-wide householder average. Hampstead Garden Suburb schemes are assessed against the Suburb's own design code as well as council policy, which is where a policy-literate drawing pack earns its keep. Its dominant Edwardian (1901–1910), interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.
Class A and Class B set the thresholds — a rear dormer to 40m³ on a terrace or 50m³ on a semi or detached, and a single-storey rear extension to 3m on a terrace or 4m on a detached house — beyond which Barnet Council needs a full application. Barnet carries at least one Article 4 direction, and conservation areas including Hampstead Garden Suburb, Mill Hill and Monken Hadley remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Barnet is determined against an 8-week statutory target.
Finchley (1930s semis around Church End), Golders Green (Edwardian and interwar houses near Hampstead Garden Suburb), Hendon (interwar semi-detached estates), Mill Hill (detached houses and the Mill Hill conservation area), Edgware (Metroland semis with hipped roofs) and Totteridge (large plots within the Green Belt and conservation area) — these are the Barnet pockets our drawings cover most. Heritage designations here include Hampstead Garden Suburb, Mill Hill, Monken Hadley, Totteridge and Finchley (Church End). Barnet Council weighs each proposal against Barnet Local Plan and the Residential Design Guidance SPD, where roof form and the symmetry of paired 1930s houses are decisive for lofts. On roofs the borough is hipped roofs on the Metroland semis and steep tiled roofs in the Garden Suburb, over 1930s semi-detached houses, Hampstead Garden Suburb cottages and houses and postwar and detached homes.
The 2020 amendments to the Use Classes Order collapsed shops, offices, cafés, gyms and clinics into a single Class E, so movement between those uses is generally not development at all and needs no application. What still bites is the move out of Class E — most importantly into residential — and the uses that sit outside the class system altogether, such as houses in multiple occupation, pubs, takeaways and betting shops, each of which is sui generis or in its own class.
Class MA gives a prior-approval route from Class E to dwellings. Barnet Council cannot refuse it on general planning-policy grounds, but it can and does assess a defined list: transport, contamination, flooding, noise from nearby commercial premises, natural light to all habitable rooms, and the impact of losing a ground-floor service use in a designated area. The qualifying conditions are strict — two years in Class E use, three months vacant, and a floorspace cap — and evidence of those facts is part of the submission, not an afterthought.
Barnet's stock is largely 1930s semi-detached houses, Hampstead Garden Suburb cottages and houses and postwar and detached homes, and the buildings that come up for conversion here sit among Finchley, Golders Green, Hendon and Mill Hill — which is why the noise and amenity questions differ street by street rather than following a district-wide rule. Where the building sits in a conservation area such as Hampstead Garden Suburb, Mill Hill, Monken Hadley, Totteridge and Finchley (Church End), the shopfront and frontage questions come back into play even on a prior-approval route. Hampstead Garden Suburb is one of London's most tightly controlled conservation areas, with an Article 4 direction and its own Trust scheme of management — most external changes there need consent.
Hampstead Garden Suburb schemes are assessed against the Suburb's own design code as well as council policy, and roof form and the symmetry of paired 1930s houses are decisive for lofts. Both bear directly on a conversion: Barnet Council reads the resulting homes against the same amenity expectations it applies to new build, so the layout has to stand up as housing before the prior-approval matters are even reached.

Movement within Class E is usually not development. You will need prior approval or a full application from Barnet Council where any of these apply:
We measure the building as existing, draw the proposed layout to habitable-room and daylight standards, and assemble the qualifying evidence — use history, vacancy, floorspace — so the prior-approval clock starts on a complete submission.
Below is Barnet Council's real decision record, drawn from official planning statistics and refreshed as new data lands. Barnet grants a strong share of householder applications, but its Garden Suburb and Metroland conservation areas apply detailed roof- and frontage-design controls that shape loft and extension schemes. Prior-approval applications are decided against a fixed list of matters, so a submission that answers each one directly is the one that gets through.
Source: MHCLG planning application statistics (householder decisions, rolling year). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Across Finchley, Golders Green and Hendon, the conversions that go through are the ones that treat the resulting homes as homes: every habitable room with adequate natural light, room sizes meeting the nationally described space standards, sensible refuse and cycle provision, and a considered answer on noise where the neighbouring units are still commercial. Natural light is the single most common reason a Class MA prior approval is refused, and it is a drawing problem before it is a policy problem.
Hampstead Garden Suburb schemes are assessed against the Suburb's own design code as well as council policy. Where the building does not qualify for Class MA — because of its use history, its floorspace or a local Article 4 direction — a full application is the honest route, and we say so at the outset rather than burning 56 days on a prior approval that was never going to be granted.

We prepare change-of-use submissions across Barnet. A few of the areas where conversions come up most often:
Change of use drawings for Finchley — 1930s semis around Church End — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Change of use drawings for Golders Green — Edwardian and interwar houses near Hampstead Garden Suburb — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Change of use drawings for Hendon — interwar semi-detached estates — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Change of use drawings for Mill Hill — detached houses and the Mill Hill conservation area — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Change of use drawings for Edgware — Metroland semis with hipped roofs — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Change of use drawings for Totteridge — large plots within the Green Belt and conservation area — measured, laid out to space and daylight standards, and evidenced for Barnet Council.
Three routes, three different tests and three different timetables.
| Change | Route | Determination period | What Barnet Council assesses |
|---|---|---|---|
| Shop to café or office (within Class E) | Not development — no application | n/a | Nothing, unless conditions restrict use |
| Class E to dwellings | Class MA prior approval | 56 days | Transport, flooding, contamination, noise, natural light |
| Class E to dwellings, not qualifying | Full planning application | 8 weeks (13 for major) | Full policy assessment |
| House to small HMO | Class L, unless Article 4 applies | n/a or 8 weeks | Concentration, amenity, parking |
| Anything to sui generis use | Full planning application | 8 weeks | Amenity, hours, highways |
Routes from the Town and Country Planning (Use Classes) Order 1987 as amended in 2020, and the GPDO 2015, Schedule 2, Part 3, Class MA.
A process built around the qualifying evidence, not just the drawings.
Tell us the current use, how long it has run and what you want to do. We confirm the use classes, whether Class MA is available in Barnet, and whether an Article 4 direction removes it.
We measure the building as existing, including window positions and floor-to-ceiling heights, because the daylight and space-standards case depends on real dimensions.
We draw the proposed layouts to space and daylight standards and assemble the use-history, vacancy and floorspace evidence Barnet Council needs to validate the submission.
We submit, track the determination period, answer officer queries and revise free until the decision is issued.
It depends on the use classes. Moving between uses inside Class E — shop, office, café, gym, clinic — is generally not development and needs no application to Barnet Council. Moving out of Class E, particularly into residential, needs either prior approval under Class MA or a full application. We establish which applies before any drawing work, because the routes have different evidence requirements.
Class MA is the permitted-development right that allows Class E commercial, business and service premises to become dwellings. Barnet Council assesses a defined list of matters — transport, contamination, flooding, noise, natural light and, in some designated areas, the loss of a ground-floor service use — and must determine within 56 days. It cannot refuse on general policy grounds, which is why it is a faster route where the building qualifies.
The building must have been in Class E use for at least two years before the application, and must have been vacant for at least three months immediately before it. There is also a floorspace cap, and the right is disapplied on certain protected land and where an Article 4 direction removes it. Evidence of use history and vacancy forms part of the submission — a bare assertion will not validate. This applies to your Barnet address specifically. Barnet Council is the decision-maker.
Yes, and it is the most common reason Class MA prior approvals fail. Every habitable room must have adequate natural light, and deep commercial floorplates frequently cannot deliver it without new openings or a reduced unit count. We test it on the layout first, because discovering it after submission costs a full determination period. This applies to your Barnet address specifically. Barnet Council is the decision-maker.
Almost always where the use becomes residential. A material change of use triggers requirements for fire safety and means of escape, sound insulation between units under Part E, ventilation, and thermal performance. Planning and building control are separate consents — we prepare both so the scheme that is approved is the scheme that can be built and signed off. This applies to your Barnet address specifically. Barnet Council is the decision-maker.
A Class MA prior approval must be determined within 56 days of a valid submission, and the application is deemed approved if the council fails to decide in time — which makes validation completeness unusually valuable. A full application runs to the standard eight-week target, or thirteen weeks if it counts as a major development. This applies to your Barnet address specifically. Barnet Council is the decision-maker.
We quote each Barnet change of use individually, because the survey effort and the evidence needed depend entirely on the building and its use history, and send a fixed, no-obligation quote within one working day. It covers survey, layouts and supporting evidence with free revisions until Barnet Council decides. Call 020 7864 7245 to start.