MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Two storey extension plans in Totley — a two-storey rear addition to a family house
Totley · Two Storey Extension Drawings

Two storey extension plans in Totley

Two-storey extension drawings for Totley homes — bedroom above, living space below, drawn against the 3-metre projection and 7-metre boundary rules and to Sheffield City Council's design guidance, delivered in days and revised free until your decision.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Totley planning decisions and design rules

Sheffield City Council granted 87% of the householder planning decisions it made in its latest published year — level with the 87% England-wide householder average. Totley meets the Peak District National Park boundary directly, so landscape and moorland setting weigh on larger proposals, which is where a policy-literate drawing pack earns its keep. Its dominant Edwardian (1901–1910), interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.

Before permission is required, Class B allows 40m³ of added loft volume on a terrace and 50m³ on a semi or detached house, and Class A allows a 3m single-storey rear extension on a terrace or 4m on a detached house. In conservation areas such as Totley, Dore and Whirlow those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Totley is determined against an 8-week statutory target.

Totley (a historic stone village at the very south-west edge of the city, against the Peak District), Totley Rise (interwar and postwar family housing around the local shopping parade), Totley Brook (Edwardian and interwar homes on the leafy valley streets), Bradway (postwar semis and detached houses on the neighbouring hillside), Dore (the adjoining affluent stone village sharing the same moorland edge) and Bents Green (1930s semis on the rising ground towards the moors) — these are the Totley pockets our drawings cover most. Heritage designations here include Totley, Dore and Whirlow. Sheffield City Council weighs each proposal against the Sheffield Local Plan (the emerging Sheffield Plan, alongside the saved Sheffield Unitary Development Plan and Core Strategy), where outer plots sit within the Green Belt, where extensions face the openness test rather than ordinary householder policy. On roofs the borough is stone-tiled and slate roofs on the village core and hipped tiled roofs on the twentieth-century semis, over stone-built cottages along the historic village spine, interwar and postwar family semis across Totley Rise and detached houses on the moorland fringe.

The three tests a Totley two-storey extension has to pass

Adding at first floor changes the question the case officer asks. A single-storey extension is judged mostly on daylight and garden loss; a two-storey extension is judged on overlooking, bulk against the neighbouring roofline, and whether it reads as part of the house or bolted onto it. Totley is largely stone-built cottages along the historic village spine, interwar and postwar family semis across Totley Rise and detached houses on the moorland fringe, and stone-tiled and slate roofs on the village core and hipped tiled roofs on the twentieth-century semis set what a matching roof actually means here.

The permitted-development route exists but is narrow: 3 metres of rear projection, a 7-metre stand-off from the rear boundary, eaves and ridge no higher than the original, and side-facing upper windows obscure-glazed and non-opening below 1.7 metres above floor level. Most two-storey schemes fail one of those, usually the 7-metre boundary rule on a shorter garden, and go in as a full application instead. We establish which route applies before designing, because it changes the drawing set.

Totley meets the Peak District National Park boundary directly, so landscape and moorland setting weigh on larger proposals. Totley lies outside Sheffield's university HMO Article 4 direction, so small shared houses are not caught here; the Totley conservation area, covering the historic village spine along Baslow Road, instead removes permitted-development rights on its older stone properties.

Isometric two storey extension drawing for a Totley house

Does a two storey extension need planning permission in Totley?

Some two-storey rear extensions are permitted development. You will need a full application to Sheffield City Council if any of these apply:

  • The extension projects more than 3 metres beyond the original rear wall
  • Any part comes within 7 metres of the rear boundary
  • The eaves or ridge would sit higher than the existing house
  • The extension is to the side, or wraps around to the side at first floor
  • Upper-floor side windows are clear-glazed or open below 1.7 metres
  • The property is on designated land such as Totley and Dore, where two-storey rights are removed

Totley two-storey extension approval rates — live council data

Below is Sheffield City Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Sheffield grants a high share of householder applications, and in Totley the Peak District boundary, surrounding Green Belt and the stone village conservation area shape most schemes. Two-storey schemes attract more neighbour comment than any other householder work, so the overlooking and daylight case has to be made on the drawings.

Source: MHCLG planning application statistics (householder decisions, rolling year). Compare every borough on our London approval-rate league table.

87%householder applications approved in Sheffield
87%national average — Sheffield is in line with the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What two-storey extensions get approved in Totley

Across Totley, Totley Rise and Totley Brook, the schemes that succeed set the first floor back from the ground floor, keep the ridge below the original, and treat the flank wall as blank or obscure-glazed. On stone-built cottages along the historic village spine, matching the eaves line matters more than matching the brick: an extension that carries the existing eaves through reads as original even in a different material.

Outer plots sit within the Green Belt, where extensions face the openness test rather than ordinary householder policy. We draw the 45-degree daylight test from the neighbour's nearest habitable window, show the window positions in section, and set out the steel and foundation implications early — a two-storey extension changes the load path, so the structural design and the planning design have to be developed together rather than in sequence.

Ground floor created by a two storey extension in Totley

Two-storey extensions across Totley

We draw two-storey extensions across Totley. A few of the areas where they come up most often:

Totley

Two storey extension drawings for Totley — a historic stone village at the very south-west edge of the city, against the Peak District — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Totley Rise

Two storey extension drawings for Totley Rise — interwar and postwar family housing around the local shopping parade — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Totley Brook

Two storey extension drawings for Totley Brook — Edwardian and interwar homes on the leafy valley streets — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Bradway

Two storey extension drawings for Bradway — postwar semis and detached houses on the neighbouring hillside — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Dore

Two storey extension drawings for Dore — the adjoining affluent stone village sharing the same moorland edge — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Bents Green

Two storey extension drawings for Bents Green — 1930s semis on the rising ground towards the moors — dimensioned against the 3m and 7m limits and drawn to Sheffield City Council's guidance.

Which two-storey extensions are permitted development in Totley?

The first-floor limits are tighter than the ground-floor ones. This is how the common cases compare.

SchemePermitted development?Deciding limitWhat Sheffield City Council checks
Two-storey rear, 3m projection, 7m+ to boundaryOften yes3m projection / 7m boundaryRoof match, side-window glazing
Two-storey rear, under 7m to boundaryNo — full applicationRear-boundary distanceOverlooking, daylight, garden loss
Two-storey side extensionNo — full applicationSide elevationGap to boundary, street rhythm
Two-storey wraparoundNo — full applicationCombined footprintBulk, massing, neighbour amenity
Any two-storey on designated landNo — full applicationDesignationCharacter and appearance

Limits from the GPDO 2015, Schedule 2, Part 1, Class A — two-storey rear extension conditions.

Four steps to an approved Totley two-storey extension

A fixed process built around how Sheffield City Council validates and decides two-storey applications.

  1. 1

    Free approval check

    Send us your Totley postcode and garden depth. We measure the 7-metre boundary rule against your plot, confirm designation status, and score your odds against live Sheffield City Council decisions.

  2. 2

    Measured survey

    We measure the original rear wall, eaves and ridge heights, garden depth and every neighbouring window that faces the site — the inputs the daylight and overlooking case is built from.

  3. 3

    Design, drawings & structure

    Chartered designers develop the two-storey addition to your brief with the roof and eaves resolved, and we coordinate the load path so the structural scheme and the planning scheme are the same building.

  4. 4

    Submission & follow-through

    We submit the application, manage validation and case-officer queries, and revise the drawings free until Sheffield City Council issues its decision.

Frequently asked questions

Do I need planning permission for a two storey extension in Totley?

Often, but not always. A two-storey rear extension can be permitted development if it projects no more than 3 metres, sits at least 7 metres from the rear boundary, does not exceed the existing eaves and ridge, and has obscure-glazed non-opening side windows below 1.7 metres. In Totley, the 7-metre rule is what most commonly forces a full application to Sheffield City Council.

What is the 7 metre rule for two storey extensions in Totley?

No part of a permitted-development two-storey rear extension may come within 7 metres of the boundary opposite the rear wall of the house. It exists to protect the neighbour behind you from being overlooked at first floor. On shorter Totley gardens this is decisive, and we measure it on survey before any design work rather than discovering it at validation. Sheffield City Council is the decision-maker.

Can I build a two storey side extension in Totley?

Not under permitted development — two-storey side extensions always need a full application to Sheffield City Council. They are assessed on the gap to the boundary, whether the street's rhythm of spaces between houses survives, and whether the extension is subordinate to the original. Setting the first floor back from the front building line and down from the ridge is what usually makes the difference. This applies to your Totley address specifically.

Will a two storey extension in Totley be refused for overlooking?

Overlooking is the most common objection, and it is answerable on the drawings. We position habitable-room windows away from neighbouring gardens, obscure-glaze and fix shut anything on the flank below 1.7 metres, and show the sight lines in section. Where the geometry is tight, a rooflight or a high-level window gives the same daylight without the mutual overlooking that draws objections. This applies to your Totley address specifically. Sheffield City Council is the decision-maker.

Do I need a party wall agreement for a two storey extension in Totley?

Almost certainly. Excavating within 3 metres of a neighbouring structure and building on or up to the boundary both trigger the Party Wall etc. Act 1996, and a two-storey extension usually does both. It is entirely separate from Sheffield City Council's planning decision, so we flag the notice period early and detail the junction on the drawings. This applies to your Totley address specifically.

Does a two storey extension need structural calculations in Totley?

Yes. Adding a floor changes the load path from roof to foundation, so beams, padstones and foundation depths all need designing and calculating for building control. Planning and building regulations are separate consents, and the structural set is what building control assesses — we prepare both so the approved scheme is the buildable one. This applies to your Totley address specifically. Sheffield City Council is the decision-maker.

How much do two storey extension plans in Totley cost?

We quote each Totley two-storey extension individually, because plot depth, roof form and structural complexity vary house to house, and send a fixed, no-obligation quote within one working day. It covers the drawing pack with free revisions until Sheffield City Council approves. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Two storey extension plans across Sheffield

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Totley