
Two-storey extension drawings for Jewellery Quarter homes — bedroom above, living space below, drawn against the 3-metre projection and 7-metre boundary rules and to Birmingham City Council's design guidance, delivered in days and revised free until your decision.
Birmingham City Council granted 84% of the householder planning decisions it made in its latest published year — 3 points below the 87% England-wide householder average. The Jewellery Quarter conservation-area appraisal resists the loss of active manufacturing floorspace to residential use, protecting the working character, which is where a policy-literate drawing pack earns its keep. Its dominant Georgian (1714–1837) housing stock sets the design brief on most streets.
Class A and Class B set the thresholds — a rear dormer to 40m³ on a terrace or 50m³ on a semi or detached, and a single-storey rear extension to 3m on a terrace or 4m on a detached house — beyond which Birmingham City Council needs a full application. Jewellery Quarter carries at least one Article 4 direction, and conservation areas including Jewellery Quarter, St Paul's Square and Key Hill and Warstone Lane Cemeteries remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Jewellery Quarter is determined against an 8-week statutory target.
St Paul's Square (Birmingham's only surviving Georgian square, framed by townhouses and workshops), Warstone Lane (workshop terraces around the tiered Church of England cemetery), Key Hill (the General Cemetery quarter with converted works and lofts), Vyse Street (the trade's retail spine of jewellers and the Museum of the Jewellery Quarter), Golden Square (a restored public square ringed by manufacturing frontages) and Hockley edge (larger former factories reworked as loft apartments) — these are the Jewellery Quarter pockets our drawings cover most. Heritage designations here include Jewellery Quarter, St Paul's Square and Key Hill and Warstone Lane Cemeteries. Birmingham City Council weighs each proposal against Birmingham Development Plan (2017) and the Birmingham Design Guide / relevant SPDs, where workshop frontages, cart entries and industrial fenestration are protected in detail, constraining conversion and roof additions. Almost all housing here is apartments in converted workshops or new blocks, none of which hold householder permitted-development rights.. On roofs the borough is pitched and parapet-fronted industrial roofs on the workshop terraces and flat and set-back roofs on modern apartment conversions, over 19th-century jewellery workshops and warehouses converted to apartments, Georgian townhouses around St Paul's Square and new-build apartment blocks on former industrial plots.
Adding at first floor changes the question the case officer asks. A single-storey extension is judged mostly on daylight and garden loss; a two-storey extension is judged on overlooking, bulk against the neighbouring roofline, and whether it reads as part of the house or bolted onto it. Jewellery Quarter is largely 19th-century jewellery workshops and warehouses converted to apartments, Georgian townhouses around St Paul's Square and new-build apartment blocks on former industrial plots, and pitched and parapet-fronted industrial roofs on the workshop terraces and flat and set-back roofs on modern apartment conversions set what a matching roof actually means here.
The permitted-development route exists but is narrow: 3 metres of rear projection, a 7-metre stand-off from the rear boundary, eaves and ridge no higher than the original, and side-facing upper windows obscure-glazed and non-opening below 1.7 metres above floor level. Most two-storey schemes fail one of those, usually the 7-metre boundary rule on a shorter garden, and go in as a full application instead. We establish which route applies before designing, because it changes the drawing set.
The Jewellery Quarter conservation-area appraisal resists the loss of active manufacturing floorspace to residential use, protecting the working character. The Jewellery Quarter conservation area — which absorbed the earlier St Paul's Square and Key Hill conservation areas in 2000 — protects the largest surviving group of Victorian jewellery workshops in Britain, so external alterations and change-of-use are tightly controlled alongside the city-wide HMO Article 4 direction.

Some two-storey rear extensions are permitted development. You will need a full application to Birmingham City Council if any of these apply:
We set the projection and boundary distance on the site plan, prove the roof-pitch match on the elevations, and specify obscure glazing on the side windows — the three things Birmingham City Council checks first — then submit a validation-complete pack.
Below is Birmingham City Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Birmingham grants a high share of householder applications overall, but the Jewellery Quarter is dominated by conservation-led conversion and change-of-use decisions rather than typical suburban extensions. Two-storey schemes attract more neighbour comment than any other householder work, so the overlooking and daylight case has to be made on the drawings.
Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Across St Paul's Square, Warstone Lane and Key Hill, the schemes that succeed set the first floor back from the ground floor, keep the ridge below the original, and treat the flank wall as blank or obscure-glazed. On 19th-century jewellery workshops and warehouses converted to apartments, matching the eaves line matters more than matching the brick: an extension that carries the existing eaves through reads as original even in a different material.
Workshop frontages, cart entries and industrial fenestration are protected in detail, constraining conversion and roof additions. We draw the 45-degree daylight test from the neighbour's nearest habitable window, show the window positions in section, and set out the steel and foundation implications early — a two-storey extension changes the load path, so the structural design and the planning design have to be developed together rather than in sequence.

We draw two-storey extensions across Jewellery Quarter. A few of the areas where they come up most often:
Two storey extension drawings for St Paul's Square — Birmingham's only surviving Georgian square, framed by townhouses and workshops — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
Two storey extension drawings for Warstone Lane — workshop terraces around the tiered Church of England cemetery — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
Two storey extension drawings for Key Hill — the General Cemetery quarter with converted works and lofts — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
Two storey extension drawings for Vyse Street — the trade's retail spine of jewellers and the Museum of the Jewellery Quarter — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
Two storey extension drawings for Golden Square — a restored public square ringed by manufacturing frontages — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
Two storey extension drawings for Hockley edge — larger former factories reworked as loft apartments — dimensioned against the 3m and 7m limits and drawn to Birmingham City Council's guidance.
The first-floor limits are tighter than the ground-floor ones. This is how the common cases compare.
| Scheme | Permitted development? | Deciding limit | What Birmingham City Council checks |
|---|---|---|---|
| Two-storey rear, 3m projection, 7m+ to boundary | Often yes | 3m projection / 7m boundary | Roof match, side-window glazing |
| Two-storey rear, under 7m to boundary | No — full application | Rear-boundary distance | Overlooking, daylight, garden loss |
| Two-storey side extension | No — full application | Side elevation | Gap to boundary, street rhythm |
| Two-storey wraparound | No — full application | Combined footprint | Bulk, massing, neighbour amenity |
| Any two-storey on designated land | No — full application | Designation | Character and appearance |
Limits from the GPDO 2015, Schedule 2, Part 1, Class A — two-storey rear extension conditions.
A fixed process built around how Birmingham City Council validates and decides two-storey applications.
Send us your Jewellery Quarter postcode and garden depth. We measure the 7-metre boundary rule against your plot, confirm designation status, and score your odds against live Birmingham City Council decisions.
We measure the original rear wall, eaves and ridge heights, garden depth and every neighbouring window that faces the site — the inputs the daylight and overlooking case is built from.
Chartered designers develop the two-storey addition to your brief with the roof and eaves resolved, and we coordinate the load path so the structural scheme and the planning scheme are the same building.
We submit the application, manage validation and case-officer queries, and revise the drawings free until Birmingham City Council issues its decision.
Often, but not always. A two-storey rear extension can be permitted development if it projects no more than 3 metres, sits at least 7 metres from the rear boundary, does not exceed the existing eaves and ridge, and has obscure-glazed non-opening side windows below 1.7 metres. In Jewellery Quarter, the 7-metre rule is what most commonly forces a full application to Birmingham City Council.
No part of a permitted-development two-storey rear extension may come within 7 metres of the boundary opposite the rear wall of the house. It exists to protect the neighbour behind you from being overlooked at first floor. On shorter Jewellery Quarter gardens this is decisive, and we measure it on survey before any design work rather than discovering it at validation. Birmingham City Council is the decision-maker.
Not under permitted development — two-storey side extensions always need a full application to Birmingham City Council. They are assessed on the gap to the boundary, whether the street's rhythm of spaces between houses survives, and whether the extension is subordinate to the original. Setting the first floor back from the front building line and down from the ridge is what usually makes the difference. This applies to your Jewellery Quarter address specifically.
Overlooking is the most common objection, and it is answerable on the drawings. We position habitable-room windows away from neighbouring gardens, obscure-glaze and fix shut anything on the flank below 1.7 metres, and show the sight lines in section. Where the geometry is tight, a rooflight or a high-level window gives the same daylight without the mutual overlooking that draws objections. This applies to your Jewellery Quarter address specifically. Birmingham City Council is the decision-maker.
Almost certainly. Excavating within 3 metres of a neighbouring structure and building on or up to the boundary both trigger the Party Wall etc. Act 1996, and a two-storey extension usually does both. It is entirely separate from Birmingham City Council's planning decision, so we flag the notice period early and detail the junction on the drawings. This applies to your Jewellery Quarter address specifically.
Yes. Adding a floor changes the load path from roof to foundation, so beams, padstones and foundation depths all need designing and calculating for building control. Planning and building regulations are separate consents, and the structural set is what building control assesses — we prepare both so the approved scheme is the buildable one. This applies to your Jewellery Quarter address specifically. Birmingham City Council is the decision-maker.
We quote each Jewellery Quarter two-storey extension individually, because plot depth, roof form and structural complexity vary house to house, and send a fixed, no-obligation quote within one working day. It covers the drawing pack with free revisions until Birmingham City Council approves. Call 020 7864 7245 to start.
Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.
Same fixed quotes, same fast drawings — wherever your project is.