MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Two storey extension plans in Heybridge East — a two-storey rear addition to a family house
Heybridge East · Two Storey Extension Drawings

Two storey extension plans in Heybridge East

Two-storey extension drawings for Heybridge East homes — bedroom above, living space below, drawn against the 3-metre projection and 7-metre boundary rules and to Maldon District Council's design guidance, delivered in days and revised free until your decision.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Householder planning in Heybridge East — the record

Maldon District Council granted 91% of the householder planning decisions it made in its latest published year — 4 points above the 87% England-wide householder average. Heybridge East contains Heybridge Basin, Heybridge Basin, Heybridge Basin (Addition1) conservation areas (Heybridge Basin designated 1975), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant postwar (1945–1970) housing stock sets the design brief on most streets.

The permitted-development ceilings are fixed: 40m³ of new roof volume for a terraced loft and 50m³ for a semi or detached house under Class B, plus a 3m single-storey rear extension on a terrace or 4m on a detached house under Class A. In conservation areas such as Heybridge Basin, Heybridge Basin and Heybridge Basin (Addition1) those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Heybridge East is determined against an 8-week statutory target.

Heybridge Basin (conservation area designated in 1975), Heybridge Basin (designated conservation area), Heybridge Basin (Addition1) (designated conservation area), Heybridge Basin (Addition2) (designated conservation area), Heybridge Basin (Addition3) (designated conservation area), Heybridge Basin (Addition4) (designated conservation area), Heybridge Basin (Reduction1) (designated conservation area), Heybridge Basin (Reduction2) (designated conservation area), Heybridge Basin (Reduction3) (designated conservation area), Heybridge (civil parish within Heybridge East) and Heybridge Basin (civil parish within Heybridge East) — these are the Heybridge East pockets our drawings cover most. Heritage designations here include Heybridge Basin, Heybridge Basin, Heybridge Basin (Addition1), Heybridge Basin (Addition2), Heybridge Basin (Addition3), Heybridge Basin (Addition4), Heybridge Basin (Reduction1), Heybridge Basin (Reduction2) and Heybridge Basin (Reduction3). Maldon District Council weighs each proposal against the adopted Maldon local plan and Maldon District Council's design guidance for householder work, where the 1,830 homes here are 30% 1983-1992, 26% 1973-1982, 7% 1955-1964, which is what sets the realistic roof and rear-projection options. On roofs the borough is trussed-rafter roofs typical of 1980s building and shallow trussed roofs typical of 1970s building, over 1980s estate houses (30% of 1,830 homes), 1970s and early-1980s houses (26%) and late-1950s and early-1960s houses (7%).

Heybridge East: the local constraints that decide your scheme

Before anything is drawn we check your address against the designations that apply in Heybridge East: Heybridge Basin (conservation area designated in 1975), Heybridge Basin (designated conservation area), Heybridge Basin (Addition1) (designated conservation area), Heybridge Basin (Addition2) (designated conservation area), Heybridge Basin (Addition3) (designated conservation area), Heybridge Basin (Addition4) (designated conservation area), Heybridge Basin (Reduction1) (designated conservation area), Heybridge Basin (Reduction2) (designated conservation area) and Heybridge Basin (Reduction3) (designated conservation area). Inside those boundaries permitted development is curtailed and Maldon District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Heybridge East takes in Heybridge and Heybridge Basin. No Article 4 direction is recorded for Maldon District Council, but Heybridge East's 9 conservation areas still limit permitted development on those streets.

On stock, Heybridge East is 1980s estate houses (30% of 1,830 homes), 1970s and early-1980s houses (26%) and late-1950s and early-1960s houses (7%) — which is why trussed-rafter roofs typical of 1980s building and shallow trussed roofs typical of 1970s building govern what a loft or rear projection can realistically be. Maldon District Council decided 209 householder applications in the latest published year and granted 91%, with 56% issued inside the eight-week target. That decision record, not a national figure, is what we design to.

The full build-period split for Heybridge East runs pre-1900 6% (110 homes), 1900-1918 1% (10 homes), 1919-1929 4% (80 homes), 1930-1939 2% (40 homes), 1945-1954 4% (70 homes), 1955-1964 7% (130 homes), 1965-1972 5% (90 homes), 1973-1982 26% (480 homes), 1983-1992 30% (540 homes), 1993-1999 5% (90 homes) and 2000-2008 5% (90 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Maldon District Council also decides for Heybridge West, Maldon East, Maldon North, Purleigh, Southminster, Tillingham, Tollesbury and Tolleshunt D'Arcy, so a decision in Heybridge East sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

Heybridge East housing stock and council decisions, in figures

Published figures for Heybridge East and Maldon District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureHeybridge East
Dwellings recorded1,830
Built pre-1900110 (6%)
Built 1900-191810 (1%)
Built 1919-192980 (4%)
Built 1930-193940 (2%)
Built 1945-195470 (4%)
Built 1955-1964130 (7%)
Built 1965-197290 (5%)
Built 1973-1982480 (26%)
Built 1983-1992540 (30%)
Built 1993-199990 (5%)
Built 2000-200890 (5%)
Built before 19197%
Built 1919–19397%
Built 1945–200881%
Conservation areas in Heybridge East9 (Heybridge Basin, Heybridge Basin…)
Conservation areas district-wide92
Article 4 directions recorded0
Householder applications decided209
Householder applications granted91%
Decided within 8 weeks56%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Maldon District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

The three tests a Heybridge East two-storey extension has to pass

Adding at first floor changes the question the case officer asks. A single-storey extension is judged mostly on daylight and garden loss; a two-storey extension is judged on overlooking, bulk against the neighbouring roofline, and whether it reads as part of the house or bolted onto it. Heybridge East is largely 1980s estate houses (30% of 1,830 homes), 1970s and early-1980s houses (26%) and late-1950s and early-1960s houses (7%), and trussed-rafter roofs typical of 1980s building and shallow trussed roofs typical of 1970s building set what a matching roof actually means here.

The permitted-development route exists but is narrow: 3 metres of rear projection, a 7-metre stand-off from the rear boundary, eaves and ridge no higher than the original, and side-facing upper windows obscure-glazed and non-opening below 1.7 metres above floor level. Most two-storey schemes fail one of those, usually the 7-metre boundary rule on a shorter garden, and go in as a full application instead. We establish which route applies before designing, because it changes the drawing set.

Heybridge East contains Heybridge Basin, Heybridge Basin, Heybridge Basin (Addition1) conservation areas (Heybridge Basin designated 1975), so materials, fenestration and roof form are assessed against the appraisal. No Article 4 direction is recorded for Maldon District Council, but Heybridge East's 9 conservation areas still limit permitted development on those streets.

Isometric two storey extension drawing for a Heybridge East house

Does a two storey extension need planning permission in Heybridge East?

Some two-storey rear extensions are permitted development. You will need a full application to Maldon District Council if any of these apply:

  • The extension projects more than 3 metres beyond the original rear wall
  • Any part comes within 7 metres of the rear boundary
  • The eaves or ridge would sit higher than the existing house
  • The extension is to the side, or wraps around to the side at first floor
  • Upper-floor side windows are clear-glazed or open below 1.7 metres
  • The property is on designated land such as Heybridge Basin and Heybridge Basin, where two-storey rights are removed

Heybridge East two-storey extension approval rates — live council data

Below is Maldon District Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Maldon District Council granted 91% of its householder applications in the year to 31 March 2026, and Heybridge Basin shapes what is approved here. Two-storey schemes attract more neighbour comment than any other householder work, so the overlooking and daylight case has to be made on the drawings.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

91%householder applications approved in Maldon
87%national average — Maldon is 4 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What two-storey extensions get approved in Heybridge East

Across Heybridge Basin, Heybridge Basin and Heybridge Basin (Addition1), the schemes that succeed set the first floor back from the ground floor, keep the ridge below the original, and treat the flank wall as blank or obscure-glazed. On 1980s estate houses (30% of 1,830 homes), matching the eaves line matters more than matching the brick: an extension that carries the existing eaves through reads as original even in a different material.

The 1,830 homes here are 30% 1983-1992, 26% 1973-1982, 7% 1955-1964, which is what sets the realistic roof and rear-projection options. We draw the 45-degree daylight test from the neighbour's nearest habitable window, show the window positions in section, and set out the steel and foundation implications early — a two-storey extension changes the load path, so the structural design and the planning design have to be developed together rather than in sequence.

Ground floor created by a two storey extension in Heybridge East

Two-storey extensions across Heybridge East

We draw two-storey extensions across Heybridge East. A few of the areas where they come up most often:

Heybridge Basin

Two storey extension drawings for Heybridge Basin — conservation area designated in 1975 — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Heybridge Basin

Two storey extension drawings for Heybridge Basin — designated conservation area — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Heybridge Basin (Addition1)

Two storey extension drawings for Heybridge Basin (Addition1) — designated conservation area — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Heybridge Basin (Addition2)

Two storey extension drawings for Heybridge Basin (Addition2) — designated conservation area — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Heybridge Basin (Addition3)

Two storey extension drawings for Heybridge Basin (Addition3) — designated conservation area — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Heybridge Basin (Addition4)

Two storey extension drawings for Heybridge Basin (Addition4) — designated conservation area — dimensioned against the 3m and 7m limits and drawn to Maldon District Council's guidance.

Which two-storey extensions are permitted development in Heybridge East?

The first-floor limits are tighter than the ground-floor ones. This is how the common cases compare.

SchemePermitted development?Deciding limitWhat Maldon District Council checks
Two-storey rear, 3m projection, 7m+ to boundaryOften yes3m projection / 7m boundaryRoof match, side-window glazing
Two-storey rear, under 7m to boundaryNo — full applicationRear-boundary distanceOverlooking, daylight, garden loss
Two-storey side extensionNo — full applicationSide elevationGap to boundary, street rhythm
Two-storey wraparoundNo — full applicationCombined footprintBulk, massing, neighbour amenity
Any two-storey on designated landNo — full applicationDesignationCharacter and appearance

Limits from the GPDO 2015, Schedule 2, Part 1, Class A — two-storey rear extension conditions.

Four steps to an approved Heybridge East two-storey extension

A fixed process built around how Maldon District Council validates and decides two-storey applications.

  1. 1

    Free approval check

    Send us your Heybridge East postcode and garden depth. We measure the 7-metre boundary rule against your plot, confirm designation status, and score your odds against live Maldon District Council decisions.

  2. 2

    Measured survey

    We measure the original rear wall, eaves and ridge heights, garden depth and every neighbouring window that faces the site — the inputs the daylight and overlooking case is built from.

  3. 3

    Design, drawings & structure

    Chartered designers develop the two-storey addition to your brief with the roof and eaves resolved, and we coordinate the load path so the structural scheme and the planning scheme are the same building.

  4. 4

    Submission & follow-through

    We submit the application, manage validation and case-officer queries, and revise the drawings free until Maldon District Council issues its decision.

Frequently asked questions

Do I need planning permission for a two storey extension in Heybridge East?

Often, but not always. A two-storey rear extension can be permitted development if it projects no more than 3 metres, sits at least 7 metres from the rear boundary, does not exceed the existing eaves and ridge, and has obscure-glazed non-opening side windows below 1.7 metres. In Heybridge East, the 7-metre rule is what most commonly forces a full application to Maldon District Council.

What is the 7 metre rule for two storey extensions in Heybridge East?

No part of a permitted-development two-storey rear extension may come within 7 metres of the boundary opposite the rear wall of the house. It exists to protect the neighbour behind you from being overlooked at first floor. On shorter Heybridge East gardens this is decisive, and we measure it on survey before any design work rather than discovering it at validation. Maldon District Council is the decision-maker.

Can I build a two storey side extension in Heybridge East?

Not under permitted development — two-storey side extensions always need a full application to Maldon District Council. They are assessed on the gap to the boundary, whether the street's rhythm of spaces between houses survives, and whether the extension is subordinate to the original. Setting the first floor back from the front building line and down from the ridge is what usually makes the difference. This applies to your Heybridge East address specifically.

Will a two storey extension in Heybridge East be refused for overlooking?

Overlooking is the most common objection, and it is answerable on the drawings. We position habitable-room windows away from neighbouring gardens, obscure-glaze and fix shut anything on the flank below 1.7 metres, and show the sight lines in section. Where the geometry is tight, a rooflight or a high-level window gives the same daylight without the mutual overlooking that draws objections. This applies to your Heybridge East address specifically. Maldon District Council is the decision-maker.

Do I need a party wall agreement for a two storey extension in Heybridge East?

Almost certainly. Excavating within 3 metres of a neighbouring structure and building on or up to the boundary both trigger the Party Wall etc. Act 1996, and a two-storey extension usually does both. It is entirely separate from Maldon District Council's planning decision, so we flag the notice period early and detail the junction on the drawings. This applies to your Heybridge East address specifically.

Does a two storey extension need structural calculations in Heybridge East?

Yes. Adding a floor changes the load path from roof to foundation, so beams, padstones and foundation depths all need designing and calculating for building control. Planning and building regulations are separate consents, and the structural set is what building control assesses — we prepare both so the approved scheme is the buildable one. This applies to your Heybridge East address specifically. Maldon District Council is the decision-maker.

How much do two storey extension plans in Heybridge East cost?

We quote each Heybridge East two-storey extension individually, because plot depth, roof form and structural complexity vary house to house, and send a fixed, no-obligation quote within one working day. It covers the drawing pack with free revisions until Maldon District Council approves. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Two storey extension plans across Maldon

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Heybridge East