MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Structural drawings and calculations in Hotham — a steel beam schedule and load-path detail signed by an engineer
Hotham · Structural Engineer's Drawings & Calculations

Structural drawings and calculations in Hotham

Engineer's calculations for a Hotham project — steel beams sized, padstones and load paths worked out and a signed calculations package your builder and Arun District Council's building control can build from, delivered in days and revised free until it is approved.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Hotham planning decisions and design rules

Arun District Council granted 94% of the householder planning decisions it made in its latest published year — 7 points above the 87% England-wide householder average. Hotham contains the Bognor Regis (Upper Bognor Road and Mead Lane) conservation area (Bognor Regis (Upper Bognor Road and Mead Lane) designated 1993), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901) and Edwardian (1901–1910) housing stock sets the design brief on most streets.

Before permission is required, Class B allows 40m³ of added loft volume on a terrace and 50m³ on a semi or detached house, and Class A allows a 3m single-storey rear extension on a terrace or 4m on a detached house. In conservation areas such as Bognor Regis (Upper Bognor Road and Mead Lane) those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Hotham is determined against an 8-week statutory target.

Bognor Regis (Upper Bognor Road and Mead Lane) (conservation area designated in 1993) and Bognor Regis (civil parish within Hotham) — these are the Hotham pockets our drawings cover most. Heritage designations here include Bognor Regis (Upper Bognor Road and Mead Lane). Arun District Council weighs each proposal against Arun District Council's development plan and the design policies it applies to householder applications, where the 3,080 homes here are 17% 1983-1992, 14% pre-1900, 14% 1900-1918, which is what sets the realistic roof and rear-projection options. On roofs the borough is trussed-rafter roofs typical of 1980s building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building, over 1980s estate houses (17% of 3,080 homes), Victorian and earlier houses (14%) and Edwardian houses (14%).

Why a Hotham scheme is judged on Hotham terms

What is permitted in Hotham turns on designation first, so that is where we start: Bognor Regis (Upper Bognor Road and Mead Lane) (conservation area designated in 1993). Inside those boundaries permitted development is curtailed and Arun District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Hotham takes in Bognor Regis. No Article 4 direction is recorded for Arun District Council, but Hotham's 1 conservation area still limit permitted development on those streets.

On stock, Hotham is 1980s estate houses (17% of 3,080 homes), Victorian and earlier houses (14%) and Edwardian houses (14%) — which is why trussed-rafter roofs typical of 1980s building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building govern what a loft or rear projection can realistically be. Arun District Council decided 453 householder applications in the latest published year and granted 94%, with 99% issued inside the eight-week target. We draw to that record rather than to a national average.

The full build-period split for Hotham runs pre-1900 14% (440 homes), 1900-1918 14% (430 homes), 1919-1929 3% (90 homes), 1930-1939 6% (200 homes), 1945-1954 3% (80 homes), 1955-1964 7% (230 homes), 1965-1972 9% (270 homes), 1973-1982 6% (170 homes), 1983-1992 17% (520 homes), 1993-1999 7% (230 homes) and 2000-2008 7% (220 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Arun District Council also decides for Angmering & Findon, Arundel & Walberton, Barnham, Beach, Bersted, East Preston, Marine and Orchard, so a decision in Hotham sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

Hotham by the published data

Published figures for Hotham and Arun District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureHotham
Dwellings recorded3,080
Built pre-1900440 (14%)
Built 1900-1918430 (14%)
Built 1919-192990 (3%)
Built 1930-1939200 (6%)
Built 1945-195480 (3%)
Built 1955-1964230 (7%)
Built 1965-1972270 (9%)
Built 1973-1982170 (6%)
Built 1983-1992520 (17%)
Built 1993-1999230 (7%)
Built 2000-2008220 (7%)
Built before 191928%
Built 1919–19399%
Built 1945–200856%
Conservation areas in Hotham1 (Bognor Regis (Upper Bognor Road and Mead Lane))
Conservation areas district-wide23
Article 4 directions recorded0
Householder applications decided453
Householder applications granted94%
Decided within 8 weeks99%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Arun District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What a structural package covers on a Hotham project

The moment a wall comes out or a new floor goes in, something has to carry the load that wall or floor was holding — and building control will not accept "it looks strong enough". The engineer traces the load path: the weight of the roof, floors and walls above is gathered into a beam, the beam is sized in steel or timber to carry it within safe deflection, and that load is passed through padstones into the masonry and down to the ground. On Hotham's 1980s estate houses (17% of 3,080 homes), Victorian and earlier houses (14%) and Edwardian houses (14%), the spans and loads differ house to house, so every calculation is specific to the property.

The deliverable is two things that work together: the calculations, which show the maths an approved inspector can check, and the structural drawings, which turn that maths into something a builder can order and fit — a beam schedule with sizes and lengths, bearing and padstone details, and connection notes. Hotham contains the Bognor Regis (Upper Bognor Road and Mead Lane) conservation area (Bognor Regis (Upper Bognor Road and Mead Lane) designated 1993), so materials, fenestration and roof form are assessed against the appraisal, and the calculations are drawn to sit alongside the architectural set rather than contradict it. Everything is signed by a chartered or incorporated engineer carrying professional indemnity insurance.

Older Hotham stock — the kind found across Bognor Regis (Upper Bognor Road and Mead Lane) — often hides the real structural question: shallow Victorian foundations, timber that has been notched by past work, or a wall that turns out to be load-bearing when the drawings assumed otherwise. No Article 4 direction is recorded for Arun District Council, but Hotham's 1 conservation area still limit permitted development on those streets. A survey-based calculation catches this before the wall is opened, not after.

Structural calculations package for a Hotham building project

When do I need structural calculations in Hotham?

Building control needs an engineer's calculations whenever you change how the building carries load. On a typical Hotham project that means any of these:

  • Removing or forming an opening in a load-bearing wall of a Hotham home — a knock-through, a wide opening or a chimney breast
  • Converting a loft on the borough's 1980s estate houses (17% of 3,080 homes), where the existing ceiling joists cannot carry a floor and new steels are needed
  • Any Hotham extension, where the new opening into the house and the extension's own roof and floor need beams
  • Inserting a steel beam, lintel or column, or replacing rotten or overloaded structure in an older Hotham property
  • Underpinning, a basement, or any change to a Hotham property's foundations
  • Where Arun District Council's building control, your builder or a party wall surveyor specifically asks for a signed calculation

Hotham building activity — live from council data

Below is Arun District Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Arun District Council granted 94% of its householder applications in the year to 31 March 2026, and Bognor Regis (Upper Bognor Road and Mead Lane) shapes what is approved here. Structural calculations sit behind building control rather than planning, but the same wave of loft, extension and knock-through work that drives these decisions is exactly what needs an engineer's package.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

94%householder applications approved in Arun
87%national average — Arun is 7 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

How structural calculations get approved in Hotham

Building control approves structural work by checking the numbers, not by looking at the finished steel. Arun District Council's inspector, or an approved inspector acting for you, reads the calculations to confirm the beam is deep enough for its span, that deflection stays within limits so ceilings do not crack, that the bearing length and padstones spread the point load into masonry that can take it, and that the load has somewhere to go all the way to the ground. Across Bognor Regis (Upper Bognor Road and Mead Lane) and Bognor Regis, the recurring issue is a beam sized off a rule of thumb that the actual span will not support.

The 3,080 homes here are 17% 1983-1992, 14% pre-1900, 14% 1900-1918, which is what sets the realistic roof and rear-projection options. We issue calculations detailed enough to be signed off without a query, coordinate them with the architect's drawings so nothing conflicts on site, and stay available to revise if the builder finds the Hotham property is not quite as the survey assumed — free, until the work is approved.

Beam schedule and load calculations for a Hotham project

Structural work across Hotham

We calculate beams, openings and floors on the period and modern stock across the borough. A few of the Hotham neighbourhoods where structural packages come up most often:

Bognor Regis (Upper Bognor Road and Mead Lane)

Structural calculations for Bognor Regis (Upper Bognor Road and Mead Lane)'s conservation area designated in 1993 — beams sized, load paths traced and signed for Arun District Council's building control.

Bognor Regis

Structural calculations for Bognor Regis's civil parish within Hotham — beams sized, load paths traced and signed for Arun District Council's building control.

What structure does each Hotham project need?

Different jobs load the building differently, so each needs its own calculation. This is what the common Hotham projects typically require.

ProjectTypical structureWhat the calculation provesSigned off by
Wall knock-throughSteel beam on padstonesSpan, deflection and bearingBuilding control
Loft conversionNew floor beams and ridge/purlin steelsFloor loading and roof supportBuilding control
Rear or side extensionOpening beam plus extension roof and floorCombined loads and foundationsBuilding control
Basement or underpinningRetaining and foundation designGround and adjacent-building loadsBuilding control & party wall

On older Hotham stock around Bognor Regis (Upper Bognor Road and Mead Lane), shallow foundations and altered structure often mean the calculation drives the design rather than following it.

Four steps to a signed Hotham structural package

A fixed process built around building control rather than planning — most calculation packages are ready within five days of the architectural drawings.

  1. 1

    Free feasibility check

    Send us your Hotham postcode and the architect's drawings or a sketch. We confirm what structure the project needs, flag any load-bearing wall or foundation question, and tell you exactly what the calculation package will cover.

  2. 2

    Structural survey

    Where the loads are not obvious — an unknown wall, an old alteration, a deep span — we survey the property so the beam is sized on what is really there, not an assumption.

  3. 3

    Calculations & structural drawings

    A chartered or incorporated engineer sizes the steel, works the padstones and load path, and issues the signed calculations and a beam schedule coordinated with your Hotham architectural set.

  4. 4

    Approval & site support

    We submit the calculations to Arun District Council's building control or your approved inspector, answer queries, and revise free if the build uncovers something the survey could not see.

Frequently asked questions

When do I need structural calculations in Hotham?

Whenever you change how the building carries weight — removing or opening a load-bearing wall, converting a loft, building an extension, or inserting a beam or column. Arun District Council's building control needs an engineer's calculation to approve any of these before the steel goes in. A Hotham project that only redecorates or moves a non-structural partition does not, but almost anything that opens the structure does.

Are structural calculations part of planning permission in Hotham?

No — they are a separate, later step. Planning permission decides whether Arun District Council will allow the change; structural calculations prove the change is safe to build and are submitted to building control, not to the planners. Many Hotham projects that need no planning permission at all — an internal knock-through, a permitted-development loft — still need a full engineer's calculation before work can lawfully start.

Who signs the structural calculations for a Hotham project?

A chartered or incorporated structural engineer, carrying professional indemnity insurance, who takes responsibility for the numbers. Arun District Council's building control, or an approved inspector acting on your behalf, then checks and signs them off. Your builder cannot self-certify a steel beam, and an unsigned calculation will not be accepted — the engineer's signature and insurance are what make the package one building control will approve. This applies to your Hotham address specifically.

Can you size the steel beam for a knock-through in Hotham?

Yes — a beam over a removed wall is the most common calculation we do. We work out the load the wall was carrying, size a steel or timber beam to span the opening within safe deflection, and detail the padstones that spread its weight into the masonry each side. The result is a beam schedule your Hotham builder can order and Arun District Council's inspector can approve, with the load traced all the way to the foundations.

Do I need a structural survey before the calculations in Hotham?

Sometimes. Where the loads are clear from the drawings we can calculate directly, but Hotham's older stock often hides surprises — a wall that turns out to be load-bearing, notched or altered joists, or shallow foundations near Bognor Regis (Upper Bognor Road and Mead Lane). In those cases a short structural survey means the beam is sized on what is really there, which avoids a redesign once the builder opens the wall. Arun District Council is the decision-maker.

How much do structural drawings and calculations in Hotham cost?

We price each Hotham package on the number of beams and the complexity — a single knock-through is straightforward, a whole-house loft-and-extension scheme has several elements — and send a fixed, no-obligation quote within one working day. It covers the calculations, the beam schedule and free revisions until Arun District Council's building control approves. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Structural drawings & calculations across Arun

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Hotham