MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Planning application drawings for a Marchwood & Eling home — scaled plans and elevations ready for submission
Marchwood & Eling · Planning Application Drawings & Submission

Planning application drawings in Marchwood & Eling

The full drawing set for a Marchwood & Eling application — location and block plans, existing and proposed floor plans, elevations and sections, drawn to New Forest District Council's validation checklist so the pack is accepted first time, delivered in days and revised free until your decision, with a free approval-odds check first.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Marchwood & Eling householder planning by the numbers

New Forest District Council granted 96% of the householder planning decisions it made in its latest published year — 9 points above the 87% England-wide householder average. Marchwood & Eling contains Eling, Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) conservation areas (Eling designated 2000), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its mixed housing stock sets the design brief street by street.

Under Class B, a rear dormer stays permitted development up to 40m³ of added roof volume on a terrace or 50m³ on a semi-detached or detached house, while Class A allows a single-storey rear extension of 3m beyond the original rear wall on a terrace and 4m on a detached house before a full application is needed. Marchwood & Eling carries at least one Article 4 direction, and conservation areas including Eling and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Marchwood & Eling is determined against an 8-week statutory target.

Eling (conservation area designated in 2000), Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) (conservation area designated in 1999), Marchwood (civil parish within Marchwood & Eling) and Totton and Eling (civil parish within Marchwood & Eling) — these are the Marchwood & Eling pockets our drawings cover most. Heritage designations here include Eling and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)). New Forest District Council weighs each proposal against New Forest District Council's development plan and the design policies it applies to householder applications, where the 3,150 homes here are 23% 1973-1982, 19% 1983-1992, 10% 2000-2008, which is what sets the realistic roof and rear-projection options. On roofs the borough is shallow trussed roofs typical of 1970s building and trussed-rafter roofs typical of 1980s building, over 1970s and early-1980s houses (23% of 3,150 homes), 1980s estate houses (19%) and 2000s houses and apartments (10%).

What actually constrains a project in Marchwood & Eling

Marchwood & Eling's designated heritage is specific, and it is the first thing we check against your address: Eling (conservation area designated in 2000) and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) (conservation area designated in 1999). Inside those boundaries permitted development is curtailed and New Forest District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Marchwood & Eling takes in Marchwood and Totton and Eling. New Forest District Council has 9 recorded Article 4 directions, removing permitted development for painting the exterior and gates, walls and fences — check the address before assuming PD applies in Marchwood & Eling.

On stock, Marchwood & Eling is 1970s and early-1980s houses (23% of 3,150 homes), 1980s estate houses (19%) and 2000s houses and apartments (10%) — which is why shallow trussed roofs typical of 1970s building and trussed-rafter roofs typical of 1980s building govern what a loft or rear projection can realistically be. New Forest District Council decided 531 householder applications in the latest published year and granted 96%, with 80% issued inside the eight-week target. Those are the numbers our drawings are prepared against.

The full build-period split for Marchwood & Eling runs pre-1900 3% (80 homes), 1900-1918 3% (80 homes), 1919-1929 8% (260 homes), 1930-1939 5% (150 homes), 1945-1954 5% (150 homes), 1955-1964 10% (320 homes), 1965-1972 4% (130 homes), 1973-1982 23% (730 homes), 1983-1992 19% (590 homes), 1993-1999 8% (250 homes) and 2000-2008 10% (330 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

New Forest District Council also decides for Hythe Central, Lymington, Milford & Hordle, Milton and Totton North, so a decision in Marchwood & Eling sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

The Article 4 directions recorded for this council include ARTICLE 4 DIRECTION 97/1, ARTICLE 4 DIRECTION 97/2, ARTICLE 4 DIRECTION 97/5 and ARTICLE 4 DIRECTION 97/6. Each removes a specific permitted-development right inside its own boundary, which is why the check is done on the address rather than on the town.

Marchwood & Eling in numbers — housing stock and planning decisions

Published figures for Marchwood & Eling and New Forest District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureMarchwood & Eling
Dwellings recorded3,150
Built pre-190080 (3%)
Built 1900-191880 (3%)
Built 1919-1929260 (8%)
Built 1930-1939150 (5%)
Built 1945-1954150 (5%)
Built 1955-1964320 (10%)
Built 1965-1972130 (4%)
Built 1973-1982730 (23%)
Built 1983-1992590 (19%)
Built 1993-1999250 (8%)
Built 2000-2008330 (10%)
Built before 19195%
Built 1919–193913%
Built 1945–200879%
Conservation areas in Marchwood & Eling2 (Eling, Royal Naval Armaments Depot (Marchwood (R.N.A.D.)))
Conservation areas district-wide23
Article 4 directions recorded9
Householder applications decided531
Householder applications granted96%
Decided within 8 weeks80%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are New Forest District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What goes in a Marchwood & Eling planning application

Whatever you are building, New Forest District Council decides it from the same core set. A location plan at 1:1250 fixes the site on the map with the red-line boundary; a block plan at 1:500 shows the property in its plot; then existing and proposed floor plans and elevations at 1:100 or 1:50 show the house as it is and as it will be. Larger schemes add a section and, where policy requires, a design and access statement. Miss one and the application is returned invalid before an officer has looked at it.

The drawings are also the argument. New Forest District Council assesses each proposal against New Forest District Council's development plan and the design policies it applies to householder applications, and the elevations are where the case is won or lost — ridge and eaves heights, window positions, materials and how the change reads from the street. On Marchwood & Eling's stock, which runs to 1970s and early-1980s houses (23% of 3,150 homes), 1980s estate houses (19%) and 2000s houses and apartments (10%), the same scheme is drawn differently to answer the concerns officers raise here. Marchwood & Eling contains Eling, Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) conservation areas (Eling designated 2000), so materials, fenestration and roof form are assessed against the appraisal, so the pack is built to pre-empt exactly that.

Where the property sits in a conservation area — Eling and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) among Marchwood & Eling's — validation is stricter still, often demanding heritage detail and sometimes additional plans. New Forest District Council has 9 recorded Article 4 directions, removing permitted development for painting the exterior and gates, walls and fences — check the address before assuming PD applies in Marchwood & Eling. We confirm the designation before drawing so the pack meets the higher bar first time.

Planning drawing package prepared for a Marchwood & Eling application

What drawings do I need for a planning application in Marchwood & Eling?

New Forest District Council validates against a published checklist before it assesses anything. A typical householder application needs each of these, correctly scaled and labelled:

  • A location plan at 1:1250 with the application site edged in red and any other land you control edged in blue
  • A block or site plan at 1:500 showing the property, its boundaries and the position of the works
  • Existing floor plans and elevations at 1:100 or 1:50, showing the house before any change
  • Proposed floor plans and elevations at the same scale, with a scale bar and north point
  • A design and access statement where New Forest District Council requires one — larger schemes and most work in a conservation area
  • Confirmation of any Article 4 direction on the street — Marchwood & Eling operates several, which can change what is needed

Marchwood & Eling planning decisions — live from council data

Below is New Forest District Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. New Forest District Council granted 96% of its householder applications in the year to 31 March 2026, and Eling shapes what is approved here. A complete, correctly scaled pack that answers those concerns on the elevations is validated faster and refused less often than one that leaves them for the officer to raise.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

96%householder applications approved in New Forest
87%national average — New Forest is 9 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

Why Marchwood & Eling applications get returned or refused

Two different things sink an application, and they happen at two different stages. First is validation: a missing block plan, an unscaled elevation, no red line, no north point — New Forest District Council returns the whole submission and the clock never starts. Getting the pack right at this stage is purely mechanical, and it is where a lot of self-submitted Marchwood & Eling applications lose weeks. We draw to the checklist so this never happens.

Second is the planning judgement itself, once the pack is valid. The 3,150 homes here are 23% 1973-1982, 19% 1983-1992, 10% 2000-2008, which is what sets the realistic roof and rear-projection options. Across Eling, Royal Naval Armaments Depot (Marchwood (R.N.A.D.)) and Marchwood the recurring refusals are about scale, overlooking and how the proposal sits against its neighbours — all of which are settled on the drawings. We draw the scheme to answer them before submission rather than after a refusal.

Scaled architect drawings for a Marchwood & Eling planning application

Applications we draw across Marchwood & Eling

The application pack is the same discipline whatever the project. A few of the Marchwood & Eling neighbourhoods and property types we prepare drawings for most often:

Eling

Planning drawings for Eling's conservation area designated in 2000 — scaled, validation-ready and drawn to New Forest District Council's guidance.

Royal Naval Armaments Depot (Marchwood (R.N.A.D.))

Planning drawings for Royal Naval Armaments Depot (Marchwood (R.N.A.D.))'s conservation area designated in 1999 — scaled, validation-ready and drawn to New Forest District Council's guidance.

Marchwood

Planning drawings for Marchwood's civil parish within Marchwood & Eling — scaled, validation-ready and drawn to New Forest District Council's guidance.

Totton and Eling

Planning drawings for Totton and Eling's civil parish within Marchwood & Eling — scaled, validation-ready and drawn to New Forest District Council's guidance.

Which application do I make in Marchwood & Eling?

The route decides what New Forest District Council needs and how long it takes. This is how the common Marchwood & Eling routes compare.

RouteWhen it appliesCore drawingsTypical decision
Householder applicationExtensions and alterations to a single houseLocation, block, existing & proposed plans and elevationsAbout 8 weeks
Full applicationFlats, new units, changes of useAs householder plus site plan and often a section8–13 weeks
Lawful development certificateConfirming a scheme is permitted developmentExisting & proposed plans and elevations to prove PD limitsAbout 8 weeks
Prior approvalLarger single-storey rear extensionsPlans and elevations plus neighbour notificationAbout 6 weeks

In a conservation area such as Eling and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)), householder permitted-development rights are often restricted, so a full application and heritage detail may be required.

Four steps to a validated Marchwood & Eling application

A fixed process built around how New Forest District Council validates and decides — most drawing sets are submission-ready within seven days of survey.

  1. 1

    Free approval check

    Send us your Marchwood & Eling postcode and what you want to build. We confirm your conservation and Article 4 status, tell you which application route applies, and score your odds against live New Forest District Council decisions.

  2. 2

    Measured survey

    We measure the property and plot so the existing plans and elevations are accurate to the millimetre — the base every proposed drawing and every officer judgement is built on.

  3. 3

    Drawing set & statement

    Chartered designers produce the full validation pack — location and block plans, existing and proposed plans, elevations, any section and a design and access statement — drawn to New Forest District Council's checklist.

  4. 4

    Submission & follow-through

    We lodge the application on the Planning Portal, manage validation and case-officer queries, and revise the drawings free until New Forest District Council issues its decision.

Frequently asked questions

What drawings do I need for a planning application in Marchwood & Eling?

New Forest District Council validates a householder application against a set list: a location plan at 1:1250 with a red-line boundary, a block plan at 1:500, and existing and proposed floor plans and elevations at 1:100 or 1:50, each with a scale bar and north point. Larger schemes and most conservation-area work also need a design and access statement. If any of these is missing or unscaled the application is returned invalid before it is assessed. This applies to your Marchwood & Eling address specifically.

Why do Marchwood & Eling planning applications get returned as invalid?

Almost always because the drawing pack is incomplete or wrongly scaled — a missing block plan, an elevation with no scale, no red line on the location plan, no north point. New Forest District Council checks the pack against its validation list before an officer ever assesses the scheme, so these purely technical gaps cost weeks. Drawing to the checklist from the outset is the simplest way to avoid a return. This applies to your Marchwood & Eling address specifically.

Can you submit the Marchwood & Eling planning application for me?

Yes. We prepare the full drawing set, lodge it on the Planning Portal on your behalf, pay the New Forest District Council fee where you prefer us to, and then manage validation and case-officer questions through to the decision. You get the reference number and updates without dealing with the portal or the council yourself. This applies to your Marchwood & Eling address specifically.

How long does New Forest District Council take to decide an application?

A householder application is a statutory eight weeks from validation, and a full application eight to thirteen weeks depending on scale. The date that matters is validation, not submission — an invalid pack never starts the clock. Because we draw to New Forest District Council's checklist the application validates quickly, so the statutory period begins without the delay a returned pack causes. This applies to your Marchwood & Eling address specifically.

Do I need planning drawings if my project is permitted development in Marchwood & Eling?

You do not strictly need a planning application, but scaled existing and proposed drawings are still worth having: a lawful development certificate from New Forest District Council proves the scheme is permitted development, which lenders and buyers increasingly ask for, and your builder needs the drawings to price and build. In a conservation area such as Eling and Royal Naval Armaments Depot (Marchwood (R.N.A.D.)), permitted-development rights are often removed, so a full application may be needed after all — we confirm which before you commit. This applies to your Marchwood & Eling address specifically.

How much do planning application drawings in Marchwood & Eling cost?

We price each Marchwood & Eling job individually — the scope of the survey and the size of the drawing set vary from a simple rear extension to a whole-house scheme — and send a fixed, no-obligation quote within one working day. It covers the full validation pack with free revisions until New Forest District Council decides. The New Forest District Council application fee is separate and paid to the council. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Planning application drawings across New Forest

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Marchwood & Eling