Refused by Harrow Council? We read the decision notice, tell you honestly whether to appeal or resubmit, and prepare the drawings and statement that answer each reason for refusal on the Planning Inspectorate's terms.
Harrow Council granted 83% of the householder planning decisions it made in its latest published year — 4 points below the 87% England-wide householder average. Hip-to-gable conversions dominate because so much of the stock is hipped 1930s semis — roof bulk and the pair's balance are the tests, which is where a policy-literate drawing pack earns its keep. Its dominant Edwardian (1901–1910) and interwar (1918–1939) housing stock sets the design brief on most streets.
The permitted-development ceilings are fixed: 40m³ of new roof volume for a terraced loft and 50m³ for a semi or detached house under Class B, plus a 3m single-storey rear extension on a terrace or 4m on a detached house under Class A. Harrow carries at least one Article 4 direction, and conservation areas including Harrow on the Hill, Pinner High Street and Pinner Village remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Harrow is determined against an 8-week statutory target.
Harrow on the Hill (historic hilltop conservation area), Pinner (the medieval High Street and Metroland semis), Stanmore (detached and semi-detached interwar houses), Wealdstone (Edwardian terraces near the town centre), Rayners Lane (classic Metroland semi-detached estates) and Kenton (1930s hipped-roof semis) — these are the Harrow pockets our drawings cover most. Heritage designations here include Harrow on the Hill, Pinner High Street, Pinner Village, Roxeth and Harrow Weald. Harrow Council weighs each proposal against Harrow Local Plan and the Residential Design Guide SPD, where the borough resists loss of the gaps between semis that define Metroland streets. On roofs the borough is hipped roofs on the 1930s semis and steeper gabled roofs in Pinner village, over interwar Metroland semi-detached houses, Edwardian terraces around the stations and detached homes on the hill.
Two routes exist and they suit different refusals. A free-go resubmission — a fresh application within twelve months of the refusal, on the same site and in the same description — costs no fee and lets you change the scheme. An appeal keeps the scheme as refused and asks an Inspector to disagree with Harrow Council. Where the refusal reasons are about design detail that can be fixed, resubmission is usually faster; where they are about principle, an appeal is the only route that resolves it.
The decision notice is the brief. Each numbered reason cites policy and states a harm, and the appeal has to meet each one with evidence — sections showing daylight, elevations showing the relationship to neighbours, a site plan proving separation distances. Assertion loses appeals. Harrow is largely interwar Metroland semi-detached houses, Edwardian terraces around the stations and detached homes on the hill, and hipped roofs on the 1930s semis and steeper gabled roofs in Pinner village shape what the Inspector will accept as characteristic here.
Hip-to-gable conversions dominate because so much of the stock is hipped 1930s semis — roof bulk and the pair's balance are the tests, which frequently appears in refusal reasons and therefore has to be addressed head-on. Harrow on the Hill and the Pinner conservation areas carry tight controls, and several streets have Article 4 directions removing permitted-development rights.

We give an honest read of the decision notice first. An appeal is usually the right route where:
We take each numbered reason for refusal and answer it with a drawing or an evidenced statement — not with a restatement of the original application. That is the difference between an appeal that reads as a complaint and one that reads as a case.
Below is Harrow Council's real decision record, drawn from official planning statistics and refreshed as new data lands. Harrow grants a fair share of householder applications, with hip-to-gable roof bulk on Metroland semis and the spacing between paired houses the recurring considerations. Knowing what this authority actually refuses, and why, is the starting point for deciding whether to appeal or to redesign.
Source: MHCLG planning application statistics (householder decisions, rolling year). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Across Harrow on the Hill, Pinner and Stanmore, the appeals that succeed are narrow and evidenced. They show the daylight test drawn rather than described, they cite the Inspector's own decisions on comparable sites, and they concede the points that are not worth arguing so the case concentrates on the ones that are. An appeal that disputes every reason equally reads as unfocused and usually fails on the strongest one.
The borough resists loss of the gaps between semis that define Metroland streets. Most householder appeals are decided by written representations, with the Inspector visiting the site unaccompanied. That makes the drawings the primary evidence: what is not on the page is not in front of the Inspector. We prepare the set on that basis, and where the honest answer is that the refusal was sound, we say so and redesign instead.

We prepare appeal drawings and statements across Harrow. A few of the areas where refusals come up most often:
Appeal drawings for Harrow on the Hill — historic hilltop conservation area — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Appeal drawings for Pinner — the medieval High Street and Metroland semis — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Appeal drawings for Stanmore — detached and semi-detached interwar houses — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Appeal drawings for Wealdstone — Edwardian terraces near the town centre — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Appeal drawings for Rayners Lane — classic Metroland semi-detached estates — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Appeal drawings for Kenton — 1930s hipped-roof semis — answering Harrow Council's reasons for refusal with evidence rather than assertion.
Three responses to a refusal, with different costs, timescales and prospects.
| Route | Deadline | Typical timescale | Best where |
|---|---|---|---|
| Householder appeal | 12 weeks from the decision | About 8–12 weeks | The refusal turns on principle or a disputed harm |
| Section 78 appeal (other) | 6 months from the decision | Several months | Larger schemes, change of use, new dwellings |
| Free-go resubmission | 12 months from the decision | 8 weeks | The reasons are fixable design detail |
| Fresh application, redesigned | No deadline | 8 weeks | The scheme needs a different approach entirely |
Deadlines from the Town and Country Planning Act 1990, section 78, and the Planning Inspectorate's published appeal procedures.
A process built around the decision notice, because that is what the Inspector reads first.
Send us the decision notice and the refused drawings. We tell you honestly whether the reasons are appealable, whether a resubmission is faster, and how Harrow Council has fared on comparable appeals.
We gather the material that answers each reason — daylight geometry, separation distances, decided appeals on similar sites, and the relevant policies read in full rather than in extract.
We prepare the drawings the Inspector needs and a statement of case that takes each numbered reason in turn, conceding what should be conceded and evidencing the rest.
We lodge the appeal inside the deadline, respond to the council's statement, and revise free until the Inspector issues a decision.
Twelve weeks from the date on the decision notice for a householder appeal, and six months for most other section 78 appeals. The deadline is strict and the Planning Inspectorate will not accept a late appeal, so the first thing we do on a Harrow refusal is check the date and work backwards from it. Harrow Council is the decision-maker.
It depends what the reasons say. If they identify design detail you are willing to change, a free-go resubmission within twelve months costs no application fee and usually resolves faster. If they refuse the principle — that an extension of this type does not belong here at all — only an appeal settles it, because a resubmission would meet the same objection. This applies to your Harrow address specifically. Harrow Council is the decision-maker.
Nationally, a minority of householder appeals succeed, and the ones that do tend to be narrow, evidenced and focused on a single disputed harm. We look at how Harrow Council's refusals have fared at appeal and at comparable decisions nearby before advising, and we will tell you when we think the refusal was sound — an appeal with no prospect costs months.
The scheme itself cannot change on appeal — the Inspector determines the application as refused. What usually needs preparing is evidence: sections showing daylight, elevations showing the relationship to neighbours, and context drawings showing what already exists on the street. Those explain why the refused scheme causes no harm, without altering it. This applies to your Harrow address specifically. Harrow Council is the decision-maker.
In most written-representation appeals, yes — usually unaccompanied, viewing the site from public land and neighbouring property where access is arranged. That is why the drawings matter so much: the Inspector sees the site once, briefly, and everything else comes from the paperwork you submitted. This applies to your Harrow address specifically. Harrow Council is the decision-maker.
Only where the council has behaved unreasonably — refusing against its own officer's clear recommendation without evidence, or failing to substantiate a reason for refusal. Costs awards are the exception rather than the norm, and they are decided separately from the appeal itself. Where the grounds genuinely exist, we make the application alongside the appeal. This applies to your Harrow address specifically. Harrow Council is the decision-maker.
We quote each Harrow appeal individually after reading the decision notice, because the work depends entirely on how many reasons are in play and what evidence they demand, and send a fixed, no-obligation quote within one working day. The refusal review itself is free. Call 020 7864 7245 to start. Harrow Council is the decision-maker.