A clear breakdown of what Londoners are paying to convert a loft in 2026 — by conversion type, borough factors, and the drawings that keep a project on budget.
Four factors dominate the final price: the type of conversion (rooflight, dormer, hip-to-gable or mansard), the roof structure you start with (a hipped roof needs more work than a gable-ended one), the scope of internal work (new staircase, bathroom, structural steels), and labour rates, which are consistently higher in Inner London boroughs than in Outer London and the wider South East.
Party wall considerations add cost and time where a terraced or semi-detached property shares a party wall — most London loft conversions on attached houses trigger the Party Wall etc. Act 1996, requiring formal notices and, often, a party wall award before work starts.
Building Regulations compliance is non-negotiable and adds cost regardless of conversion type: structural calculations for new steels, fire safety upgrades (protected escape routes, fire doors, interlinked alarms), thermal insulation to current Part L standards, and adequate head height and staircase provision under Part K.

Build costs below are typical market ranges for a standard London terraced or semi-detached house, excluding professional fees and finishes; detached and period properties can push costs higher due to structural complexity.
| Conversion type | Typical London build cost (2026) | Planning route | Best suited to |
|---|---|---|---|
| Rooflight (Velux) conversion | £45,000–£65,000 | Usually permitted development | Roofs with sufficient existing head height |
| Dormer conversion | £55,000–£85,000 | Often permitted development, subject to volume limits | Terraced and semi-detached houses needing extra headroom and floor space |
| Hip-to-gable conversion | £65,000–£95,000 | Permitted development or planning, depending on scheme | Detached and semi-detached houses with a hipped roof |
| Mansard conversion | £85,000–£130,000+ | Almost always requires planning permission | Terraces, especially in conservation areas, wanting maximum usable space |
Ranges are indicative UK market build costs for London in 2026 and exclude drawings, structural engineering, party wall and building control fees.
Many London loft conversions proceed under permitted development rights, avoiding a full planning application — but hip-to-gable, mansard and any conversion in a conservation area or on a flat, listed building, or Article 4 direction property will usually need one. Approval rates vary significantly by local authority: analysis of MHCLG householder planning data shows Charnwood approved 88% of householder planning applications between 1 April 2025 and 31 March 2026 (GetPlanningPermission analysis of MHCLG data), underlining how a well-prepared, policy-compliant application materially improves the odds of a first-time approval anywhere in England.
Under the General Permitted Development Order (GPDO) Part 1, Class B, most houses can add roof space up to 40 cubic metres (terraced) or 50 cubic metres (detached and semi-detached) without planning permission, provided the extension doesn't extend beyond the plane of the existing roof slope at the front, materials are similar in appearance, and no verandas, balconies or raised platforms are included.
Permitted development rights do not apply to flats, maisonettes, or houses in Article 4 areas, and are commonly restricted in conservation areas — a mansard, for example, almost always needs a full householder planning application because it alters the entire roof form.
Even where planning permission isn't required, a Certificate of Lawful Development is strongly advisable: it provides written confirmation from the council that the works are lawful, which protects you at resale and satisfies mortgage lenders and conveyancing solicitors.
Accurate drawings are the foundation of a reliable quote — without them, builders price on assumptions, and costs drift. A typical loft conversion drawing package includes:
The right type depends on your roof's existing structure and how much space you need — not just budget.
No structural roof alteration; skylights are set into the existing slope. Cheapest and quickest option, but limited by existing head height — often unsuitable for lower Victorian roof pitches.
A box-shaped structure projects from the rear roof slope, adding both headroom and floor space. The most common London loft conversion, balancing cost against usable space gained.
Converts a sloped hipped roof end into a vertical gable wall, significantly increasing internal volume. Popular on semi-detached and detached houses in Outer London boroughs.
Replaces the rear roof slope with a near-vertical wall at a steep angle, maximising space. The most expensive and most likely to need full planning permission, especially in conservation areas.
A well-run loft conversion follows a predictable sequence, with drawings and approvals front-loaded to protect the budget.
An accurate site survey captures existing roof structure, dimensions and constraints before any design work begins.
Proposed plans, elevations and sections are prepared, testing permitted development limits or preparing a full planning application.
The relevant borough application is submitted, with decision timescales typically 8 weeks for householder applications.
Structural calculations and Building Regulations drawings are finalised so builders can price accurately and Building Control can approve the works.
Notices are served on affected neighbours, with a two-month response period before works can commence where required.
On-site build typically takes 6–10 weeks for a dormer or hip-to-gable conversion, longer for a mansard.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Build costs typically range from £45,000 for a simple rooflight conversion to £130,000+ for a full mansard conversion, with dormer and hip-to-gable conversions falling between £55,000 and £95,000 — figures exclude drawings, structural fees and finishes.
Many loft conversions proceed under permitted development, subject to volume limits of 40 cubic metres (terraced) or 50 cubic metres (detached/semi-detached). Flats, conservation areas, Article 4 land and mansard-style conversions typically require a full householder planning application.
Dormer conversions are generally cheaper than hip-to-gable conversions, since a hip-to-gable requires rebuilding an entire roof slope into a vertical wall, involving more structural work and materials.
Allow roughly 8 weeks for a planning decision if required, plus time for structural design and party wall notices, then 6–10 weeks for construction on a standard dormer or hip-to-gable conversion — mansards typically take longer.
If the property shares a party wall with a neighbour — as most London terraces and semis do — and the conversion involves work to or near that wall, the Party Wall etc. Act 1996 applies, requiring formal notice and often a party wall award.
A policy-compliant, well-documented application improves outcomes everywhere; MHCLG data analysed by GetPlanningPermission shows approval rates as high as 88% for householder applications in top-performing authorities like Charnwood during 2025–26, reflecting the value of accurate, professionally prepared drawings.