MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Listed building consent drawings in Marine — historic building fabric recorded before alteration
Marine · Listed Building Consent

Listed building consent drawings in Marine

Listed building consent drawings for Marine — measured as existing, proposed in the same detail, and supported by a heritage statement that answers Arun District Council's conservation officer on the terms the 1990 Act actually sets.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Householder planning in Marine — the record

Arun District Council granted 94% of the householder planning decisions it made in its latest published year — 7 points above the 87% England-wide householder average. Marine contains Bognor Regis (Aldwick Road), Bognor Regis (The Steyne and Waterloo Square) conservation areas (Bognor Regis (Aldwick Road) designated 1994), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901) and Edwardian (1901–1910) housing stock sets the design brief on most streets.

The permitted-development ceilings are fixed: 40m³ of new roof volume for a terraced loft and 50m³ for a semi or detached house under Class B, plus a 3m single-storey rear extension on a terrace or 4m on a detached house under Class A. In conservation areas such as Bognor Regis (Aldwick Road) and Bognor Regis (The Steyne and Waterloo Square) those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Marine is determined against an 8-week statutory target.

Bognor Regis (Aldwick Road) (conservation area designated in 1994), Bognor Regis (The Steyne and Waterloo Square) (conservation area designated in 1994) and Bognor Regis (civil parish within Marine) — these are the Marine pockets our drawings cover most. Heritage designations here include Bognor Regis (Aldwick Road) and Bognor Regis (The Steyne and Waterloo Square). Arun District Council weighs each proposal against Arun District Council's adopted local plan and its householder design guidance, where the 4,010 homes here are 18% pre-1900, 15% 1900-1918, 15% 1983-1992, which is what sets the realistic roof and rear-projection options. On roofs the borough is steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and pitched and hipped roofs with generous eaves typical of Edwardian building, over Victorian and earlier houses (18% of 4,010 homes), Edwardian houses (15%) and 1980s estate houses (15%).

Marine: the local constraints that decide your scheme

Before anything is drawn we check your address against the designations that apply in Marine: Bognor Regis (Aldwick Road) (conservation area designated in 1994) and Bognor Regis (The Steyne and Waterloo Square) (conservation area designated in 1994). Inside those boundaries permitted development is curtailed and Arun District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Marine takes in Bognor Regis. No Article 4 direction is recorded for Arun District Council, but Marine's 2 conservation areas still limit permitted development on those streets.

On stock, Marine is Victorian and earlier houses (18% of 4,010 homes), Edwardian houses (15%) and 1980s estate houses (15%) — which is why steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and pitched and hipped roofs with generous eaves typical of Edwardian building govern what a loft or rear projection can realistically be. Arun District Council decided 453 householder applications in the latest published year and granted 94%, with 99% issued inside the eight-week target. That decision record, not a national figure, is what we design to.

The full build-period split for Marine runs pre-1900 18% (720 homes), 1900-1918 15% (610 homes), 1919-1929 9% (360 homes), 1930-1939 9% (380 homes), 1945-1954 0% (20 homes), 1955-1964 7% (270 homes), 1965-1972 6% (250 homes), 1973-1982 8% (320 homes), 1983-1992 15% (600 homes), 1993-1999 3% (120 homes) and 2000-2008 4% (150 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Arun District Council also decides for Angmering & Findon, Arundel & Walberton, Barnham, Beach, Bersted, East Preston, Hotham and Orchard, so a decision in Marine sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

Marine housing stock and council decisions, in figures

Published figures for Marine and Arun District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureMarine
Dwellings recorded4,010
Built pre-1900720 (18%)
Built 1900-1918610 (15%)
Built 1919-1929360 (9%)
Built 1930-1939380 (9%)
Built 1945-195420 (0%)
Built 1955-1964270 (7%)
Built 1965-1972250 (6%)
Built 1973-1982320 (8%)
Built 1983-1992600 (15%)
Built 1993-1999120 (3%)
Built 2000-2008150 (4%)
Built before 191933%
Built 1919–193918%
Built 1945–200843%
Conservation areas in Marine2 (Bognor Regis (Aldwick Road), Bognor Regis (The Steyne and Waterloo Square))
Conservation areas district-wide23
Article 4 directions recorded0
Householder applications decided453
Householder applications granted94%
Decided within 8 weeks99%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Arun District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What consent actually protects in a Marine listed building

Listing protects the whole building, not the front elevation. Removing a partition, replacing a staircase balustrade, changing a floor finish, or lining a wall with insulation are all alterations to special interest, and all can require consent. That surprises owners far more often than the external rules do — and it is why the first deliverable on a listed project is an accurate record of what is there, not a proposal for what replaces it.

Marine sits within an area of Victorian and earlier houses (18% of 4,010 homes), Edwardian houses (15%) and 1980s estate houses (15%), and its designated heritage includes Bognor Regis (Aldwick Road) and Bognor Regis (The Steyne and Waterloo Square). Conservation-area designation and listing are different things and frequently overlap: a listed house inside a conservation area needs consent for internal work under the listing, and is judged on its contribution to the wider area under the designation. We establish both before proposing anything.

Section 16(2) of the 1990 Act requires Arun District Council to have special regard to the desirability of preserving the building, its setting and any features of special architectural or historic interest. In practice that means the drawings must show what is being lost as clearly as what is being gained, and the case for the intervention must be made on heritage terms rather than on convenience.

Survey drawing of listed building fabric in Marine

When do you need listed building consent in Marine?

Consent from Arun District Council is required for works affecting special interest. That commonly includes:

  • Removing, altering or forming internal walls, doorways or staircases
  • Replacing windows or doors, including like-for-like where detail changes
  • Re-roofing in a different material, or altering chimneys
  • Internal insulation, damp treatment or re-plastering in historic fabric
  • New services routed through historic fabric — heating, wiring, ventilation
  • Works to curtilage structures such as walls, outbuildings and railings
  • Demolition of any part of the building, however small
  • Signage, external lighting or satellite equipment fixed to the building

Marine heritage decisions — live from council data

Below is Arun District Council's real decision record, drawn from official planning statistics and refreshed as new data lands. Arun District Council granted 94% of its householder applications in the year to 31 March 2026, and Bognor Regis (Aldwick Road) shapes what is approved here. Listed applications are decided on the quality of the record and the justification, which is where most refusals actually originate.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

94%householder applications approved in Arun
87%national average — Arun is 7 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What gets consented on listed buildings in Marine

Across Bognor Regis (Aldwick Road), Bognor Regis (The Steyne and Waterloo Square) and Bognor Regis, the schemes that get consent tend to be reversible, legible and honest: new work that reads as new rather than as imitation, services routed in existing chases rather than cut into original fabric, and interventions concentrated in later or lower-significance parts of the building. Rear additions in a contemporary idiom are often accepted where a pastiche extension is refused.

Marine contains Bognor Regis (Aldwick Road), Bognor Regis (The Steyne and Waterloo Square) conservation areas (Bognor Regis (Aldwick Road) designated 1994), so materials, fenestration and roof form are assessed against the appraisal. Where planning permission is needed as well — for an extension, say — the two applications run in parallel and are usually determined together. We prepare them as a single coordinated set so the heritage case and the planning case do not contradict each other, which is a surprisingly common reason for a refusal on an otherwise sound scheme.

Listed building consent drawing pack for a property in Marine

Listed building work across Marine

We prepare listed building consent packs across Marine. A few of the areas where heritage work comes up most often:

Bognor Regis (Aldwick Road)

Listed building consent drawings for Bognor Regis (Aldwick Road) — conservation area designated in 1994 — surveyed as existing and drawn to the detail Arun District Council's conservation officer needs.

Bognor Regis (The Steyne and Waterloo Square)

Listed building consent drawings for Bognor Regis (The Steyne and Waterloo Square) — conservation area designated in 1994 — surveyed as existing and drawn to the detail Arun District Council's conservation officer needs.

Bognor Regis

Listed building consent drawings for Bognor Regis — civil parish within Marine — surveyed as existing and drawn to the detail Arun District Council's conservation officer needs.

Listed building consent or planning permission in Marine?

They are separate consents with different tests, and many projects need both.

ConsentWhat it coversFeeConsequence of proceeding without it
Listed building consentWorks affecting special interest, internal and externalNoneCriminal offence under section 9 of the 1990 Act
Planning permissionDevelopment — extensions, outbuildings, use changesPayableEnforcement action; may become immune after 10 years
Conservation area consent contextDemolition and character in a designated areaVariesEnforcement; prosecution for unauthorised demolition
Building regulationsStructure, fire, insulation, ventilationPayableEnforcement notice; problems on sale

Sources: Planning (Listed Buildings and Conservation Areas) Act 1990, sections 7, 9 and 16(2); Town and Country Planning Act 1990.

Four steps to consent on a Marine listed building

A process built around what a conservation officer actually assesses.

  1. 1

    Free initial check

    Send us the address and the listing entry. We confirm grade, what the listing covers, whether curtilage structures are caught, and how Arun District Council has treated comparable schemes.

  2. 2

    Measured record of the building

    We survey as existing in real detail — plans, elevations, sections and the features that carry the significance — because a proposal cannot be assessed against a record that does not exist.

  3. 3

    Proposal & heritage statement

    We draw the proposal in matching detail and write the heritage statement that identifies significance, impact and justification in the terms section 16(2) requires.

  4. 4

    Submission & follow-through

    We submit to Arun District Council, engage with the conservation officer, and revise the drawings free until the decision is issued.

Frequently asked questions

Do I need listed building consent for internal work in Marine?

Frequently, yes. Listing covers the whole building, so removing a partition, altering a staircase, replacing joinery or re-plastering historic surfaces can all require consent from Arun District Council. There is no internal exemption and no size threshold. The safe route is to establish what is significant before work is designed, which is what the measured survey is for. This applies to your Marine address specifically.

What happens if work is done without listed building consent in Marine?

Carrying out unauthorised works to a listed building is a criminal offence under section 9 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and it does not become lawful with the passage of time the way some planning breaches do. Arun District Council can require reinstatement. Where work has already happened, an application for retrospective consent is usually the right first step, and we can advise on it. This applies to your Marine address specifically.

Is there a fee for listed building consent in Marine?

No. Listed building consent applications carry no application fee, which sometimes leads owners to assume the process is lighter than a planning application. It is not — the evidence expected is greater, because the decision rests on the effect on special interest rather than on amenity, and an under-documented submission is the most common cause of delay. This applies to your Marine address specifically. Arun District Council is the decision-maker.

Do I need planning permission as well as listed building consent in Marine?

If the work is also development — an extension, an outbuilding, a change of use — then yes, and the two applications run in parallel to Arun District Council. Internal alterations usually need only listed building consent. Where both are required we prepare them as one coordinated set, because inconsistencies between the two submissions are a recurring reason for delay. This applies to your Marine address specifically.

Can I replace the windows in a listed building in Marine?

Sometimes, but rarely with modern units. Historic windows are often the single most significant surviving feature, and replacement is judged on the condition of the existing joinery and the accuracy of what replaces it — glazing bar profile, glass type, opening method and reveal depth all matter. Repair and secondary glazing are usually the route that gains consent, particularly inside designated areas such as Bognor Regis (Aldwick Road) and Bognor Regis (The Steyne and Waterloo Square). This applies to your Marine address specifically. Arun District Council is the decision-maker.

How long does listed building consent take in Marine?

The statutory target is eight weeks from validation for most applications, and thirteen for larger schemes. In practice the timetable is set by how complete the submission is: a conservation officer who has to ask what the existing fabric looks like will take longer than one who can see it. We submit a record that answers those questions upfront. This applies to your Marine address specifically. Arun District Council is the decision-maker.

How much do listed building drawings in Marine cost?

We quote each Marine listed project individually, because the survey effort depends entirely on the building's complexity and how much of the fabric the work touches, and send a fixed, no-obligation quote within one working day. It covers survey, drawings and heritage statement, with free revisions until Arun District Council decides. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Listed building consent drawings across Arun

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Marine