MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Listed building consent drawings in Judd — historic building fabric recorded before alteration
Judd · Listed Building Consent

Listed building consent drawings in Judd

Listed building consent drawings for Judd — measured as existing, proposed in the same detail, and supported by a heritage statement that answers Tonbridge and Malling Borough Council's conservation officer on the terms the 1990 Act actually sets.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Judd planning decisions and design rules

Tonbridge and Malling Borough Council granted 97% of the householder planning decisions it made in its latest published year — 10 points above the 87% England-wide householder average. Judd contains Haysden, Quarry Hill, Tonbridge, Tonbridge conservation areas (Haysden designated 1993), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901) and Edwardian (1901–1910) housing stock sets the design brief on most streets.

Before permission is required, Class B allows 40m³ of added loft volume on a terrace and 50m³ on a semi or detached house, and Class A allows a 3m single-storey rear extension on a terrace or 4m on a detached house. In conservation areas such as Haysden, Quarry Hill, Tonbridge and Tonbridge those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Judd is determined against an 8-week statutory target.

Haysden (conservation area designated in 1993), Quarry Hill, Tonbridge (conservation area designated in 1991) and Tonbridge (conservation area designated in 1969) — these are the Judd pockets our drawings cover most. Heritage designations here include Haysden, Quarry Hill, Tonbridge and Tonbridge. Tonbridge and Malling Borough Council weighs each proposal against Tonbridge and Malling Borough Council's adopted local plan and its householder design guidance, where the 2,950 homes here are 28% pre-1900, 13% 1983-1992, 13% 1900-1918, which is what sets the realistic roof and rear-projection options. On roofs the borough is steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and trussed-rafter roofs typical of 1980s building, over Victorian and earlier houses (28% of 2,950 homes), 1980s estate houses (13%) and Edwardian houses (13%).

Why a Judd scheme is judged on Judd terms

What is permitted in Judd turns on designation first, so that is where we start: Haysden (conservation area designated in 1993), Quarry Hill, Tonbridge (conservation area designated in 1991) and Tonbridge (conservation area designated in 1969). Inside those boundaries permitted development is curtailed and Tonbridge and Malling Borough Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

No Article 4 direction is recorded for Tonbridge and Malling Borough Council, but Judd's 3 conservation areas still limit permitted development on those streets.

On stock, Judd is Victorian and earlier houses (28% of 2,950 homes), 1980s estate houses (13%) and Edwardian houses (13%) — which is why steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building and trussed-rafter roofs typical of 1980s building govern what a loft or rear projection can realistically be. Tonbridge and Malling Borough Council decided 515 householder applications in the latest published year and granted 97%, with 49% issued inside the eight-week target. We draw to that record rather than to a national average.

The full build-period split for Judd runs pre-1900 28% (840 homes), 1900-1918 13% (370 homes), 1919-1929 8% (230 homes), 1930-1939 1% (20 homes), 1945-1954 7% (210 homes), 1955-1964 1% (30 homes), 1965-1972 9% (280 homes), 1973-1982 2% (70 homes), 1983-1992 13% (380 homes), 1993-1999 2% (60 homes) and 2000-2008 7% (200 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Tonbridge and Malling Borough Council also decides for Borough Green & Platt, Bourne, Hildenborough, Larkfield and Pilgrims with Ightham, so a decision in Judd sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

Judd by the published data

Published figures for Judd and Tonbridge and Malling Borough Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureJudd
Dwellings recorded2,950
Built pre-1900840 (28%)
Built 1900-1918370 (13%)
Built 1919-1929230 (8%)
Built 1930-193920 (1%)
Built 1945-1954210 (7%)
Built 1955-196430 (1%)
Built 1965-1972280 (9%)
Built 1973-198270 (2%)
Built 1983-1992380 (13%)
Built 1993-199960 (2%)
Built 2000-2008200 (7%)
Built before 191941%
Built 1919–19398%
Built 1945–200842%
Conservation areas in Judd3 (Haysden, Quarry Hill, Tonbridge…)
Conservation areas district-wide60
Article 4 directions recorded0
Householder applications decided515
Householder applications granted97%
Decided within 8 weeks49%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Tonbridge and Malling Borough Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What consent actually protects in a Judd listed building

Listing protects the whole building, not the front elevation. Removing a partition, replacing a staircase balustrade, changing a floor finish, or lining a wall with insulation are all alterations to special interest, and all can require consent. That surprises owners far more often than the external rules do — and it is why the first deliverable on a listed project is an accurate record of what is there, not a proposal for what replaces it.

Judd sits within an area of Victorian and earlier houses (28% of 2,950 homes), 1980s estate houses (13%) and Edwardian houses (13%), and its designated heritage includes Haysden, Quarry Hill, Tonbridge and Tonbridge. Conservation-area designation and listing are different things and frequently overlap: a listed house inside a conservation area needs consent for internal work under the listing, and is judged on its contribution to the wider area under the designation. We establish both before proposing anything.

Section 16(2) of the 1990 Act requires Tonbridge and Malling Borough Council to have special regard to the desirability of preserving the building, its setting and any features of special architectural or historic interest. In practice that means the drawings must show what is being lost as clearly as what is being gained, and the case for the intervention must be made on heritage terms rather than on convenience.

Survey drawing of listed building fabric in Judd

When do you need listed building consent in Judd?

Consent from Tonbridge and Malling Borough Council is required for works affecting special interest. That commonly includes:

  • Removing, altering or forming internal walls, doorways or staircases
  • Replacing windows or doors, including like-for-like where detail changes
  • Re-roofing in a different material, or altering chimneys
  • Internal insulation, damp treatment or re-plastering in historic fabric
  • New services routed through historic fabric — heating, wiring, ventilation
  • Works to curtilage structures such as walls, outbuildings and railings
  • Demolition of any part of the building, however small
  • Signage, external lighting or satellite equipment fixed to the building

Judd heritage decisions — live from council data

Below is Tonbridge and Malling Borough Council's real decision record, drawn from official planning statistics and refreshed as new data lands. Tonbridge and Malling Borough Council granted 97% of its householder applications in the year to 31 March 2026, and Haysden shapes what is approved here. Listed applications are decided on the quality of the record and the justification, which is where most refusals actually originate.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

97%householder applications approved in Tonbridge and Malling
87%national average — Tonbridge and Malling is 10 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What gets consented on listed buildings in Judd

Across Haysden, Quarry Hill, Tonbridge and Tonbridge, the schemes that get consent tend to be reversible, legible and honest: new work that reads as new rather than as imitation, services routed in existing chases rather than cut into original fabric, and interventions concentrated in later or lower-significance parts of the building. Rear additions in a contemporary idiom are often accepted where a pastiche extension is refused.

Judd contains Haysden, Quarry Hill, Tonbridge, Tonbridge conservation areas (Haysden designated 1993), so materials, fenestration and roof form are assessed against the appraisal. Where planning permission is needed as well — for an extension, say — the two applications run in parallel and are usually determined together. We prepare them as a single coordinated set so the heritage case and the planning case do not contradict each other, which is a surprisingly common reason for a refusal on an otherwise sound scheme.

Listed building consent drawing pack for a property in Judd

Listed building work across Judd

We prepare listed building consent packs across Judd. A few of the areas where heritage work comes up most often:

Haysden

Listed building consent drawings for Haysden — conservation area designated in 1993 — surveyed as existing and drawn to the detail Tonbridge and Malling Borough Council's conservation officer needs.

Quarry Hill, Tonbridge

Listed building consent drawings for Quarry Hill, Tonbridge — conservation area designated in 1991 — surveyed as existing and drawn to the detail Tonbridge and Malling Borough Council's conservation officer needs.

Tonbridge

Listed building consent drawings for Tonbridge — conservation area designated in 1969 — surveyed as existing and drawn to the detail Tonbridge and Malling Borough Council's conservation officer needs.

Listed building consent or planning permission in Judd?

They are separate consents with different tests, and many projects need both.

ConsentWhat it coversFeeConsequence of proceeding without it
Listed building consentWorks affecting special interest, internal and externalNoneCriminal offence under section 9 of the 1990 Act
Planning permissionDevelopment — extensions, outbuildings, use changesPayableEnforcement action; may become immune after 10 years
Conservation area consent contextDemolition and character in a designated areaVariesEnforcement; prosecution for unauthorised demolition
Building regulationsStructure, fire, insulation, ventilationPayableEnforcement notice; problems on sale

Sources: Planning (Listed Buildings and Conservation Areas) Act 1990, sections 7, 9 and 16(2); Town and Country Planning Act 1990.

Four steps to consent on a Judd listed building

A process built around what a conservation officer actually assesses.

  1. 1

    Free initial check

    Send us the address and the listing entry. We confirm grade, what the listing covers, whether curtilage structures are caught, and how Tonbridge and Malling Borough Council has treated comparable schemes.

  2. 2

    Measured record of the building

    We survey as existing in real detail — plans, elevations, sections and the features that carry the significance — because a proposal cannot be assessed against a record that does not exist.

  3. 3

    Proposal & heritage statement

    We draw the proposal in matching detail and write the heritage statement that identifies significance, impact and justification in the terms section 16(2) requires.

  4. 4

    Submission & follow-through

    We submit to Tonbridge and Malling Borough Council, engage with the conservation officer, and revise the drawings free until the decision is issued.

Frequently asked questions

Do I need listed building consent for internal work in Judd?

Frequently, yes. Listing covers the whole building, so removing a partition, altering a staircase, replacing joinery or re-plastering historic surfaces can all require consent from Tonbridge and Malling Borough Council. There is no internal exemption and no size threshold. The safe route is to establish what is significant before work is designed, which is what the measured survey is for. This applies to your Judd address specifically.

What happens if work is done without listed building consent in Judd?

Carrying out unauthorised works to a listed building is a criminal offence under section 9 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and it does not become lawful with the passage of time the way some planning breaches do. Tonbridge and Malling Borough Council can require reinstatement. Where work has already happened, an application for retrospective consent is usually the right first step, and we can advise on it. This applies to your Judd address specifically.

Is there a fee for listed building consent in Judd?

No. Listed building consent applications carry no application fee, which sometimes leads owners to assume the process is lighter than a planning application. It is not — the evidence expected is greater, because the decision rests on the effect on special interest rather than on amenity, and an under-documented submission is the most common cause of delay. This applies to your Judd address specifically. Tonbridge and Malling Borough Council is the decision-maker.

Do I need planning permission as well as listed building consent in Judd?

If the work is also development — an extension, an outbuilding, a change of use — then yes, and the two applications run in parallel to Tonbridge and Malling Borough Council. Internal alterations usually need only listed building consent. Where both are required we prepare them as one coordinated set, because inconsistencies between the two submissions are a recurring reason for delay. This applies to your Judd address specifically.

Can I replace the windows in a listed building in Judd?

Sometimes, but rarely with modern units. Historic windows are often the single most significant surviving feature, and replacement is judged on the condition of the existing joinery and the accuracy of what replaces it — glazing bar profile, glass type, opening method and reveal depth all matter. Repair and secondary glazing are usually the route that gains consent, particularly inside designated areas such as Haysden and Quarry Hill, Tonbridge. This applies to your Judd address specifically. Tonbridge and Malling Borough Council is the decision-maker.

How long does listed building consent take in Judd?

The statutory target is eight weeks from validation for most applications, and thirteen for larger schemes. In practice the timetable is set by how complete the submission is: a conservation officer who has to ask what the existing fabric looks like will take longer than one who can see it. We submit a record that answers those questions upfront. This applies to your Judd address specifically. Tonbridge and Malling Borough Council is the decision-maker.

How much do listed building drawings in Judd cost?

We quote each Judd listed project individually, because the survey effort depends entirely on the building's complexity and how much of the fabric the work touches, and send a fixed, no-obligation quote within one working day. It covers survey, drawings and heritage statement, with free revisions until Tonbridge and Malling Borough Council decides. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Listed building consent drawings across Tonbridge and Malling

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Judd