MCIAT chartered drawings · Fixed fees across all 33 London boroughs
Services
Areas
Guides
ProcessOur promiseFAQ
Free approval reportGet my free quote020 7864 7245
Listed building consent drawings in Harbour Villages — historic building fabric recorded before alteration
Harbour Villages · Listed Building Consent

Listed building consent drawings in Harbour Villages

Listed building consent drawings for Harbour Villages — measured as existing, proposed in the same detail, and supported by a heritage statement that answers Chichester District Council's conservation officer on the terms the 1990 Act actually sets.

★★★★★ Rated 4.9/5 by London homeowners96% approval rate · 2,400+ drawings delivered
Share

Householder planning in Harbour Villages — the record

Chichester District Council granted 95% of the householder planning decisions it made in its latest published year — 8 points above the 87% England-wide householder average. Harbour Villages contains Bosham, Dell Quay, Donnington conservation areas (Bosham designated 1969), so materials, fenestration and roof form are assessed against the appraisal, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901) and postwar (1945–1970) housing stock sets the design brief on most streets.

The permitted-development ceilings are fixed: 40m³ of new roof volume for a terraced loft and 50m³ for a semi or detached house under Class B, plus a 3m single-storey rear extension on a terrace or 4m on a detached house under Class A. In conservation areas such as Bosham, Dell Quay and Donnington those rights are removed, so we confirm your exact address before a line is drawn. A validated householder application in Harbour Villages is determined against an 8-week statutory target.

Bosham (conservation area designated in 1969), Dell Quay (conservation area designated in 1976), Donnington (conservation area designated in 1976), Fishbourne (conservation area designated in 1981), Fishbourne (civil parish within Harbour Villages), Appledram (civil parish within Harbour Villages), Bosham (civil parish within Harbour Villages), Donnington (civil parish within Harbour Villages) and Chidham and Hambrook (civil parish within Harbour Villages) — these are the Harbour Villages pockets our drawings cover most. Heritage designations here include Bosham, Dell Quay, Donnington and Fishbourne. Chichester District Council weighs each proposal against the adopted Chichester local plan and Chichester District Council's design guidance for householder work, where the 4,690 homes here are 13% 1955-1964, 12% pre-1900, 11% 1965-1972, which is what sets the realistic roof and rear-projection options. On roofs the borough is shallow gabled roofs typical of that period's building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building, over late-1950s and early-1960s houses (13% of 4,690 homes), Victorian and earlier houses (12%) and late-1960s and early-1970s houses (11%).

Harbour Villages: the local constraints that decide your scheme

Before anything is drawn we check your address against the designations that apply in Harbour Villages: Bosham (conservation area designated in 1969), Dell Quay (conservation area designated in 1976), Donnington (conservation area designated in 1976) and Fishbourne (conservation area designated in 1981). Inside those boundaries permitted development is curtailed and Chichester District Council assesses materials, window detail and roof form against the area's own appraisal, so a scheme that would be waved through two streets away can need a full application here.

Beyond the designated areas, Harbour Villages takes in Fishbourne, Appledram, Bosham, Donnington and Chidham and Hambrook. No Article 4 direction is recorded for Chichester District Council, but Harbour Villages's 4 conservation areas still limit permitted development on those streets.

On stock, Harbour Villages is late-1950s and early-1960s houses (13% of 4,690 homes), Victorian and earlier houses (12%) and late-1960s and early-1970s houses (11%) — which is why shallow gabled roofs typical of that period's building and steeply pitched slate roofs, valley gutters and party parapets typical of pre-1900 building govern what a loft or rear projection can realistically be. Chichester District Council decided 470 householder applications in the latest published year and granted 95%, with 93% issued inside the eight-week target. That decision record, not a national figure, is what we design to.

The full build-period split for Harbour Villages runs pre-1900 12% (570 homes), 1900-1918 2% (90 homes), 1919-1929 1% (70 homes), 1930-1939 11% (500 homes), 1945-1954 6% (300 homes), 1955-1964 13% (610 homes), 1965-1972 11% (510 homes), 1973-1982 5% (230 homes), 1983-1992 7% (330 homes), 1993-1999 6% (270 homes) and 2000-2008 7% (340 homes). That distribution is why pre-1900 detailing dominates the drawings here, and it is measured from council-tax records rather than assumed from the street name.

Chichester District Council also decides for Chichester North, Fernhurst, Goodwood, Loxwood, Southbourne, The Witterings and Westbourne, so a decision in Harbour Villages sits inside a wider pattern of decisions we track across the same authority — useful when an officer cites a precedent from the next area over.

Harbour Villages housing stock and council decisions, in figures

Published figures for Harbour Villages and Chichester District Council. These are the numbers that decide what is realistic on your street, so we work from them rather than from national averages.

MeasureHarbour Villages
Dwellings recorded4,690
Built pre-1900570 (12%)
Built 1900-191890 (2%)
Built 1919-192970 (1%)
Built 1930-1939500 (11%)
Built 1945-1954300 (6%)
Built 1955-1964610 (13%)
Built 1965-1972510 (11%)
Built 1973-1982230 (5%)
Built 1983-1992330 (7%)
Built 1993-1999270 (6%)
Built 2000-2008340 (7%)
Built before 191914%
Built 1919–193912%
Built 1945–200855%
Conservation areas in Harbour Villages4 (Bosham, Dell Quay…)
Conservation areas district-wide23
Article 4 directions recorded0
Householder applications decided470
Householder applications granted95%
Decided within 8 weeks93%

Dwelling stock from VOA council-tax data at 31 March 2025; conservation-area and Article 4 counts from planning.data.gov.uk (MHCLG); decision figures are Chichester District Council's own, from MHCLG live table PS2 for the year to 31 March 2026.

What consent actually protects in a Harbour Villages listed building

Listing protects the whole building, not the front elevation. Removing a partition, replacing a staircase balustrade, changing a floor finish, or lining a wall with insulation are all alterations to special interest, and all can require consent. That surprises owners far more often than the external rules do — and it is why the first deliverable on a listed project is an accurate record of what is there, not a proposal for what replaces it.

Harbour Villages sits within an area of late-1950s and early-1960s houses (13% of 4,690 homes), Victorian and earlier houses (12%) and late-1960s and early-1970s houses (11%), and its designated heritage includes Bosham, Dell Quay, Donnington and Fishbourne. Conservation-area designation and listing are different things and frequently overlap: a listed house inside a conservation area needs consent for internal work under the listing, and is judged on its contribution to the wider area under the designation. We establish both before proposing anything.

Section 16(2) of the 1990 Act requires Chichester District Council to have special regard to the desirability of preserving the building, its setting and any features of special architectural or historic interest. In practice that means the drawings must show what is being lost as clearly as what is being gained, and the case for the intervention must be made on heritage terms rather than on convenience.

Survey drawing of listed building fabric in Harbour Villages

When do you need listed building consent in Harbour Villages?

Consent from Chichester District Council is required for works affecting special interest. That commonly includes:

  • Removing, altering or forming internal walls, doorways or staircases
  • Replacing windows or doors, including like-for-like where detail changes
  • Re-roofing in a different material, or altering chimneys
  • Internal insulation, damp treatment or re-plastering in historic fabric
  • New services routed through historic fabric — heating, wiring, ventilation
  • Works to curtilage structures such as walls, outbuildings and railings
  • Demolition of any part of the building, however small
  • Signage, external lighting or satellite equipment fixed to the building

Harbour Villages heritage decisions — live from council data

Below is Chichester District Council's real decision record, drawn from official planning statistics and refreshed as new data lands. Chichester District Council granted 95% of its householder applications in the year to 31 March 2026, and Bosham shapes what is approved here. Listed applications are decided on the quality of the record and the justification, which is where most refusals actually originate.

Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.

95%householder applications approved in Chichester
87%national average — Chichester is 8 points above the national average

Ready for drawings your council will approve?

Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.

Get your free fixed quote

60 seconds now. A fixed, no-obligation quote back within one working day — and we'll tell you if you don't even need planning.

No obligation · No spam · Reply within 1 working day

What gets consented on listed buildings in Harbour Villages

Across Bosham, Dell Quay and Donnington, the schemes that get consent tend to be reversible, legible and honest: new work that reads as new rather than as imitation, services routed in existing chases rather than cut into original fabric, and interventions concentrated in later or lower-significance parts of the building. Rear additions in a contemporary idiom are often accepted where a pastiche extension is refused.

Harbour Villages contains Bosham, Dell Quay, Donnington conservation areas (Bosham designated 1969), so materials, fenestration and roof form are assessed against the appraisal. Where planning permission is needed as well — for an extension, say — the two applications run in parallel and are usually determined together. We prepare them as a single coordinated set so the heritage case and the planning case do not contradict each other, which is a surprisingly common reason for a refusal on an otherwise sound scheme.

Listed building consent drawing pack for a property in Harbour Villages

Listed building work across Harbour Villages

We prepare listed building consent packs across Harbour Villages. A few of the areas where heritage work comes up most often:

Bosham

Listed building consent drawings for Bosham — conservation area designated in 1969 — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Dell Quay

Listed building consent drawings for Dell Quay — conservation area designated in 1976 — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Donnington

Listed building consent drawings for Donnington — conservation area designated in 1976 — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Fishbourne

Listed building consent drawings for Fishbourne — conservation area designated in 1981 — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Fishbourne

Listed building consent drawings for Fishbourne — civil parish within Harbour Villages — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Appledram

Listed building consent drawings for Appledram — civil parish within Harbour Villages — surveyed as existing and drawn to the detail Chichester District Council's conservation officer needs.

Listed building consent or planning permission in Harbour Villages?

They are separate consents with different tests, and many projects need both.

ConsentWhat it coversFeeConsequence of proceeding without it
Listed building consentWorks affecting special interest, internal and externalNoneCriminal offence under section 9 of the 1990 Act
Planning permissionDevelopment — extensions, outbuildings, use changesPayableEnforcement action; may become immune after 10 years
Conservation area consent contextDemolition and character in a designated areaVariesEnforcement; prosecution for unauthorised demolition
Building regulationsStructure, fire, insulation, ventilationPayableEnforcement notice; problems on sale

Sources: Planning (Listed Buildings and Conservation Areas) Act 1990, sections 7, 9 and 16(2); Town and Country Planning Act 1990.

Four steps to consent on a Harbour Villages listed building

A process built around what a conservation officer actually assesses.

  1. 1

    Free initial check

    Send us the address and the listing entry. We confirm grade, what the listing covers, whether curtilage structures are caught, and how Chichester District Council has treated comparable schemes.

  2. 2

    Measured record of the building

    We survey as existing in real detail — plans, elevations, sections and the features that carry the significance — because a proposal cannot be assessed against a record that does not exist.

  3. 3

    Proposal & heritage statement

    We draw the proposal in matching detail and write the heritage statement that identifies significance, impact and justification in the terms section 16(2) requires.

  4. 4

    Submission & follow-through

    We submit to Chichester District Council, engage with the conservation officer, and revise the drawings free until the decision is issued.

Frequently asked questions

Do I need listed building consent for internal work in Harbour Villages?

Frequently, yes. Listing covers the whole building, so removing a partition, altering a staircase, replacing joinery or re-plastering historic surfaces can all require consent from Chichester District Council. There is no internal exemption and no size threshold. The safe route is to establish what is significant before work is designed, which is what the measured survey is for. This applies to your Harbour Villages address specifically.

What happens if work is done without listed building consent in Harbour Villages?

Carrying out unauthorised works to a listed building is a criminal offence under section 9 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and it does not become lawful with the passage of time the way some planning breaches do. Chichester District Council can require reinstatement. Where work has already happened, an application for retrospective consent is usually the right first step, and we can advise on it. This applies to your Harbour Villages address specifically.

Is there a fee for listed building consent in Harbour Villages?

No. Listed building consent applications carry no application fee, which sometimes leads owners to assume the process is lighter than a planning application. It is not — the evidence expected is greater, because the decision rests on the effect on special interest rather than on amenity, and an under-documented submission is the most common cause of delay. This applies to your Harbour Villages address specifically. Chichester District Council is the decision-maker.

Do I need planning permission as well as listed building consent in Harbour Villages?

If the work is also development — an extension, an outbuilding, a change of use — then yes, and the two applications run in parallel to Chichester District Council. Internal alterations usually need only listed building consent. Where both are required we prepare them as one coordinated set, because inconsistencies between the two submissions are a recurring reason for delay. This applies to your Harbour Villages address specifically.

Can I replace the windows in a listed building in Harbour Villages?

Sometimes, but rarely with modern units. Historic windows are often the single most significant surviving feature, and replacement is judged on the condition of the existing joinery and the accuracy of what replaces it — glazing bar profile, glass type, opening method and reveal depth all matter. Repair and secondary glazing are usually the route that gains consent, particularly inside designated areas such as Bosham and Dell Quay. This applies to your Harbour Villages address specifically. Chichester District Council is the decision-maker.

How long does listed building consent take in Harbour Villages?

The statutory target is eight weeks from validation for most applications, and thirteen for larger schemes. In practice the timetable is set by how complete the submission is: a conservation officer who has to ask what the existing fabric looks like will take longer than one who can see it. We submit a record that answers those questions upfront. This applies to your Harbour Villages address specifically. Chichester District Council is the decision-maker.

How much do listed building drawings in Harbour Villages cost?

We quote each Harbour Villages listed project individually, because the survey effort depends entirely on the building's complexity and how much of the fabric the work touches, and send a fixed, no-obligation quote within one working day. It covers survey, drawings and heritage statement, with free revisions until Chichester District Council decides. Call 020 7864 7245 to start.

Planning approval report

Know your approval odds before you spend a penny on drawings

Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.

Listed building consent drawings across Chichester

Same fixed quotes, same fast drawings — wherever your project is.

Other planning services in Harbour Villages