
The fast route to a deep single-storey rear extension in Dartford — up to 6 metres on an attached house or 8 on a detached one — via Dartford Borough Council's prior approval scheme rather than a full planning application.
Dartford Borough Council granted 82% of the householder planning decisions it made in its latest published year — 5 points below the 87% England-wide householder average. Ebbsfleet Garden City in the Thames Gateway is the dominant strategic growth focus, shaping the borough's housing numbers, which is where a policy-literate drawing pack earns its keep. Its dominant Victorian (1837–1901), Edwardian (1901–1910), interwar (1918–1939) and postwar (1945–1970) housing stock sets the design brief on most streets.
Class A and Class B set the thresholds — a rear dormer to 40m³ on a terrace or 50m³ on a semi or detached, and a single-storey rear extension to 3m on a terrace or 4m on a detached house — beyond which Dartford Borough Council needs a full application. Dartford carries at least one Article 4 direction, and conservation areas including Dartford Town Centre, Greenhithe and Southfleet remove those rights outright, so we confirm your exact address before a line is drawn. A validated householder application in Dartford is determined against an 8-week statutory target.
Dartford town centre (Victorian and Edwardian terraces and a commercial core within the largest conservation area), Greenhithe (a historic Thames-side riverside village conservation area), Stone (mixed interwar and postwar residential along the A226 corridor), Wilmington (village-edge conservation character at Church Hill), Southfleet (a rural conservation village of older vernacular stock) and Ebbsfleet (new-build garden-city development of modern estates) — these are the Dartford pockets our drawings cover most. Heritage designations here include Dartford Town Centre, Greenhithe, Southfleet, Hook Green, Church Hill, Wilmington and Red Street. Dartford Borough Council weighs each proposal against the Dartford Local Plan (adopted April 2024), superseding the 2011 Core Strategy, where the strategically important Thames-side regeneration corridor drives large brownfield allocations near the river. Converted flats are present in the town centre but the borough remains house-dominated; converted flats hold no householder permitted-development rights.. On roofs the borough is pitched slate and clay-tile roofs on the terraces and low-pitch and hipped roofs on the modern Ebbsfleet estates, over Victorian and Edwardian terraces around the town centre, interwar and postwar semi-detached suburbs, Thames-side estates and large-scale contemporary new-build at Ebbsfleet Garden City.
The ordinary Class A limits stop a single-storey rear extension at 3 metres on an attached house and 4 on a detached one. The larger home extension scheme doubles both, on condition that the council is told first. That notification is not an application for permission — the council cannot refuse on design, materials or policy grounds. It can only consider the effect on the amenity of adjoining premises, and only if a neighbour actually objects during the 21-day consultation.
The other conditions still apply and are strict: single storey only, no higher than 4 metres, eaves no higher than the existing eaves, and no more than half the land around the original house covered. It is not available on designated land, so a house in a conservation area such as Dartford Town Centre and Greenhithe cannot use it at all. Materials must be similar to the existing house, and the extension must not include a veranda, balcony or raised platform.
Dartford is largely Victorian and Edwardian terraces around the town centre, interwar and postwar semi-detached suburbs, Thames-side estates and large-scale contemporary new-build at Ebbsfleet Garden City. Ebbsfleet Garden City in the Thames Gateway is the dominant strategic growth focus, shaping the borough's housing numbers, which matters here because an objecting neighbour puts amenity squarely in front of a case officer. Dartford maintains a formal register of Article 4 directions that withdraw permitted-development rights in parts of its conservation areas where unmanaged alterations would erode local character.

The scheme is available where all of these hold. Fail any one and it is a full application to Dartford Borough Council instead:
We prepare the notification pack Dartford Borough Council needs — plans, elevations, a site plan with the adjoining owners identified — and manage the 21-day neighbour consultation so the 42-day clock is not restarted by an incomplete submission.
Below is Dartford Borough Council's real householder decision record, drawn from official planning statistics and refreshed as new data lands. Dartford grants a slightly-below-average share of householder applications, with flat and HMO conversions treated more restrictively than straightforward house extensions. Prior approval turns on neighbour amenity alone, so the drawings that matter are the ones showing the relationship to the boundary.
Source: MHCLG planning application statistics (householder decisions, England, 1 April 2025 - 31 March 2026). Compare every borough on our London approval-rate league table.
Tell us about your project and get a fixed, no-obligation quote back within one working day. If you don't need planning permission at all, we'll tell you that too — for free.
Across Dartford town centre, Greenhithe and Stone, the notifications that clear without objection are the ones that treat the neighbour as the audience. We show the extension in section against the boundary, demonstrate the 45-degree daylight relationship to the nearest habitable window, and where the plot is tight we taper the depth away from the boundary rather than running the full 6 metres to the fence.
The strategically important Thames-side regeneration corridor drives large brownfield allocations near the river. Where an objection does arrive, the council's assessment is narrow: loss of light, outlook and overbearing effect on the adjoining property, nothing else. A pack that has already answered those three points on the drawings usually survives an objection, whereas one that leaves them to the officer's imagination usually does not.

We prepare prior-approval notifications across Dartford. A few of the areas where deep rear extensions come up most often:
Prior approval drawings for Dartford town centre — Victorian and Edwardian terraces and a commercial core within the largest conservation area — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Prior approval drawings for Greenhithe — a historic Thames-side riverside village conservation area — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Prior approval drawings for Stone — mixed interwar and postwar residential along the A226 corridor — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Prior approval drawings for Wilmington — village-edge conservation character at Church Hill — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Prior approval drawings for Southfleet — a rural conservation village of older vernacular stock — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Prior approval drawings for Ebbsfleet — new-build garden-city development of modern estates — dimensioned to the 6m and 8m limits and prepared for Dartford Borough Council's neighbour consultation.
Same extension, two routes, very different tests.
| Route | Depth allowed | What the council may consider | Timescale |
|---|---|---|---|
| Ordinary Class A permitted development | 3m attached / 4m detached | Nothing — no application needed | Immediate |
| Larger home extension prior approval | 6m attached / 8m detached | Amenity of adjoining premises, only if a neighbour objects | 21-day consultation, 42-day determination |
| Full householder application | No fixed limit | Design, materials, policy, amenity, everything | 8-week target |
| Any of these on designated land | 3m / 4m only | Prior approval scheme unavailable | Full application beyond the limits |
Limits and procedure from the GPDO 2015, Schedule 2, Part 1, Class A and paragraph A.4, made permanent by amendment in 2019.
A process built around the 21-day consultation, which is where these schemes are won or lost.
Send us your Dartford postcode and house type. We confirm whether the property is on designated land, whether the scheme is available, and what depth you can realistically take.
We measure the original rear wall, eaves height, boundary distances and the neighbouring windows that the amenity assessment will turn on.
We draw the extension to the 6m or 8m limit with the boundary relationship shown in section, and prepare the written description and adjoining-owner details Dartford Borough Council needs to start the consultation.
We submit, track the 21-day consultation and the 42-day determination, respond to any objection on amenity grounds, and revise free until the decision.
Three metres on a terraced or semi-detached house and four on a detached one under ordinary permitted development. Under the larger home extension prior approval scheme those double to six and eight metres, provided you notify Dartford Borough Council before starting and the conditions on height, materials and land coverage are met. The scheme is not available on designated land.
It is a notification, not an application for permission. You tell Dartford Borough Council what you intend to build, it writes to the adjoining owners, and they have 21 days to object. If nobody objects, you may build. If someone does, the council assesses the effect on the amenity of adjoining premises and must decide within 42 days. Design and policy are not in scope.
The council then considers the impact on the amenity of the adjoining property — loss of light, loss of outlook, and overbearing effect — and nothing else. It cannot refuse because it dislikes the design or the materials. We prepare the drawings so those three questions are already answered in section and on the site plan, which is what usually carries an objected scheme through. This applies to your Dartford address specifically. Dartford Borough Council is the decision-maker.
No. The larger home extension scheme is unavailable on designated land, which includes conservation areas such as Dartford Town Centre and Greenhithe, national landscapes, national parks and world heritage sites. On those properties the ordinary 3-metre and 4-metre limits apply, and anything deeper needs a full householder application to Dartford Borough Council.
Twenty-one days for the neighbour consultation, and a maximum of 42 days from a valid submission for the council to determine it. If the council does not respond within 42 days you may proceed as notified. That deadline is the scheme's real advantage over a full application, and it is why validation completeness matters so much. This applies to your Dartford address specifically. Dartford Borough Council is the decision-maker.
Yes — always. Prior approval deals only with the planning position. A 6-metre rear extension still needs building control approval for foundations, structure, drainage, thermal performance and fire safety, and the beam over the opening into the existing house needs designing and calculating. We prepare both sets so the notified scheme is the buildable one. This applies to your Dartford address specifically. Dartford Borough Council is the decision-maker.
We quote each Dartford scheme individually, because plot shape and the boundary relationship drive the work, and send a fixed, no-obligation quote within one working day. It covers the notification pack and free revisions until Dartford Borough Council determines it. Call 020 7864 7245 to start.
Answer five quick questions and get a free planning score for your exact address — instantly. Then, if you want the full picture, unlock the detailed analysis: your council's live approval rates, local precedents, constraints on your street and a step-by-step route to permission.
Same fixed quotes, same fast drawings — wherever your project is.